Argon Piping Supply, Installation and Testing
Archived on August 11, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MDT
- Posted
- July 17, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 236210: Industrial Building Construction
- Agency
- Department of Energy
Notice details
- Office
- FERMILAB - DOE CONTRACTOR
- Place of performance
- Lead, South Dakota, 57754
- PSC
- Y1JZ: CONSTRUCTION OF MISCELLANEOUS BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 73573
- Notice ID
- 142c48620ba64615a2328803ff507fa2
Description
July 17, 2026 - Amendment 2 is issued to proviide additional questions and answers to this RFP. Documents are attached. The Proposal due date is unchanged, proposals are due on 27 July 26.
July 8, 2026 - Amendment 1 is issued to provide questions and answers to the RFP. Documents are contented in the attached link.
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.
This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (19)
- Download
Copy of 2026.07.10 - Questions #2 - U2623.xlsx
28 KBAdded in Solicitation version 4Posted - Download
Amend 02 to RFP LBNF-735735-JK.pdf
115 KBAdded in Solicitation version 4Posted - Download
K-3 FL-11_Rev1.pdf
332 KBAdded in Solicitation version 1Posted - Download
K-4 FL-57B (Rev. 1-07).pdf
22 KBAdded in Solicitation version 1Posted - Download
K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdf
362 KBAdded in Solicitation version 1Posted - Download
K-1 PUR-466_Proposal Certifications-.pdf
402 KBAdded in Solicitation version 1Posted - Download
J-11 Price Sheet including Fully Burdened Hourly Rate.xlsx
13 KBAdded in Solicitation version 1Posted - Download
J-10 South Dakota Wase Determinatin 20260016.txt
13 KBAdded in Solicitation version 1Posted - Download
J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdf
392 KBAdded in Solicitation version 1Posted - Download
J-7 014100-8-2025-South Dakota Quality Requirements.pdf
331 KBAdded in Solicitation version 1Posted - Download
J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docx
42 KBAdded in Solicitation version 1Posted - Download
J-6 013100_7-31-2025 FermiForward_South_Dakota.pdf
1.3 MBAdded in Solicitation version 1Posted - Download
J-5 010010_General_Requirements_SD_4_2025_FFDG.docx
97 KBAdded in Solicitation version 1Posted - Download
J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdf
3.4 MBAdded in Solicitation version 1Posted - Download
J-3 Argon Piping Supply and Install SOW (2).docx
4.2 MBAdded in Solicitation version 1Posted - Download
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf
314 KBAdded in Solicitation version 1Posted - Download
J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdf
327 KBAdded in Solicitation version 1Posted - Download
RFP Argon Piping R1 6.1.2026.docx
93 KBAdded in Solicitation version 1Posted - Download
1. RFP Letter 6.1.2026 R1.docx
49 KBAdded in Solicitation version 1Posted
Links (1)
- RFP Amendment 1fermicloud-my.sharepoint.comPosted
Lifecycle
- 1Version 1SolicitationArchived
Argon Piping Supply, Installation and Testing
- 2Version 2SolicitationArchived
Argon Piping Supply, Installation and Testing
- 4Version 4SolicitationArchivedCurrent
Argon Piping Supply, Installation and Testing
Similar Opportunities
Additional Details
Solicitation Number
73573
Archive Date
Aug 11, 2026
Office Address
Batavia, IL, 60510