GovChime
Notice ID: eed5595d885240c2b6ba126a46448b9dSolicitation

Correct Electrical Deficiencies

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
10:00 AM EST
Posted
November 5, 2026
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
246-NETWORK CONTRACTING OFFICE 6 (36C246)
Place of performance
Fayetteville, North Carolina, 28301
Last updated
Nov 5, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24627B0001
Notice ID
eed5595d885240c2b6ba126a46448b9d

Description

SOW 
565-22-500 Correct Electrical Deficiencies 
Fayetteville VAMC

Intent
The project consists of correcting electrical deficiencies as noted from previous VA facility assessments. Improvements include; New electrical entrance building, medium voltage loop replacement, replace electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup throughout the Fayetteville VAMC, and minor HVAC and Plumbing improvements.  Period of performance 1,174 calendar days.
Medium Voltage
VA owned medium voltage loop and entrance equipment will be modified or replaced with the following scope:
Replace existing medium voltage entrance equipment with new at campus entrance. 
Provide new building:
Slab on grade, brick on CMU wall, Slate roof tile (to match existing facility)
Provide new VA owned medium voltage cables in concrete encased duct bank for medium voltage loop. Approximately 300 .
Demo and remove old VA owned medium voltage entrance metal shack.
Replace medium voltage sectionalized switch. 
Provide new metal-clad switchgear with draw-out vacuum circuit breakers.
Replace medium voltage oil filled transformer (1)
Panel Replacement and Branch Circuit Improvements
Correct deficiencies to electrical panels and branch circuit wiring which are not correctly sized, protected, or are at end of useful life, as identified through various inspections over the years. o 

All work will be phased. All replacements to existing equipment will require the contractor to filled-out a phasing plan for VA approval. All replacements to existing equipment will require a temporary power solution to minimize electrical outage to existing areas. Such deficiencies include:
Replace-in-same-room building entrance and large distribution equipment:
Normal (service entrance) Switchboards: approx. 2 
Generator switchboards: approx. 2 
Automatic transfer switch: approx. 7
Replace-in-place distribution panels and panelboards distribution equipment
Distribution Panels: approx. 5
Panelboards: approx. 68
Replace undersized feeders
Redundant Gound
Provide redundant equipment grounding conductor to a portion of the facility.
Approx. 100,000 square feet of existing electrical branch circuit distribution in occupied space. 
HVAC And Plumbing
Reroute (vertically & horizontally) Sewer piping and hot water piping to avoid electrical room.
Provide exhaust fan to new Medium Voltage building. 
Incidental Electrical Equipment Cleanup
Provide Identification tag to new and existing equipment throughout the facility: approx. 100 tags
Clean debris from existing electrical enclosures throughout the facility: approx. 30 enclosures.
Correct panel grounding, terminate cable directly to existing panel s ground bar: approx. 30 panels.

ALTERNATE NO.1: BASE BID except delete Bldg 1, Floor 1 and Floor 3 of deficiency item 134 which directs the contractor to provide ground conductors in existing conduit. Which is noted on Sheet B01-E200.
 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Angelo Harris
Contracting Officer

Documents

Files (5)

  • 565-22-500 Combined Set 20251118.pdf

    42 MBAdded in Solicitation version 3Posted
    Download
  • 36C24627B0001.docx

    271 KBAdded in Solicitation version 2Posted
    Download
  • Correct Electrical Deficiencies Specifications.pdf

    3.2 MBAdded in Solicitation version 2Posted
    Download
  • ATTACHMENT - BAA TAA COMPLIANCE CERTIFICATION.docx

    21 KBAdded in Solicitation version 2Posted
    Download
  • 36C24627B0001_1.docx

    16 KBAdded in Presolicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Presolicitation

    6150--Correct Electrical Deficiencies

    Notice 2b09d3389e514695959b6e38457fd6b6 on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    Correct Electrical Deficiencies

    Notice 33cea54e56594fd4a20fb45b1905b49a on SAM.gov

  3. 3
    Version 3SolicitationCurrent

    Correct Electrical Deficiencies

    Notice eed5595d885240c2b6ba126a46448b9d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The intent of the project consists of correcting electrical deficiencies as noted from previous VA facility assessments. Improvements include; New electrical entrance building, medium voltage loop replacement, replace electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup throughout campus, and minor HVAC and Plumbing improvements. Estimated construction magnitude is between $10,000,000.00 and $20,000,000.00 NAICS CODE: 236220 Size Standard: $45.0 Million Period of performance: 1,174 (one thousand, one hundred seventy-four) Days All non-responsive bids shall be rejected and ineligible for award. Network Contracting Office 6 (NCO 6) intends to issue an Invitation for Bid (IFB) and award a single, firm fixed-price contract. Solicitation material will be available on or around October 15, 2026. Any specifications, drawings and amendments will be posted on the System for Award Management (SAM) Contract Opportunities website (https://sam.gov/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. Bids will be due approximately 30 days after issuance of the solicitation. Only one site visit will be scheduled. Location and point(s) of contact for the site visit will be identified in the solicitation. This notice is for informational purposes only and is not an invitation for bids. The Government is not obligated to issue a solicitation as a result of this notice. No other information is available until issuance of the solicitation. No bidders list is maintained. All interested vendors should register on SAM.gov. Interested bidders are advised they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers and should revisit the website periodically for any amendments/notices to the solicitation. Prospective contractors must be registered in the SAM database in order to obtain access in Contract Opportunities. SAM must be current and active to be eligible for contract award. Contractors please note: Online Representations and Certifications Applications (ORCA) apply to this solicitation. With ORCA; you now have the availability to enter and maintain your reps and certs with your proposal. Any questions regarding this announcement and all future announcements regarding this project must be emailed to the Primary Contract Specialist, Angelo Harris, at angelo.harris@va.gov. NO TELEPHONE REQUESTS FOR BIDDING MATERIAL WILL BE ACCEPTED.
-Pre-Solicitation10/15/2026
Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate. Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.
-Solicitation12/02/2026
-Solicitation10/29/2026
-Pre-Solicitation09/24/2026
Amendment 0007 has been posted. This amendment responds to RFIs, updates Attachment 9, provides Addendum 1, and extends the date for receipt of offers. The update to Attachment 9 corrects the incorrect solicitation number and location in the header. The new date and time for receipt of offers is 8/17 at 3PM EDT. Specifications and drawings found in Addendum 1 dated 8-6-26 replace the corresponding specification section or drawing in the original package. Amendment 0006 has been posted. This amendment extends the date for offers due to 8/14 at 3PM EDT. Amendment 0005 has been posted. This amendment extends the date for offers due to 8/7 at 3PM EDT. It also adds FAR clause 52.212-4 and removes FAR clauses 52.249-2 and FAR 52.249-10. Amendment 0004 has been posted. This amendment extends the date for offers due to 7/27 at 3PM EDT. Amendment 0003 has been posted. This amendment extends the date for offers due to 7/13 at 3PM EDT. Amendment 0002 has been posted. This amendment extends the date for offers due to 7/1 at 3PM EDT. Amendment 0001 has been posted along with its attachments. This amendment adds the site visit sign-in sheet and agenda from the site visit on 6/9. The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per requirements of all governing agencies. Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site. Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents.
-Solicitation08/17/2026

Additional Details

Solicitation Number

36C24627B0001

Archive Date

Dec 23, 2026

Office Address

HAMPTON, VA, 23667