Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
Archived on October 4, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- September 30, 2025
- Notice type
- Solicitation
Notice details
- Office
- 244-NETWORK CONTRACT OFFICE 4 (36C244)
- Place of performance
- Coatesville VAMC 1400 Blackhorse Hill Road, Coatesville, 19320
- Last updated
- Nov 7, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C24425B0022
- Notice ID
- 808824552df645e7b5a9ff90ffb6b42d
Description
This project is for the installation of a sidewalk from Building 138 CLC along the east side of New York Avenue up to Blackhorse Hill Road, terminating in an 8 ft. wide by 10 ft. deep landing at Blackhorse Hill Road. The work must adhere to the current Architectural Barriers Act Accessibility Standards (ABAAS) and VA Barrier Free Design Guide, as well as VA Specifications. The contractor must provide all supervision, labor, supplies, transportation, and equipment necessary to complete the work. The contractor may work during business days 6:30a 4:00p. The period of performance for this work will be 60 days. This project is to include the installation of approximately 200 feet of reinforced >3000 psi concrete sidewalk six feet wide by 6 inches thick with >6 inches of mechanically tamped gravel base. The sidewalk shall not exceed a 1:20 pitch (5% grade) and shall have 6 ft. x 6 ft. clear flat landings at the proper ABAAS measured distances. Where a guardrail is indicated, extend the sidewalk 12 inches beyond the inside face of the handrail in compliance with ABAAS. Provide a maximum 2% cross slope where required to facilitate rainwater runoff. The sidewalk must not channel rainwater along its surface at any location. The sidewalk shall have soil retention curbs (hardscape) where necessary to prevent wash out. Provide four (4) American with Disabilities Act (ADA) crosswalk matts as required at roads and service drives. Pin with rebar when new sidewalks meet existing sidewalk. Install expansion and construction joints where required. The existing grade will require a cutting and filling as required to achieve an even pitch of the sidewalk route and of adjacent grass-area grades to gradually taper to existing from the edges of the new sidewalk to facilitate lawn maintenance. Grass-area grades are to match the grade of the sidewalk edges as closely as practical. Excavate, level, and finish-rake the surrounding grade. The construction perimeter is to be fenced in with 6-foot-high fence and locking gate. A 12 x40 space will be offered to the contractor for a construction trailer or dumpster at our laydown yard. Dumpsters must be secured to prevent entry. The contractor is to provide their own properly maintained Portable Potty. Contractor is to maintain a clean, orderly, and safe project perimeter to include dirt washouts, grass cutting, and orderly materials and equipment. The contractor shall provide underground utility investigation in consultation with all available VA documentation. The contractor will additionally utilize PA Call before you dig to assess any PECO and PA American Water lines along Blackhorse Hill Road. Contractors are to provide EPA approved concrete washout containers. All demolished concrete will be recycled, and receipts provided to the COR. The contractor shall wash off all vehicles to prevent the spread of mud. The contractor is responsible to identify all utilities underground with ground penetrating radar, keep a paper copy on the jobsite, and provide the digital mapping to the COR for the CVAMC database. The contractor shall repair all damages incurred in the vicinity of the construction site and have all grading to be hand raked, adding four inches of topsoil on the south side of Blackhorse Hill Road, grass-seeded and covered with straw-infused mesh and watered until project completion.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (11)
- Download
36C24425B0022.docx
22 KBAdded in Solicitation version 8Posted - Download
Drawing CS-1.03 Civil Utility Plan.pdf
1.4 MBAdded in Solicitation version 6Posted - Download
Install CLC Acc Rte-Site Visit-VHACOAHILTED_08252025_123538.pdf
1.5 MBAdded in Solicitation version 6Posted - Download
36C24425B0022_002.docx
17 KBAdded in Solicitation version 6Posted - Download
36C24425B0022 0001.pdf
126 KBAdded in Solicitation version 3Posted - Download
Standard Details.pdf
1.0 MBAdded in Solicitation version 2Posted - Download
CLC Accessible Route Specifications.pdf
385 KBAdded in Solicitation version 2Posted - Download
P09 CLC Accessible Route Part Plan.pdf
999 KBAdded in Solicitation version 2Posted - Download
P09 CLC Accessible Route Detail.pdf
773 KBAdded in Solicitation version 2Posted - Download
36C24425B0022_1.docx
3.4 MBAdded in Solicitation version 2Posted - Download
36C24425B0022.docx
19 KBAdded in Presolicitation version 4Posted
Lifecycle
- 4Version 4PresolicitationArchived
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
- 3Version 3SolicitationArchived
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
- 6Version 6SolicitationArchived
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
- 8Version 8SolicitationArchivedCurrent
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
36C24425B0022
Archive Date
Oct 4, 2025
Office Address
PITTSBURGH, PA, 15215