GovChime
Notice ID: ff00de106f9d46f7bad2541cf49a06e3SolicitationArchived

NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

Archived on August 26, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM EDT
Posted
August 7, 2026
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
Place of performance
U.S. Army Corps of EngineersNolin River Lake2150 Nolin Dam RoadMammoth Cave, KY 42259, Mammoth Cave, Kentucky, 42259
PSC
Y1FB: CONSTRUCTION OF RECREATIONAL BUILDINGS
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912QR26QA067
Notice ID
ff00de106f9d46f7bad2541cf49a06e3

Description

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY

THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.

36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.

THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.

IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.

***Amendment 0001****

Updated RFO clause 52.228-13 Alternate Payment Protections, section (a) is updated to allow the contractor to submit a Payment Bond or Irrevocable Letter of Credit as a form of payment protection. Offeror due date is updated on PIEE and SAM.gov to 10:00 AM EDT to match box 13(a) and the Special Instructions page of the solicitation. The offeror due date and time remains 10:00 AM EDT on 11 August 2026. Box 13(b) is updated to make an offer guarantee is not required. RFO clauses involving Bid Guarantees are deleted from the solicitation: 52.228-1 Bid Guarantee and 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee).

***Amendment 0001***

***Amendment 0002***

Two (2) questions were received by a potential offeror after a site visit. The amendment provides the questions and answers.

***Amendment 0002***

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (12)

  • Solicitation Amendment W912QR26QA0670002 SF 30.pdf

    3.8 MBAdded in Solicitation version 7Posted
    Download
  • Solicitation Amendment W912QR26QA0670001 SF 30.pdf

    3.8 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation - W912QR26QA067.pdf

    6.2 MBAdded in Solicitation version 2Posted
    Download
  • Appendix A Plan Sheets (MB 01_PB01_AB01_EN01 and EN02)_ NRL Tailwater Restroom.pdf

    1.8 MBAdded in Solicitation version 2Posted
    Download
  • SOW_NRL_Tailwater Restroom_Final.pdf

    882 KBAdded in Solicitation version 2Posted
    Download
  • Special Instructions.pdf

    97 KBAdded in Solicitation version 2Posted
    Download
  • ProjNet Instructions.pdf

    102 KBAdded in Solicitation version 2Posted
    Download
  • APPENDIX B_NRL Tailwater Restroom.pdf

    193 KBAdded in Solicitation version 2Posted
    Download
  • PIEE Directions.pdf

    122 KBAdded in Solicitation version 2Posted
    Download
  • Wage Determination.pdf

    74 KBAdded in Solicitation version 2Posted
    Download
  • Clauses.pdf

    57 KBAdded in Solicitation version 2Posted
    Download
  • REPS AND CERTS.pdf

    46 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice 7b033c159bfa4bc59b2063a002022e3b on SAM.gov

  2. 2
    Version 2SolicitationArchived

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice 8d4e99a768034ca882b40eef344bb48b on SAM.gov

  3. 3
    Version 3SolicitationArchived

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice e87f49c8e64741ad98bd5ea364aea23d on SAM.gov

  4. 4
    Version 4SolicitationArchived

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice 2bedb176127c449da1c23a53afbf96c1 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice 62deb1f4661b4838b3b27c993b42aa61 on SAM.gov

  6. 7
    Version 7SolicitationArchivedCurrent

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Notice ff00de106f9d46f7bad2541cf49a06e3 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912QR26QA067

Archive Date

Aug 26, 2026

Office Address

LOUISVILLE, KY, 40202-2230