SABER IDIQ
Archived on September 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:30 PM PDT
- Posted
- June 11, 2026
- Notice type
- Solicitation
- Set-aside
- HUBZone Set Aside
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR COMBAT COMMAND.FA4861 99 CONS LGC
- Place of performance
- Nellis AFB, Nevada, 89191
- PSC
- Z2JZ: REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA486125R0003
- Notice ID
- e6a20af122314b49add62b8607bed726
Description
NOTE: Due to system error. Amendment 008 (0008) does not exisit.
SABER IDIQ
SOLICITATION NUMBER: FA486125R0003
DISCLOSURE OF MAGNITUDE: between $100,000,000 and $250,000,000
BONDING CAPABILITY: $40M
COMPETITION INFORMATION: HUBZone Firms
PROPOSAL DUE DATE: 19 March 2026 @ 1430
CONTRACTING OFFICE: 99 CONS, Nellis AFB, NV 89191
CONTACT POINT: Corrine Lemon; corrine.lemon@us.af.mil; 702-652-6196
The 99th Contracting Squadron is soliciting a Simplified Acquisition for Base Engineering Requirements (SABER) for Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo and Nellis Test And Training Range (NTTR). The SABER will be an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design and/or construction projects that will be awarded via individual task orders. Paper copies will not be available.
Base Notice: The following viewers will be needed to view the solicitation: Microsoft Word (.doc), Adobe Acrobat Reader (.pdf), and WinZip (.zip or .exe.).
Task orders will provide a vehicle for execution of a broad range of projects, such as carpentry, road repair, roofing, excavation, interior/exterior electrical, steam fitting, HVAC, plumbing, sheet metal, fencing, demolition, fire protection, concrete, masonry, and other projects. In-house design capability or ready access to design capability is a must for projects including alteration and repair to existing infrastructure.
Period of Performance and Magnitude: The maximum ceiling amount (potential price of all task orders issued to SABER Awardee) is $185M. The period of performance on the SABER program will be for five (5) years with each contract year being an ordering period. Individual task orders are estimated to be between $15,000 and $4,000,000 and will vary in size and complexity. All work shall be in strict compliance with the specifications of the contract and specifications and drawings for each task order.
This will be a Competitive HUBZone Procurement limited to qualified/eligible HUBZone firms in the Small Business Administration. The applicable North American Industry Classification System (NAICS) code for this acquisition is Sector 23 Construction) with a small business size standard of NAICS code: 236220/ Size Std: $45M). The government intends to award one contract under this program.
The government intends to hold a site visit for the proposal demonstration project. A pre-proposal conference will be held on 29 October 2025 at 1300 at the Nellis AFB Theater. At the conclusion of the pre-proposal conference, a site visit at B10250 will be conducted approximately 1415 (subject to conclusion of the pre-proposal conference.)
Prospective contractors must be registered in the System for Award Management (SAM) database in order to be eligible for award. Registration requires applicants to have a CAGE and UEI. Registration may take up to three weeks to process. Recommend registering immediately in order to be eligible for timely award. All prospective offerors must go to http://www.sam.gov/ to add or update its representations and certifications record.
It should be noted that per IAW DAFMAN 16-201, foreign participation is not permitted at the prime contractor level.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (105)
- Download
Solicitation Amendment FA486125R00030017 SF 30.pdf
303 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030017.pdf
764 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030016.pdf
762 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030016 SF 30.pdf
409 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030015 SF 30.pdf
412 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030014.pdf
769 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030014 SF 30.pdf
422 KBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030013 SF 30.pdf
1.6 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030012 SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030012.pdf
1.7 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030011 SF 30 .pdf
1.6 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030011.pdf
1.7 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030010.pdf
1.7 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030010 SF 30.pdf
1.6 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030009.pdf
1.6 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030009_SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030007 SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment - FA486125R00030006.pdf
1.7 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030006 SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030005 SF 30.pdf
1.3 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030004 SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030003 SF 30 .pdf
1.3 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030002 SF 30.pdf
1.5 MBAdded in Solicitation version 23Posted - Download
Solicitation Amendment FA486125R00030001 SF 30.pdf
1.6 MBAdded in Solicitation version 23Posted - Download
1 - SABER SOW 7 Jan 2026.pdf
2.0 MBAdded in Solicitation version 23Posted - Download
2 - Price Schedule _13 Jan 2026.xlsx
49 KBAdded in Solicitation version 23Posted - Download
3 - Self Scoring Matrix 17 Feb 26.xlsx
103 KBAdded in Solicitation version 23Posted - Download
Att 3 -Self Scoring Matrix 3_Feb_2026.xlsx
103 KBAdded in Solicitation version 23Posted - Download
4 - PPQ _PAST_PERFORMANCE_QUESTIONNAIRE FA486125R0003.pdf
192 KBAdded in Solicitation version 23Posted - Download
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf
85 KBAdded in Solicitation version 23Posted - Download
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf
1.1 MBAdded in Solicitation version 23Posted - Download
7 - Nellis-Creech Electrical Req 2023-10-17.pdf
206 KBAdded in Solicitation version 23Posted - Download
8_Nellis-Creech Lighting Req 2019-01-22.pdf
31 KBAdded in Solicitation version 23Posted - Download
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf
61 KBAdded in Solicitation version 23Posted - Download
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf
46 KBAdded in Solicitation version 23Posted - Download
11_Nellis-Creech Plant List.pdf
15 KBAdded in Solicitation version 23Posted - Download
12 - Env Permit-ATP Guidance 2023.pdf
370 KBAdded in Solicitation version 23Posted - Download
13 - Work Clearance Triggers.pdf
154 KBAdded in Solicitation version 23Posted - Download
14_ACC Sole Source EMCS Letter.pdf
391 KBAdded in Solicitation version 23Posted - Download
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf
518 KBAdded in Solicitation version 23Posted - Download
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf
9.0 MBAdded in Solicitation version 23Posted - Download
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf
1.0 MBAdded in Solicitation version 23Posted - Download
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf
491 KBAdded in Solicitation version 23Posted - Download
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf
29 KBAdded in Solicitation version 23Posted - Download
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf
39 KBAdded in Solicitation version 23Posted - Download
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf
44 KBAdded in Solicitation version 23Posted - Download
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf
5.5 MBAdded in Solicitation version 23Posted - Download
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf
496 KBAdded in Solicitation version 23Posted - Download
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf
141 KBAdded in Solicitation version 23Posted - Download
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf
81 KBAdded in Solicitation version 23Posted - Download
26 - Connection Charge Agreement - 22 Feb 23.pdf
156 KBAdded in Solicitation version 23Posted - Download
27 - NTTR Visit Request - 27 Jan 2023.pdf
276 KBAdded in Solicitation version 23Posted - Download
28 - Nuclear Gauge Form 1.xlsx
30 KBAdded in Solicitation version 23Posted - Download
29 - Nuclear Gauge Form 2.docx
26 KBAdded in Solicitation version 23Posted - Download
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf
30 KBAdded in Solicitation version 23Posted - Download
31 - AF Form 3052 Cost Estimate Template.xlsx
74 KBAdded in Solicitation version 23Posted - Download
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx
502 KBAdded in Solicitation version 23Posted - Download
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf
99 KBAdded in Solicitation version 23Posted - Download
34 - Schedule of Values Template.xlsx
20 KBAdded in Solicitation version 23Posted - Download
35 - AF 66 Schedule of Material Submittals.xlsx
28 KBAdded in Solicitation version 23Posted - Download
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf
85 KBAdded in Solicitation version 23Posted - Download
37 - BUILDER Inventory Sheet.xlsx
193 KBAdded in Solicitation version 23Posted - Download
38_NTTR Automated Information System _AIS_ Equipment Form.pdf
1.8 MBAdded in Solicitation version 23Posted - Download
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf
206 KBAdded in Solicitation version 23Posted - Download
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf
237 KBAdded in Solicitation version 23Posted - Download
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf
293 KBAdded in Solicitation version 23Posted - Download
Atch 42 NV20250058 19Sep25 Hwy Clark.pdf
232 KBAdded in Solicitation version 23Posted - Download
Atch 43 NV20250001 1Aug25 NTTR.pdf
348 KBAdded in Solicitation version 23Posted - Download
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_28January2026 (003).pdf
274 KBAdded in Solicitation version 23Posted - Download
45 - Attachment Contract Information Sheet.pdf
57 KBAdded in Solicitation version 23Posted - Download
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf
7.2 MBAdded in Solicitation version 23Posted - Download
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf
11 MBAdded in Solicitation version 23Posted - Download
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf
7.7 MBAdded in Solicitation version 23Posted - Download
49 - As-Builts.pdf
25 MBAdded in Solicitation version 23Posted - Download
Atch 50_RFI Log_General Solicitation.xlsx
22 KBAdded in Solicitation version 23Posted - Download
Atch 51_RFI Log_ SABER Seed.xlsx
22 KBAdded in Solicitation version 23Posted - Download
Attachment 52 Nellis AFB Base Pass Request.xlsx
27 KBAdded in Solicitation version 23Posted - Download
Attachment 53 Gordian SABER Technical Specifications.pdf
25 MBAdded in Solicitation version 23Posted - Download
Attachment 54 Gordian SABER CTC.pdf
29 MBAdded in Solicitation version 23Posted - Download
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf
1.1 MBAdded in Solicitation version 23Posted - Download
(Attachment 56) SABER Seed SOO Honor Guard Building 10250 Attachment 2- HAZMAT Results 10250 Restrooms part 2.pdf
499 KBAdded in Solicitation version 23Posted - Download
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf
558 KBAdded in Solicitation version 23Posted - Download
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf
889 KBAdded in Solicitation version 23Posted - Download
(Attachment 59) SABER Seed SOO Honor Guard Building 10250 Attachment 6 - Floorplan Conceptual.pdf
294 KBAdded in Solicitation version 23Posted - Download
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf
1.6 MBAdded in Solicitation version 23Posted - Download
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf
409 KBAdded in Solicitation version 23Posted - Download
(Attachment 62)SABER Seed SOO Honor Guard Building 10250Attachment 9 -Asbestos and Lead testing for installing air compressor.pdf
2.3 MBAdded in Solicitation version 23Posted - Download
(Attachment 63) SABER Seed SOO Honor Guard Building 10250 Attachment 10 - Asbestos and Lead testing dated 24 February 2014.pdf
2.0 MBAdded in Solicitation version 23Posted - Download
(Attachment 64) SABER Seed SOO Honor Guard Building 10250 Attachment 11- Testing on exterior paint walls dated 6 November 2014.pdf
1.1 MBAdded in Solicitation version 23Posted - Download
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf
673 KBAdded in Solicitation version 23Posted - Download
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx
10 KBAdded in Solicitation version 23Posted - Download
(Attachment 67) SABER Seed SOO Honor Guard Building 10250 Attachment 14 - B10250 refurbish space conceptual visuals.pdf
209 KBAdded in Solicitation version 23Posted - Download
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf
83 KBAdded in Solicitation version 23Posted - Download
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png
259 KBAdded in Solicitation version 23Posted - Download
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf
204 KBAdded in Solicitation version 23Posted - Download
Attachment 71 SABER IDIQ Preproposal Conference Slides 29 October 2025 FA486125R0003.pptx
15 MBAdded in Solicitation version 23Posted - Download
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf
1.7 MBAdded in Solicitation version 23Posted - Download
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf
310 KBAdded in Solicitation version 23Posted - Download
Attach 74 SABER Seed Attachment 18 - Knox Box Location.pdf
5.1 MBAdded in Solicitation version 23Posted - Download
Attach 75 SABER Seed Attachment 19 - B10250 comm room.pdf
87 MBAdded in Solicitation version 23Posted - Download
76 - RFI Response Log General Solicitation 13_Jan 26.xlsx
63 KBAdded in Solicitation version 23Posted - Download
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx
49 KBAdded in Solicitation version 23Posted - Download
Att 78 RFI Log Additional Responses General Solicitation 27 Jan 2026_.xlsx
24 KBAdded in Solicitation version 23Posted - Download
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx
27 KBAdded in Solicitation version 23Posted - Download
Atch 80_ RFI Response Log_General Solicitation 9 March 2026.xlsx
23 KBAdded in Solicitation version 23Posted
Lifecycle
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 23
- 24Version 24Award Notice
Type changed from Solicitation to Award Notice
SABER IDIQ
Similar Opportunities
Additional Details
Solicitation Number
FA486125R0003
Archive Date
Sep 15, 2026
Office Address
NELLIS AFB, NV, 89191-7063