GovChime
Notice ID: d85e3f4c9d5d4ac992089365c6a61608Combined Synopsis/SolicitationCancelled on SAM.gov

U.S. Coast Guard Pease Building Mini-Split HVAC System Install

Cancelled on SAM.gov (notice posted July 20, 2026). Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM PDT
Posted
July 20, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
BASE SEATTLE(00033)
Place of performance
Port Angeles, Washington, 98362
PSC
N041: INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z03326Q201900005
Notice ID
d85e3f4c9d5d4ac992089365c6a61608

Description

UPDATE 01 - ISSUED 29 JUNE 2026

The purpose of this update is to update the date offers due to 06 July 2026 at 3:00 PM PDT.

All other terms and conditions remain unchanged.

DESCRIPTION OF REQUIREMENT: 

UPDATE 1: Product Service Code has been updated to reflect work requirements to N041: Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment.

The U.S. Coast Guard requires services for the contractor to provide all labor, equipment, material, transportation, supervision, services and items necessary to procure and install one (1) new heat pump and four (4) associated indoor mini-split units to provide independent and adequate temperature control for four crew duty rooms in the Pease Building at USCG Air Station Port Angeles, WA. The Government intends to issue a firm-fixed-price purchase order for this project. The full scope of work and specifications are included in the solicitation documents.

PROJECT ADDRESS:

U.S. Coast Guard

Air Station Port Angeles

1 Ediz Hook Rd

Port Angeles, WA. 98362

United States

CLASSIFICATION:

This acquisition is set-aside 100% for SMALL BUSINESS.

The associated NAICS code is 238220 – Plumbing, Heating, and Air-Conditioning Contractors

Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR 12.302 to be consistent with a request for quotations. This tailoring includes but is not limited to the following: In accordance with FAR 13.004, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR 13.004. Where the word "offer/offeror" or a derivative of that word appears, it is changed to "quote/quoter" or a derivative of that word.

SITE VISIT:

Each offeror is highly encouraged to visit the site to provide the government with an accurate and competitive offer but is not required to submit a quote. A site visit will be arranged for interested offerors. All interested offerors must arrive no later than five minutes prior to their RSVP'd start time. 

Site Visit Dates: June 18th, 2026.

Site Visit Time(s): 8:00 AM -1:00 PM PDT.

Location:

U.S. Coast Guard

Air Station Port Angeles

1 Ediz Hook Rd.

Port Angeles, WA 98362

United States

Please E-mail Alec MacLeod at Alexander.J.MacLeod@uscg.mil to schedule a site visit no later than 06/15/2026.

QUESTIONS:

Any and all questions regarding this solicitation shall be submitted in writing to the Contract Specialist at Patrick.R.Gittings@uscg.mil with solicitation RFQ number 70Z03326Q2010900005 in subject line.  Questions regarding the statement of work (SOW) will be forwarded to the technical expert for an accurate response.  All responses will be uploaded for an equal and fair solicitation to all interested vendors solely on SAM.gov.  No more questions will be answered after 3:00 PM PDT on 06/25/2026.

SUBMISSION OF QUOTES:

Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.

Quotes must be submitted electronically to Patrick.R.Gittings@uscg.mil by the date and time specified in this solicitation. Incomplete submissions may be considered unresponsive and ineligible for award.

A complete submission shall consist of the following three parts:

Part 1: SF 1449

  1. Complete and sign the provided Standard Form (SF) 1449.
  2. Insert the total firm-fixed-price bid in the appropriate blocks on the SF 1449.

Part 2: Price Quotation

  1. A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
  • Materials & Equipment
  • Electrical System Capacity Review, Inspection, and Report
  • Initial Performance Testing
  • Component Adjustment and Balancing
  • Thermostat and Control Verification
  • Final Performance Verification and Report
  • Site Cleanup
  • Labor Hours & Wages

Part 3: Technical Proposal

The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:

  1. Technical Approach: A step-by-step description of how the quoter will perform the work, including mobilization, inspection, and installation and testing of required equipment.
  2. List of Major Materials and Equipment: A list of the key materials and equipment proposed for the project. This list is for technical evaluation purposes to ensure compliance with the SOW and must include, at a minimum:
  • Technician and Firm Certification
  • Test Instruments List and Calibration Certificates
  1. Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including performance verification and report submission, will be completed within the required Period of Performance, with a completion date of July 31, 2026. Milestones should be shown in terms of days from the NTA (e.g., "Inspection of Electrical System Complete: Day 3," "Equipment Installation Begin: Day 6," "Final Acceptance Testing: Day 30").

Submit quotes to the following e-mail address by the offer due date and time zone:

Attn: Patrick Gittings, E-Mail Address: Patrick.R.Gittings@uscg.mil with solicitation RFQ number 70Z03326Q2010900005 in subject line.

It is the government’s intent to award to the low cost, responsible, and responsive offeror who provides the most advantageous, reasonable, and negotiable offer to the government.  Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award.  Failure for contractor to be registered in SAM shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (8)

  • Questions_Answers for 70Z03326Q2019000005 UPDATED 02 July 2026.pdf

    145 KBAdded in Combined Synopsis/Solicitation version 5Posted
    Download
  • Questions_Answers for 70Z03326Q2019000005 UPDATED 26JUN26.pdf

    137 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • SOW - INSTALL COMPLETE HVAC SYSTEM FOR CREW DUTY ROOMS AT CG AIRSTA PORT ANGELES.pdf

    203 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SF1449_70Z03326Q2019000005.pdf

    795 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SCWD 2015-5545 CLALLAM CO. WA.pdf

    4.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • HSAR 3052.204-71 Contractor Employee Access.pdf

    110 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • FAR Clauses Fixed Price Services-A.pdf

    81 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • FAR Clauses Fixed Price Services-R.pdf

    19 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice 8f9d42b5fd874c169bc6b944ec2917cc on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice dd9b32c9fe7f43e7859afd699b7d276c on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice bdb4e0d2a9df4afe99ebac3130b37a2b on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice 24bd02fa9b744c65a00aeef494186036 on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice 3dabf60be4134287a2f1410765c693f6 on SAM.gov

  6. 6
    Version 6Combined Synopsis/SolicitationCancelledArchivedCurrent

    U.S. Coast Guard Pease Building Mini-Split HVAC System Install

    Notice d85e3f4c9d5d4ac992089365c6a61608 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

70Z03326Q201900005

Archive Date

Jul 21, 2026

Office Address

SEATTLE, WA, 98134