GovChime
Notice ID: d91f892851cc46aba4906713669e7408Award NoticeAwardedArchived

66--IRA Hassler Core Holder and Pressure Vessels

Awarded on September 15, 2026. Full description on SAM.gov.

Awarded tounder 89243326PFE001018 (source: SAM.gov award notice)• $228.0K

Overview

Posted
September 15, 2026
Notice type
Award Notice
NAICS
333132: Oil and Gas Field Machinery and Equipment Manufacturing
Agency
Department of Energy

Notice details

Office
NATIONAL ENERGY TECHNOLOGY LABORATORY
PSC
6640: LABORATORY EQUIPMENT AND SUPPLIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 15, 2026
Award amount (SAM.gov award notice)
$228.0K

Identifiers

Solicitation number
89243326QFE000561
Notice ID
d91f892851cc46aba4906713669e7408
Award number (PIID)
89243326PFE001018

Description

IRA Hassler Core Holder and Pressure Vessels

Full description on SAM.gov

Award Overview

Award Number

89243326PFE001018

Award Amount (SAM.gov award notice)

$228.0K

Award Date

Sep 15, 2026

Awardee

Awardee UEI

NBPBV9KVUY33

Awardee CAGE Code

7MEV8

Awardee Address

982 N 675 W, North Salt Lake, UT 84054, UNITED STATES

Original Solicitation

Notice ID: d91f892851cc46aba4906713669e7408

Posted Date: Sep 15, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    66--IRA Hassler Core Holder and Pressure Vessels

    Notice d91f892851cc46aba4906713669e7408 on SAM.gov

Other notices for this solicitation

  1. SolicitationRelated noticeAug 21, 2026

    IRA Funds combined synopsis/solicitation for a com

    Notice 80fdbadadc8c4f24adff6df8a919c257 on SAM.gov

  2. SolicitationRelated noticeAug 27, 2026

    66--IRA Funds combined synopsis/solicitation for a com

    Notice 37a68103837b4b9cb4c95f2aaa9b5170 on SAM.gov

  3. SolicitationRelated noticeSep 1, 2026

    66--IRA Funds combined synopsis/solicitation for a com

    Notice 36f206da5647460f9c04e08f34aa0547 on SAM.gov

Similar Opportunities

Title
Phase
Deadline
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
Market Research11/16/2026
Brand Name or Equal Teledyne Instruments Liquid Syringe Pump - Model 260x Pump Module (P/N: 681240830) - 2 Qty. per attached specifications along with the following items: 1. Continuous flow dual electric valve package (1/8 inch valves) for Syrixus 1000x, 500x and 260x (P/N: 601267015) - 1 Qty. 2. Electric Valve Controller for SyriXus pumps (P/N: 681240854) - 1 Qty. Amendment 0001: The purpose of this amendment is to provide question and answer as attached as of 11/10/2026. All other terms and conditions remain unchanged.
Solicitation11/20/2026
Brand Name or Equal Across International 2R50f Dual-Jacketed Glass Filter Reactor - 110V (2R50f.110) per the attached specifications - 1 Qty.
Solicitation11/25/2026
Brand Name or Equal NETZSCH Dilatometer DIL 502 Expedis Supreme with single measuring system (1 Qty.)
Solicitation11/19/2026
Ventrac Tractor for Racine Locks and Dam General Requirement: Supply a matched 2026 or newer tractor, dual wheel kit, and canopy. Once delivered, all components shall form a matched set, all necessary parts shall be supplied to immediately start using the equipment, and the components shall meet the following specs: Tractor Requirements: Provide an all-wheel drive tractor with an articulated chassis, 6-gallon fuel tank, and front hitch for accepting attachments. The tractor shall have an enclosed muffler, a horn, pre-wired plug/play wiring harness, premium comfort seat, an electronic instrument panel, 6-function warning gauge and alarm, on-board diagnostic system, sealed electrical system, thermostatically controlled oil cooler, battery disconnect switch with circuit breaker, automotive style parking brake, universal PTO switch, SDLA operator controls, and a weight transfer system. Additionally, the tractor shall have all-terrain tires, a rear Category 1 3-point hitch, four rear weights, front fenders, foot pegs, a canopy, a digital slope indicator, and a dual wheel kit for use on steeper slopes. Engine Requirements: The engine shall have a displacement of 898 cubic centimeters and be rated at a minimum of 25 horsepower with 42 ft/lbs of torque. The engine shall run on diesel fuel and be liquid cooled. The engine shall have a minimum slope ratine of 20 degrees for continuous operation and 30 degrees for intermittent operation. Warranty: The Contractor shall provide full coverage no deductible warranty for a minimum of two years with unlimited hours. All components of the tractor shall be covered by the warranty. There shall be an equipment manufacturers service facility no further than 100 miles from the project office, and all manufacturers service facilities shall honor the warranty. There shall be no cost for parts or labor during the warranty period. The Government will deliver the machine to the facility for repair and will pick it up once repairs are completed.
Solicitation08/18/2026

Additional Details

Solicitation Number

89243326QFE000561

Archive Date

Sep 30, 2026

Office Address

MORGANTOWN, WV, 26507