REMEDIATION AND RESTORATION ACTIVITIES
Cancelled on SAM.gov (notice posted June 11, 2026). Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- June 11, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationOFFICE OF THE SECRETARY
Notice details
- Office
- 6913G6 VOLPE NATL TRANS SYS CNTR
- Place of performance
- Chantilly, Virginia, 20151
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6913G626Q300029
- Notice ID
- 8bf76b2a5c25401cb9b2882e3c20e733
Description
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination.
I) SITE FOR CONTAMINATED SOIL REMEDIATION: The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed: BHM ASR – Birmingham, AL (33.57378°, -86.75671°); CXY LOM – New Cumberland, PA (40.178196°, -77.005692°); and IADN NASEB – Chantilly, VA (38.958736°, -77.43499°)
SITE ACTIVITIES:
The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.
II) TASKS TO BE PERFORMED
The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement.
a) Remediation and Restoration Work Plan
The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.
This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2.
The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work.
Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks.
b) Technical Approach
- Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration, - Identification of required work permits
- Site Safety Health Plan (SSHP)
- Risk Management Plan
- Identification of major risks
- Risk mitigation plan
The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
c) Contaminated Soil Remediation
Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA’s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits.
See SOW for additional details.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
6913G626Q300029 RFQ.pdf
229 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachments I-III 5-27-26.pdf
366 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment IV - BHM ASR SI Report Final .pdf
21 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment V - CXY LOM SSR.rev.0.pdf
18 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment VI- IADN NASEB PA SI Report 11-2024.pdf
1.8 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment VII - WD-2015-4225 SAM.pdf
68 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment VIII - WD 2015-4281 SAM.pdf
2.0 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
AttachmentI IX - WD 2015-4591 - SAM.pdf
68 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment X Instructions 5-27-26.pdf
160 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment XI Pricing.pdf
84 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
REMEDIATION AND RESTORATION ACTIVITIES
- 2Version 2Combined Synopsis/SolicitationCancelledArchivedCurrent
REMEDIATION AND RESTORATION ACTIVITIES
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
6913G626Q300029
Archive Date
Jun 25, 2026
Office Address
CAMBRIDGE, MA, 02142