GovChime
Notice ID: 7fd35784d27849809c22506a146c2d75Award NoticeAwardedArchived

Locomotive 92-Day Periodic Safety Inspections

Awarded on July 27, 2026. Full description on SAM.gov.

Awarded tounder 6913G626P800036 (source: SAM.gov award notice)• $511.9K

Overview

Posted
July 27, 2026
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
488210: Support Activities for Rail Transportation
Agency
Department of TransportationOFFICE OF THE SECRETARY

Notice details

Office
6913G6 VOLPE NATL TRANS SYS CNTR
Place of performance
Cambridge, Massachusetts
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Jul 27, 2026
Award amount (SAM.gov award notice)
$511.9K

Identifiers

Solicitation number
6913G626Q300009
Notice ID
7fd35784d27849809c22506a146c2d75
Award number (PIID)
6913G626P800036

Description

The U.S. Department of Transportation (DOT), Volpe National Transportation Systems Center, has formally awarded a single-award hybrid contract (firm-fixed-price and NTE reimburseable travel and ODC CLINs) 6913G626P800036 under Solicitation Number 6913G626Q300009. This action was conducted competitively as a total small business set-aside using simplified procedures for certain commercial services in accordance with FAR RFO Part 12 and FAR Subpart 13.5.

Full description on SAM.gov

Award Overview

Award Number

6913G626P800036

Award Amount (SAM.gov award notice)

$511.9K

Award Date

Jul 27, 2026

Awardee

Awardee UEI

PXMEV64U3CK3

Awardee CAGE Code

9E0T6

Awardee Address

Mount Vernon, IL 62864, UNITED STATES

Original Solicitation

Notice ID: 7fd35784d27849809c22506a146c2d75

Posted Date: Jul 27, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

1
  • 6913G626P800049
    C. R. ELGIN INVESTMENT LLC
    Department of TransportationNAICS 488210
    $102.3KSigned Sep 1, 2026

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (14)

  • Attachment 2 - REVISED Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections (02.03..pdf

    771 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • REVISED SF 1449 - 6913G626Q300009 (02.03.2026).pdf

    164 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • REVISED Pricing Sheet (02.03.2026).pdf

    103 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • 6913G626Q300009 0003.pdf

    91 KBAdded in Combined Synopsis/Solicitation version 10Posted
    Download
  • Attachment 2 - REVISED Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections.pdf

    673 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Questions Received with Answers - 6913G626Q300009 01.29.2026.pdf

    258 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • REVISED SF 1449 - 6913G626Q300009.pdf

    117 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • REVISED Pricing Sheet.pdf

    59 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • 6913G626Q300009 0002.pdf

    91 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Attachment A - Locomotive 92 Day Inspection Dates 01.29.2026.xlsx

    11 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • 6913G626Q300009 0001.pdf

    101 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • SF 1449 - 6913G626Q300009.pdf

    103 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Attachment 1 - RFQ 6913G626Q300009.pdf

    217 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Attachment 2 - Statement of Work for Army Locomotive Safety Inspections - ASC 92-Day Inspections.pdf

    241 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 2
    Version 2Combined Synopsis/SolicitationArchived

    Locomotive 92-Day Periodic Safety Inspections

    Notice b5ce83817e6e4c0f8117fe91bec6a648 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Locomotive 92-Day Periodic Safety Inspections

    Notice 7fd35784d27849809c22506a146c2d75 on SAM.gov

Other notices for this solicitation

  1. Combined SynopsisRelated noticeJan 9, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice 942dd408eaa44d43a6b03bcbe36f2cd1 on SAM.gov

  2. Combined SynopsisRelated noticeJan 9, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice 4620095d08de4829a6c618b0e2a5c9e5 on SAM.gov

  3. Combined SynopsisRelated noticeJan 9, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice 58ba6a82bbe94b0cab23d8c057efee60 on SAM.gov

  4. Combined SynopsisRelated noticeJan 9, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice d36d4a38e3294a4896ab257bc33cecb5 on SAM.gov

  5. Combined SynopsisRelated noticeJan 9, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice da75a398323d465cbfd5394f570beb46 on SAM.gov

  6. Combined SynopsisRelated noticeJan 15, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice e8866c95ad474557b701616280b0405e on SAM.gov

  7. Combined SynopsisRelated noticeJan 29, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice 61ad0965bb334f5393ceecf228344f18 on SAM.gov

  8. Combined SynopsisRelated noticeJan 29, 2026

    Locomotive 92-Day Periodic Safety Inspections

    Notice 15e73dc9145c4b1b88aca2287bc9e017 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a Request for Information (RFI) only. Purpose This RFI seeks information regarding providing Thermal Protection Systems (TPS) for railroad tank cars to the U.S. DOT Volpe Center. A qualified vendor must demonstrate they are able to provide either complete test specimens as detailed further below or sufficient materials to fabricate completed test specimens without the need for specialized facilities or techniques. Qualified vendors are requested to respond as detailed further below, which includes capability, small business classification, estimated lead time including any risks that may impact delivery, and any other industry concerns the government might consider before solicitation. The intent is to gather information to inform a possible future procurement or contract. Background The Federal Railroad Administration (FRA) is conducting research into the performance of TPS for railroad tank cars. TPS are designed to delay or prevent the catastrophic release of hazardous materials from a railroad tank car exposed to fires that may result from train derailments. In the FRA’s planned research, test specimens of TPS are to be evaluated in simulated pool fire and torch fire conditions similar to those defined in Appendix B to 49 CFR 179. The durations of the fire exposure would extend beyond the 100 minute pool fire and 30 minute torch fire duration specified in Appendix B to 49 CFR 179. Pool fire test specimens are applied to a 1 foot by 1 foot steel plate of nominal 0.625 inch thickness. Torch fire test specimens are applied to a 4 foot by 4 foot steel plate of nominal 0.625 inch thickness. The Volpe Center is looking to procure a minimum of two (2) pool fire test specimens and two (2) torch fire test specimens for each TPS. Multiple TPS of different construction from the same vendor may be considered. The Pipeline and Hazardous Materials Safety Administration (PHMSA) maintains a list of tank car TPS that have been tested and shown to comply with the requirements of Appendix B to 49 CFR Part 179. Inclusion on this list is not a requirement for a TPS to be used on a tank car. There is a preference of TPS that are currently on the PHMSA list and/or being used on tank cars, but other systems may be considered. Scope of Information Requested The U.S. DOT Volpe Center is seeking information from tank car thermal protection system manufacturers and/or vendors, on their willingness, ability, and requirements to provide the physical specimens as well as material and installation information needed to conduct the above fire testing research. Description of how the TPS is assembled. Example : 1 inch insulation – Brand XXX 1 inch fiberglass – generic 11 gauge steel jacket – generic 10 mils coating – Brand YYY, Component A and Component B in 1:1 volume ratio Include any relevant brand names or item numbers specific to this system. Also include any required surface preparation or other processing steps. Is the TPS currently used on railroad tank cars? If so, is it on the PHMSA approved list here: https://www.phmsa.dot.gov/standards-rulemaking/hazmat/tank-car-thermal-protection-system-list Are you capable of supplying fully assembled test specimens? If YES, do you require government furnished plates on which to apply the TPS? If NO, are you prepared to supply detailed instructions on fabrication, including any considerations for required equipment, cutting, bonding, forming, attachment, surface preparation, mixing, curing/drying or any other fabrication steps? What is the required lead time for either assembled test specimens or sufficient materials for third-party fabrication? Your willingness to sell TPS for this third-party testing effort. Availability and willingness to share any existing pool and/or torch fire testing data on the subject TPS, and any sensitivities or proprietary data protections that would be needed prior to sharing such information. Estimated prices of either assembled test specimens or sufficient materials for third party fabrication. Any other comments that can help the U.S. DOT Volpe Center better define the research scope and direction and ultimately yield technical data beneficial to both the government and industry are welcome. Responses should include the above as well as: Company information Name UEI Address POC information This RFI is for information and planning purposes only and is a market research tool to determine the availability and adequacy of sources prior to determining the method of acquisition and possible issuance of a Request for Quotation (RFQ). This RFI does not constitute a solicitation for bids, quotations, and proposals, and is not to be construed as a commitment by the Government. The information provided herein is subject to change and in no way binds the Government to solicit for or award a competitive contract. All information submitted in response to this announcement is voluntary, and the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government.
-Market Research11/20/2026
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.
-Combined Synopsis11/23/2026
Please see attached RFI document. 10/29/2026: Amendment 1 is posted to amend the response date.
-Market Research11/13/2026
This is a non-personal services contract to provide Base Operation and Support Services for the U.S. Army Garrison Ansbach at Katterbach- Katterbach Kaserne , Illesheim-Storck Barracks and the Bridge in Oberdachstetten Frankenkaserne and Wicklesgreuth. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non- personal services necessary as defined in the Performance Work Statement (PWS).UPDATE: Extension of offer due date issues NOV 13 26 12:30 A.***************** Site Visit******************************The purpose of this update is to inform you that the Government has scheduled a Site Visit at USAG Ansbach for above Solicitation on Thursday, 5 November 2026 at 11:30 a.m. Central European Standard Time. Please meet us at Katterbach Housing Gate the entrance from Untereichenbach at 11:00 a.m., to give us enough time to sign you in. 1. The purpose of this modification is to update the CLIN structure and extend the solicitation close date to 16 November 2026 1400hrs CET.2. All other terms and conditions remain the same.
-Solicitation11/16/2026
FY26 Sidetrack Roadbed Maintenance at the U.S. Government Sidetrack NO. 342 and 343 TSURUMI POL Areas (OU-1 and OU-2), in the U.S. Commander Fleet Activities Yokosuka (CFAY), JAPAN
-Special Notice05/22/2026

Additional Details

Solicitation Number

6913G626Q300009

Archive Date

Aug 11, 2026

Office Address

CAMBRIDGE, MA, 02142