Amend A0001: ZID ARTCC Door and Hardware Replacements-Indianapolis
Archived on January 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CST
- Posted
- December 9, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238350: Finish Carpentry Contractors
- Agency
- Department of TransportationFEDERAL AVIATION ADMINISTRATION
Notice details
- Office
- 6973GH FRANCHISE ACQUISITION SVCS
- Place of performance
- Indianapolis, Indiana, 46241
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6973GH-26-R-00039
- Notice ID
- 3c17967a7c4743319116f794deff4c61
Description
Amendment A0001 is hereby issued to add Attachment 9, Addendum #1. All other terms and conditions remain the same.
The Federal Aviation Administration (FAA) has a has a requirement for replace and/or install doors and/or hardware, with associated accessibility and security features, at five (5) openings at the FAA Indianapolis Air Route Traffic Control Center, Indianapolis, IN 46241.
An award for this requirement is anticipated to be made to the offeror with the lowest priced quote received on or before December 18, 2025 that can be determined fully responsive and responsible.
SOLICITATION
This is a competitive solicitation for a FIRM FIXED PRICE (FFP) contract. As such, any proposals received that take exception to the terms and conditions in this solicitation, proposes additional terms or conditions, or otherwise indicates within their proposal that their proposed pricing is not all inclusive of the FFP proposed, cannot be evaluated at face value in a competitive environment and will, therefore, be determined ineligible for a contract award.
Any activities or costs associated with offerors proposal development and submission thereof is at the risk of the offeror and will not be reimbursed by the FAA.
This solicitation is 100% set-aside for Small Businesses.
SITE VISIT
A site visit has been scheduled for November 25, 2025 at 10:00 a.m. ET. RSVP to
connie.m.houpt@faa.gov by 12:00 CT November 24, 2025.
Visitors will report to:
Indianapolis Air Route Traffic Control Center (guard shack)
1850 S. Sigsbee Street
Indianapolis, IN 46241
QUESTIONS
All questions regarding the project/specifications/plans must be received in writing via email to connie.m.houpt@faa.gov no later than December 11, 2025 by 1400 CT to allow for responses to be provided prior to due date for receipt of proposals. Please mark all emails with 6973GH-26-R-00039 ZID ARTCC Door and Hardware Replacements in the subject line.
OFFER DUE DATE
All responses to this solicitation for quotes must be received by email to connie.m.houpt@faa.gov on or before December 18, 2025, at 1400 CT.
Please include "SIR Response: 6973GH-26-R-00039 ZID ARTCC Door and Hardware Replacements” within the subject line of your email to the Contracting Officer: connie.m.houpt@faa.gov.
Please refer to SIR Section L Instructions, Conditions, and Notices to Bidders for instructions on submitted proposals. Three (3) Organizational Experience Forms, Attachment 4, must be submitted with the proposal.
Any responses received after the established date and time for receipt of proposals will not be considered in accordance with AMS provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals. If all requested information is not furnished, the vendor’s response may be determined unacceptable; therefore, not considered as one of the qualified companies. Oral or written communications with offerors, during the screening process, will be conducted if the FAA deems communication is necessary.
All Offerors must be registered in the System for Award Management, www.SAM.gov. Per the FAA Acquisition Management System (AMS), clause 3.3.1-33 System for Award Management (SAM), paragraph (b)(1) “By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.”
This Notice is for informational purposes for Minority, Women-Owned and Disadvantaged Business Enterprises: The Department of Transportation (DOT), Office of Small and Disadvantaged Business Utilization, has a program to assist small businesses, small businesses owned and controlled by a socially and economically disadvantaged individuals, and women-owned concerns to acquire short-term working capital assistance for transportation-related contracts. Loans are available under the DOT Short Term Lending Program (STLP) at prime interest rates to provide accounts receivable financing. The maximum line of credit is $750,000. For further information and applicable forms concerning the STLP, call the OSDBU at (800) 532-1169.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (11)
- Download
6973GH-26-R-00039 A0001.pdf
144 KBAdded in Solicitation version 3Posted - Download
Attachment 9 Addendum 1.pdf
78 KBAdded in Solicitation version 3Posted - Download
Attachment 1 SOW ZID ARTCC Door and Hardware Replacements_11.12.2025.pdf
654 KBAdded in Solicitation version 1Posted - Download
Attachment 7 WD IN IN20250002 dated 9-19-25.pdf
1.0 MBAdded in Solicitation version 1Posted - Download
Attachment 8 (DWG) ZID Door Replacement.pdf
1.0 MBAdded in Solicitation version 1Posted - Download
Attachment 2 Performance Bond.pdf
351 KBAdded in Solicitation version 1Posted - Download
Attachment 3 Payment Bond.pdf
332 KBAdded in Solicitation version 1Posted - Download
Attachment 4 Offeror Organizational Experience Form.pdf
395 KBAdded in Solicitation version 1Posted - Download
Attachment 5 WH347.pdf
183 KBAdded in Solicitation version 1Posted - Download
Attachment 6 Contractors Release Form DOT F4220.4.doc
53 KBAdded in Solicitation version 1Posted - Download
6973GH-26-R-00039.pdf
418 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
ZID ARTCC Door and Hardware Replacements-Indianapolis
- 3Version 3SolicitationArchivedCurrent
Amend A0001: ZID ARTCC Door and Hardware Replacements-Indianapolis
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Federal Correctional Complex at Terre Haute, Indiana: FCC TERRE HAUTE BUS CENTER PAINT AND ROOFING MATERIALS The Federal Correctional Complex (FCC) Terre Haute, Indiana, herein issues combined synopsis / solicitation 15B41827Q00000001 for the requirements of: FCC TERRE HAUTE BUS CENTER PAINT ROOFING MATERIALS. This requirement is for commercial MATERIALS ONLY. INSTALLATION IS NOT REQUIRED. Deliveries will be made to the FCI Terre Haute, 4700 Bureau Road South, Terre Haute, Indiana, 47802. This solicitation is restricted for 100% Small Business set-aside utilizing the North American Industrial Classification System (NAICS) code 238320 (Painting and Wall Covering Contractor) with a corresponding small business size standard of $19,000,000. The contract type is firm-fixed price for commercial products. The Government will award the responsible offeror whose bid conforms to the solicitation and is most advantageous to the Government. The Government will award the responsible quoter whose quote, conforming to the solicitation, is most advantageous to the Government based on best value. Best value will be determined by evaluating each quotation for one or more of the following: price, past performance, quality, technical specifications and lead time. Quality comparison with other offers, administrative/shipping cost and past performance that does not pose a risk to the government being the most important factors. Please input pricing that includes freight cost to our facility in your quotes. The government reserves the right to make a single award. Interested parties can submit their quote on the attached form 15B41827Q00000001 of this notice, which details the materials required. The quote will be evaluated per FAR 13.106-2 and the government may then issue a purchase order (contract) that must be signed by both parties to complete contractual agreement. The Federal Acquisition Regulation (FAR) 4.1102 requires all contractors seeking or currently doing business with the government to be registered with the System for Award Management (SAM) prior to award. Information can be obtained at https://www.sam.gov/. This solicitation and all subsequent information about this acquisition, including solicitation amendments, will also be distributed through sam.gov. Interested parties are responsible for monitoring sam.gov to ensure they have the most up-to-date information about this solicitation. The point of contact for all information regarding this solicitation is Richard Moothery, Supervisory Contract Specialist, at FCC Terre Haute, Indiana, with email address: rmoothery@bop.gov. Correspondence regarding this solicitation should be in writing via email (no phone calls please). The required number of performance days to complete the project is 15 calendar days. This timeframe consists of ordering and delivery of materials If you have questions about the System for Award Management (SAM), Government procurement in general, or need assistance in the preparation of your quote, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Payment will be made using Electronic Funds Transfer (EFT). Each offer is required per 52.212-3 to complete their representations and certifications via the On-line Representations and Certifications Applications (ORCA) at http://orca.bpn.gov. Faith-Based and Community Based Organizations (AUG) are included. Please quote only on those specified items, and ALL ITEMS MUST MEET REQUIRED SPECIFICATIONS AS PROVIDED. Do not change the item description or the unit of issue. ANY CHANGES TO THE SOLICITATION CAN RESULT IN THE GOVERNMENT REJECTING PART OR ALL OF THE QUOTE(S) SUBMITTED. "THIS SOLICITATION IS FOR ALL OR NONE". Completed offers must be emailed to rmoothery@bop.gov. You must fill out the following sections of the attached Request for Quote: sections 17a., 30a., 30b., 30c., and Section 1 of the commodity and services schedule; which includes the unit price and total amount. The deadline for interested parties to submit their quotes is Friday, November 20, 2026, at 11:00AM EST. Quotes received after the deadline of Friday, November 20, 2026 at 11:00 AM EST will be handled in accordance with FAR Part 52.212-1 (f) and will not be considered. Mailed quotes will not be accepted. Quotes must include the Unique Entity ID (UEI) code in section 17a., along with an estimated time of delivery. Payments will be made using Electronic Funds Transfer (EFT) or via Government Purchase Card for awards of $15,000.00 or less. | - | Combined Synopsis | 11/20/2026 |
The Government is canceling Solicitation No. 140RR027Q0011 for the EC-ECAO Exterior Door Replacement requirement because it was published inadvertently. The Government intended to conduct market research through a Sources Sought Notice and is not requesting quotations or offers at this time. No award will be made under this solicitation. The Government intends to issue a separate Sources Sought Notice to gather information from industry and support acquisition planning. If the requirement proceeds to a formal solicitation, the notice will be posted separately on SAM.gov. | - | Solicitation | 11/04/2026 |
This solicitation is for the contractor to furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to remove and replace existing control tower bridge crane and trolley at Cagles Mill Lake located at 11979 S. County Rd. 375 W., Poland, Indiana 47868. All work shall be performed in strict compliance with the attached specifications and all other terms, clauses, and conditions incorporated herein. Quotes are due on 28 July 2026 at 10:00 AM Eastern Time. NOTE: THIS RFQ IS 100% SMALL BUISNESS SET A SIDE. The NAICS code for this procurement is 238290. The size standard is $22M. The solicitation will be available on the web only. Telephone and Fax requests for this solicitation will not behonored. Project files are Portable Document Format (PDF) files and can view, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities. Amendments will be available from the sam.gov website by download only. Prior to submission of quotes all contractors must have an active registration in the System for Award Management (SAM) database. To register or update information go to http://www.SAM.gov. Questions may be addressed to ProjNet. This announcement serves as the advance notice. | - | Solicitation | 07/28/2026 |
| - | Awarded | Open | |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
Additional Details
Solicitation Number
6973GH-26-R-00039
Archive Date
Jan 2, 2026
Office Address
OKLAHOMA CITY, OK, 73125