Locomotive 92-Day Periodic Safety Inspections
Awarded on July 27, 2026. Full description on SAM.gov.
Overview
- Posted
- July 27, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 488210: Support Activities for Rail Transportation
- Agency
- Department of TransportationOFFICE OF THE SECRETARY
Notice details
- Office
- 6913G6 VOLPE NATL TRANS SYS CNTR
- Place of performance
- Cambridge, Massachusetts
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jul 27, 2026
- Award amount (SAM.gov award notice)
- $511.9K
Identifiers
- Solicitation number
- 6913G626Q300009
- Notice ID
- 7fd35784d27849809c22506a146c2d75
- Award number (PIID)
- 6913G626P800036
Description
The U.S. Department of Transportation (DOT), Volpe National Transportation Systems Center, has formally awarded a single-award hybrid contract (firm-fixed-price and NTE reimburseable travel and ODC CLINs) 6913G626P800036 under Solicitation Number 6913G626Q300009. This action was conducted competitively as a total small business set-aside using simplified procedures for certain commercial services in accordance with FAR RFO Part 12 and FAR Subpart 13.5.
Award Overview
Award Number
6913G626P800036
Award Amount (SAM.gov award notice)
$511.9K
Award Date
Jul 27, 2026
Awardee
Awardee UEI
PXMEV64U3CK3
Awardee CAGE Code
9E0T6
Awardee Address
Mount Vernon, IL 62864, UNITED STATES
Original Solicitation
Notice ID: 7fd35784d27849809c22506a146c2d75
Posted Date: Jul 27, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $102.3KSigned Sep 1, 2026
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (14)
- Download
Attachment 2 - REVISED Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections (02.03..pdf
771 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
REVISED SF 1449 - 6913G626Q300009 (02.03.2026).pdf
164 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
REVISED Pricing Sheet (02.03.2026).pdf
103 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
6913G626Q300009 0003.pdf
91 KBAdded in Combined Synopsis/Solicitation version 10Posted - Download
Attachment 2 - REVISED Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections.pdf
673 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Questions Received with Answers - 6913G626Q300009 01.29.2026.pdf
258 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
REVISED SF 1449 - 6913G626Q300009.pdf
117 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
REVISED Pricing Sheet.pdf
59 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
6913G626Q300009 0002.pdf
91 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Attachment A - Locomotive 92 Day Inspection Dates 01.29.2026.xlsx
11 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
6913G626Q300009 0001.pdf
101 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
SF 1449 - 6913G626Q300009.pdf
103 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Attachment 1 - RFQ 6913G626Q300009.pdf
217 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Attachment 2 - Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections.pdf
241 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 2Version 2Combined Synopsis/SolicitationArchived
Locomotive 92-Day Periodic Safety Inspections
- 5Version 5Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Locomotive 92-Day Periodic Safety Inspections
Other notices for this solicitation
- Combined SynopsisRelated noticeJan 9, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 9, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 9, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 9, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 9, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 15, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 29, 2026
Locomotive 92-Day Periodic Safety Inspections
- Combined SynopsisRelated noticeJan 29, 2026
Locomotive 92-Day Periodic Safety Inspections
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a Request for Information (RFI) only. Purpose This RFI seeks information regarding providing Thermal Protection Systems (TPS) for railroad tank cars to the U.S. DOT Volpe Center. A qualified vendor must demonstrate they are able to provide either complete test specimens as detailed further below or sufficient materials to fabricate completed test specimens without the need for specialized facilities or techniques. Qualified vendors are requested to respond as detailed further below, which includes capability, small business classification, estimated lead time including any risks that may impact delivery, and any other industry concerns the government might consider before solicitation. The intent is to gather information to inform a possible future procurement or contract. Background The Federal Railroad Administration (FRA) is conducting research into the performance of TPS for railroad tank cars. TPS are designed to delay or prevent the catastrophic release of hazardous materials from a railroad tank car exposed to fires that may result from train derailments. In the FRA’s planned research, test specimens of TPS are to be evaluated in simulated pool fire and torch fire conditions similar to those defined in Appendix B to 49 CFR 179. The durations of the fire exposure would extend beyond the 100 minute pool fire and 30 minute torch fire duration specified in Appendix B to 49 CFR 179. Pool fire test specimens are applied to a 1 foot by 1 foot steel plate of nominal 0.625 inch thickness. Torch fire test specimens are applied to a 4 foot by 4 foot steel plate of nominal 0.625 inch thickness. The Volpe Center is looking to procure a minimum of two (2) pool fire test specimens and two (2) torch fire test specimens for each TPS. Multiple TPS of different construction from the same vendor may be considered. The Pipeline and Hazardous Materials Safety Administration (PHMSA) maintains a list of tank car TPS that have been tested and shown to comply with the requirements of Appendix B to 49 CFR Part 179. Inclusion on this list is not a requirement for a TPS to be used on a tank car. There is a preference of TPS that are currently on the PHMSA list and/or being used on tank cars, but other systems may be considered. Scope of Information Requested The U.S. DOT Volpe Center is seeking information from tank car thermal protection system manufacturers and/or vendors, on their willingness, ability, and requirements to provide the physical specimens as well as material and installation information needed to conduct the above fire testing research. Description of how the TPS is assembled. Example : 1 inch insulation – Brand XXX 1 inch fiberglass – generic 11 gauge steel jacket – generic 10 mils coating – Brand YYY, Component A and Component B in 1:1 volume ratio Include any relevant brand names or item numbers specific to this system. Also include any required surface preparation or other processing steps. Is the TPS currently used on railroad tank cars? If so, is it on the PHMSA approved list here: https://www.phmsa.dot.gov/standards-rulemaking/hazmat/tank-car-thermal-protection-system-list Are you capable of supplying fully assembled test specimens? If YES, do you require government furnished plates on which to apply the TPS? If NO, are you prepared to supply detailed instructions on fabrication, including any considerations for required equipment, cutting, bonding, forming, attachment, surface preparation, mixing, curing/drying or any other fabrication steps? What is the required lead time for either assembled test specimens or sufficient materials for third-party fabrication? Your willingness to sell TPS for this third-party testing effort. Availability and willingness to share any existing pool and/or torch fire testing data on the subject TPS, and any sensitivities or proprietary data protections that would be needed prior to sharing such information. Estimated prices of either assembled test specimens or sufficient materials for third party fabrication. Any other comments that can help the U.S. DOT Volpe Center better define the research scope and direction and ultimately yield technical data beneficial to both the government and industry are welcome. Responses should include the above as well as: Company information Name UEI Address POC information This RFI is for information and planning purposes only and is a market research tool to determine the availability and adequacy of sources prior to determining the method of acquisition and possible issuance of a Request for Quotation (RFQ). This RFI does not constitute a solicitation for bids, quotations, and proposals, and is not to be construed as a commitment by the Government. The information provided herein is subject to change and in no way binds the Government to solicit for or award a competitive contract. All information submitted in response to this announcement is voluntary, and the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government. | - | Market Research | 11/20/2026 |
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details. | - | Combined Synopsis | 11/23/2026 |
Please see attached RFI document. 10/29/2026: Amendment 1 is posted to amend the response date. | - | Market Research | 11/13/2026 |
This is a non-personal services contract to provide Base Operation and Support Services for the U.S. Army Garrison Ansbach at Katterbach- Katterbach Kaserne , Illesheim-Storck Barracks and the Bridge in Oberdachstetten Frankenkaserne and Wicklesgreuth. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non- personal services necessary as defined in the Performance Work Statement (PWS).UPDATE: Extension of offer due date issues NOV 13 26 12:30 A.***************** Site Visit******************************The purpose of this update is to inform you that the Government has scheduled a Site Visit at USAG Ansbach for above Solicitation on Thursday, 5 November 2026 at 11:30 a.m. Central European Standard Time. Please meet us at Katterbach Housing Gate the entrance from Untereichenbach at 11:00 a.m., to give us enough time to sign you in. 1. The purpose of this modification is to update the CLIN structure and extend the solicitation close date to 16 November 2026 1400hrs CET.2. All other terms and conditions remain the same. | - | Solicitation | 11/16/2026 |
FY26 Sidetrack Roadbed Maintenance at the U.S. Government Sidetrack NO. 342 and 343 TSURUMI POL Areas (OU-1 and OU-2), in the U.S. Commander Fleet Activities Yokosuka (CFAY), JAPAN | - | Special Notice | 05/22/2026 |
Additional Details
Solicitation Number
6913G626Q300009
Archive Date
Aug 11, 2026
Office Address
CAMBRIDGE, MA, 02142