GovChime
Notice ID: 7b0569670fa144d49dbb59793fd9fe95Sources Sought

66--Notice of Intent to Sole Source / Sources Sought to Consarc-ThermocoupleAssembly

Archived on September 19, 2018. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
August 20, 2018
Notice type
Sources Sought
NAICS
333994: Industrial Process Furnace and Oven Manufacturing

Notice details

PSC
66: INSTRUMENTS AND LABORATORY EQPT
Last updated
Dec 6, 2025

Identifiers

Solicitation number
89243318NFE000014
Notice ID
7b0569670fa144d49dbb59793fd9fe95

Description

In accordance with Federal Acquisition Regulation (FAR) Part 13, Simplified Acquisition Procedures, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) intends to award a purchase order on a sole source basis to Consarc Corporation to purchase an automatic thermocouple assembly. This is considered a sole source to Consarc because, to the best of the NETL’s knowledge, based on market research conducted Consarc is the sole domestic manufacturer and sole source provider of this thermocouple assembly, and therefore, the only known source that can provide this exact item. This automatic thermocouple assembly is specifically designed for the vacuum induction melt furnace already in use at NETL. To maintain optimal performance, safety, and functionality of the furnace this thermocouple assembly, which has certain proprietary design features, must be compatible with the existing vacuum induction melt furnace. No known potential alternate sources exist which could satisfy NETL's requirement. This notice of intent is not a request for quote/proposal. Any interested party that believes it is capable of meeting the NETL requirement described herein may identify themselves and must provide evidence of their capability to fulfill the requirement being requested by 4:00 PM ET on September 4, 2018. Responses must be submitted in writing to the purchasing agent, Lora Stumpf, via email at stumpf@netl.doe.gov no later than the time and date noted above. Telephone responses and requests will not be received. A determination by the Government not to compete this requirement based on responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:89243318NFE000014
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentAug 20, 2018

    66--Notice of Intent to Sole Source / Sources Sought to Consarc-ThermocoupleAssembly

    Notice 7b0569670fa144d49dbb59793fd9fe95 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
-Market Research11/16/2026
Naval Sea Systems Command (NAVSEA), Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia, is seeking to purchase two (2) Portable LN2 Heaters, Portable Liquid Nitrogen Circulation Heaters. Please see attachments 1 (one), 2 (two), and 3 (three). Attachment 3 must be checked yes or no in each column and then it must be signed and dated. Failure to complete this form in its entirety will negate your submission from consideration. Attachments 1 and 2 clearly state the specifications, descriptions, and expectations for the portable heaters. This Request for Quote (RFQ) #N4215827QE008 is attached. The extended description of CLIN 0001 and the attachments describe the specifications. This is a 100% Small Business Set Aside procurement. The Request for Quote must be filled in and signed. All proposals must be submitted no later than November 30, 2026 at 11:00am eastern standard time. All offers must be comprehensive in price to include price and other requested costs. Additional monies cannot be added after the award. Please submit the bid and all related items to Eliot Faircloth at: john.e.faircloth2.civ@us.navy.mil
-Solicitation11/30/2026
PLEASE NOTE: AN ADDENDUM HAS BEEN INCORPORATED INTO THIS SOLICITATION. PLEASE PROVIDE ONE SIGNED COPY OF ALL RELATED ADDENDUMS WITH ANY FINAL PROPOSAL. CHANGES IN BOLD BELOW. More documentation to follow. Argonne National Laboratory (ANL) seeks a Supplier to design, fabricate, deliver, support installation, and commission a custom industrial furnace for R&D testing of fuel-flexible burners using natural gas and hydrogen blends from 0–100% H₂. The furnace shall support direct-fired and indirect-fired burner configurations and meet all requirements in the attached Statement of Work, including performance, facility interfaces, applicable codes, and safety requirements. Award will be made on a BEST VALUE basis. Technical acceptability will be evaluated on AN ADJECTIVAL SCALE. BUSINESS PROPOSALS WILL BE EVALUATED ON PASS/FAIL. Among responsible offerors determined technically acceptable and compliant with solicitation requirements, ANL will award to the offeror with the best overall value, where the Technical Proposal is of greater importance to the Price Proposal and Business Management Proposal. Offerors shall submit: Completed and signed ANL-70 Request for Quotation. Technical compliance response addressing each Statement of Work requirement, with supporting evidence. Country of Origin information for the furnace and major components. Lead time from PO through final delivery, FOB Destination, Lemont, IL 60439, including major design, fabrication, delivery, and commissioning milestones. Completed and signed ANL-70B Representations and Certifications. Any proposed exceptions or deviations. All proposal documentation requested under Best Value Criteria (to be added) Offers that do not meet mandatory requirements or do not provide adequate supporting documentation may be found technically unacceptable. Country of Origin shall be provided in accordance with FAR 52.225-1, Buy American—Supplies. Please direct questions to the Contracting Officer. Thank you in advance for your participation.
-Solicitation12/01/2026
The Rock Island Arsenal has a requirement for the following item. The Government intends to make a firm fixed price (FFP) award to the lowest priced, responsive, responsible vendor whose quote, conforms to the RFQ requirements and represents the lowest total evaluated price. Discussions are not anticipated. Payment will be completed via Wide Area Work Flow (WAWF) Quote must include shipping to Rock Island Arsenal, IL 61299 Site Visit is set for November 10th, 2026 at 10 AM Central Standard Time Quotes are due by 6 PM, November 27, 2026 Certificate of Conformance in required
-Combined Synopsis11/27/2026
Vertical Medium-Wave Infrared Oven Systemupdate 0001 is to add drawings
-Combined Synopsis11/17/2026

Additional Details

Solicitation Number

89243318NFE000014

Archive Date

Sep 19, 2018