Roof Repairs BEQ HP145 & HP175
Awarded on June 15, 2026. Full description on SAM.gov.
Overview
- Posted
- July 27, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVFAC.NAVFAC ATLANTIC CMD.NAVFAC MID-ATLANTIC.NAVFACSYSCOM MID-ATLANTIC
- Place of performance
- Camp Lejeune, North Carolina, 28547
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 15, 2026
- Award amount (SAM.gov award notice)
- $1.4M
Identifiers
- Solicitation number
- N4008526R9033
- Notice ID
- 974fcb2612924063947d65cc6d16f05f
- Award number (PIID)
- N4008524D0103
Description
Only Roofing MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Award Overview
Award Number
N4008524D0103
Award Amount (SAM.gov award notice)
$1.4M
Award Date
Jun 15, 2026
Awardee
Awardee UEI
GSHPLGEBP4E3
Awardee CAGE Code
71VX4
Awardee Address
Jacksonville, NC 28546, UNITED STATES
Delivery Order Number
N4008526F1071
Original Solicitation
Notice ID: 974fcb2612924063947d65cc6d16f05f
Posted Date: Jul 27, 2026
Original Response Deadline: Not specified
Task Orders Under This IDV
Top 10 by total obligated
- $1.4MSigned Jun 15, 2026
- $897.0KSigned Sep 28, 2025
- $897.0KSigned Apr 24, 2026
- $5.0KSigned Sep 12, 2024
More From This Vendor
Top 5 most recent
- $1.4MSigned Jun 15, 2026
- $897.0KSigned Apr 24, 2026
- $897.0KSigned Sep 28, 2025
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (11)
- Download
Amend 0003.pdf
492 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Amend 0002.pdf
105 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Amend 0001.pdf
34 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
07 61 15.00 20 ALUMINUM STAND SEAM.pdf
103 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
26M076CN BEQ HP145- BEQ HP175 Roof Repairs PD.pdf
61 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
26M076CN BEQ HP145- BEQ HP175 Roof Repairs SOW.pdf
2.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
26M076CN BEQ HP145- BEQ HP175 Roof Repairs SR.pdf
88 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Combined DIV 01 DBB SPECS.pdf
555 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf
4.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Pricing Sheet Awarding All Options 26-0422.pdf
74 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
RFP 26-0422.pdf
108 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
Roof Repairs BEQ HP145 & HP175
- 5Version 5Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Roof Repairs BEQ HP145 & HP175
Other notices for this solicitation
- Combined SynopsisRelated noticeApr 29, 2026
Roof Repairs BEQ HP145 & HP175
- Combined SynopsisRelated noticeMay 13, 2026
Roof Repairs BEQ HP145 & HP175
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This construction requirement for Facility 541 involves a central modified-bitumen roof and three lower standing seam metal (SSM) roofs. The project replaces the central built-up roof with a new TPO system and adds a parapet on all four sides. The East and North SSM roofs will be removed down to the metal deck, receive new nail-base insulation, and be reconstructed with new SSM roofing. Work on the East SSM roof is limited to what is shown on the construction drawings and incidental related tasks. All work shall be completed in full accordance with the project specifications and drawings. | 84% | Solicitation | 06/12/2026 |
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. | 82% | Combined Synopsis | 11/19/2026 |
Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. | 75% | Combined Synopsis | 12/04/2026 |
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. | 75% | Solicitation | 11/09/2026 |
M&R MACC Only M&R MACC Contractors listed on the General Requirements cover page may submit a propsal for this ROICC Camp Lejeune area of responsibility project. See attached dcocuments for scope of work and any applicable drawings. | 75% | Combined Synopsis | 11/16/2026 |
Additional Details
Solicitation Number
N4008526R9033
Archive Date
Jul 27, 2026
Office Address
NORFOLK, VA, 23511-0395