Z--Lowell National Historical Park - Security Upgrade
Awarded on September 10, 2026. Full description on SAM.gov.
Overview
- Posted
- September 10, 2026
- Notice type
- Award Notice
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- NER SERVICES MABO (43000)
- Place of performance
- Lowell, MA
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 10, 2026
- Award amount (SAM.gov award notice)
- $1.2M
Identifiers
- Solicitation number
- 140P4326R0009
- Notice ID
- 2817ffc8f0244ddd88cf03af942f6a9b
- Award number (PIID)
- 140P4326C0024
Description
Award Overview
Award Number
140P4326C0024
Award Amount (SAM.gov award notice)
$1.2M
Award Date
Sep 10, 2026
Awardee
Awardee UEI
N3P6JK32Z381
Awardee CAGE Code
3EGJ4
Awardee Address
95 POST OFFICE PARK, Wilbraham, MA 01095, UNITED STATES
Original Solicitation
Notice ID: 2817ffc8f0244ddd88cf03af942f6a9b
Posted Date: Sep 10, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (19)
- Download
Sol_140P4326R0009_Amd_0004.pdf
202 KBAdded in Solicitation version 9Posted - Download
Attachment_14_-_RFIs_34-45_0004.pdf
254 KBAdded in Solicitation version 9Posted - Download
Attachment_12_-_RFIs_18-30_0004.pdf
245 KBAdded in Solicitation version 9Posted - Download
Attachment_13_-_RFIs_31-33_0004.pdf
272 KBAdded in Solicitation version 9Posted - Download
Sol_140P4326R0009_Amd_0003.pdf
202 KBAdded in Solicitation version 7Posted - Download
Attachment_11_-_Site_Visit__2_Sign-In_Sheet_0003.pdf
356 KBAdded in Solicitation version 7Posted - Download
Attachment_10_-_RFIs_1-17_0003.pdf
240 KBAdded in Solicitation version 7Posted - Download
Sol_140P4326R0009_Amd_0002.pdf
202 KBAdded in Solicitation version 6Posted - Download
Sol_140P4326R0009_Amd_0001.pdf
202 KBAdded in Solicitation version 5Posted - Download
Attachment_9_-_Site_Visit_Sign-In_Sheet_0001.pdf
14 MBAdded in Solicitation version 5Posted - Download
Sol_140P4326R0009.pdf
671 KBAdded in Solicitation version 4Posted - Download
B08_Attachment_3_-__LOWE_314055_-_Drawings.pdf
16 MBAdded in Solicitation version 4Posted - Download
B08_Attachment_4_-_LOWE_335201_-_Drawings.pdf
3.1 MBAdded in Solicitation version 4Posted - Download
B08_Attachment_2_-_LOWE_335201_-_Project_Specifications.pdf
1.8 MBAdded in Solicitation version 4Posted - Download
B08_Attachment_1_-_LOWE_314055_-_Project_Specifications.pdf
4.4 MBAdded in Solicitation version 4Posted - Download
B08_Attachment_6_-_Construction_Contract_Administration_Provision.pdf
104 KBAdded in Solicitation version 4Posted - Download
B08_Attachment_7_-_Limitation_on_Subcontracting_Report.xlsx
160 KBAdded in Solicitation version 4Posted - Download
B08_Attachment_5_-_Davis_Bacon_Wage_Determination_MA20260001.pdf
931 KBAdded in Solicitation version 4Posted - Download
B08_Attachment_8_-_Past_Performance_Questionnaire.pdf
145 KBAdded in Solicitation version 4Posted
Lifecycle
- 2Version 2SolicitationArchived
Z--Lowell National Historical Park - Security Upgrade
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z--Lowell National Historical Park - Security Upgrade
Other notices for this solicitation
- Pre-SolicitationRelated noticeMar 26, 2026
Z--Lowell National Historical Park - Security Upgrades
- SolicitationRelated noticeApr 24, 2026
Lowell National Historical Park - Security Upgrade
- SolicitationRelated noticeMay 7, 2026
Z--Lowell National Historical Park - Security Upgrade
- SolicitationRelated noticeMay 11, 2026
Z--Lowell National Historical Park - Security Upgrade
- SolicitationRelated noticeMay 22, 2026
Z--Lowell National Historical Park - Security Upgrade
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This requirement is for two air compressor relocations for US Naval Research Laboratory (NRL). The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1905 along with attachments. Your quick response is appreciated to facilitate an award prior to current fiscal year end. A site visit is required before submitting any proposal or quote. The mandatory site visit is scheduled for Wednesday, October 7, at 9:30 am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified in Block 8 of the Standard Form (SF) 1449 will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end. Amendment N0017326Q19050001 provides photos of the air compressors data plate information. Amendment N0017326Q19050002 includes an additional site visit and extends RFQ response date. Amendment N0017326Q19050003 removes the small business set aside, includes a site visit and extends RFQ response date. Amendment N0017326Q19050004 provides additional photos, drawings, Government responses to questions received, and extends RFQ response date. Amendment N0017326Q19050005 provides Government response to an additional question received. Amendment N0017326Q19050006 extends RFQ response date to 11/04/2026 @ 2:00pm EST. | 59% | Combined Synopsis | 11/04/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) • Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) • Life-cycle cost and sustainability integration (UFC 1-200-02) • Thermal partition separating switchgear room from power generation bay • Dedicated HVAC system and air conditioning ductwork • Sized space heating units • High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) • Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) • Sustainable design practices (UFC 1-200-02) • Dedicated single HVAC unit and duct system • Interior/exterior high-efficiency LED flood/task lighting • Raised roof profile with comprehensive crack sealing/insulation • Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system • Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables • Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 • Baseline routing derived from 2025 Engineering Study • Mandatory underground routing preference across base footprint • Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry • Air Force long-term smart-grid wireless connectivity architecture • Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines • Relay-to-control panel comm wiring for ESS B18 and ESS B168 • Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | 59% | Market Research | 11/30/2026 |
Provide single line plans. Provide electrical plan to show conduit route. Provide and install (1) Disconnect sized to serve existing lift station load. Provide and install an electrical pathway from the new disconnect to T1775 transformer. Pathway will be surface mounted to building 1730 and then trenched from the edge of the building to T1775.All work will be done in accordance with UFC, IFS, NEC, ICD, local, and state codes. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take on 5/21/2026 at 10AM PDT, meeting in front of building 1730s main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 5/18/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Questions are due by close of business 5/26/2026. Answers will be provided via a solicitation amendment. | 59% | Solicitation | 06/03/2026 |
See attached documents. Update 0002 revises question due by date. Update 0003 extends the due by date. | 56% | Combined Synopsis | 08/19/2026 |
Construct and install two maintenance pads to house all condensing units and provide single line as built drawings, install a two sided screen block at the front of the building matching the existing CMU block color and style, use solid and vented CMU blocks to ensure sufficient airflow around all condensing units, and build screen block walls two rows higher than the condensing units; the contractor shall supply a weatherproof 120V maintenance receptacle for each pad, core drill the existing wall of Building 119, install a 3 inch PVC pipe sealed with acoustical seal to maintain ICD 705 compliance per Tech Spec 1.5.1, install insulation on all line sets entering Building 119, run all electrical from Room 119s electrical mechanical room using panel EDH 1 3 rated at 480/277V and 800 amps, tie all new HVAC systems to the existing generator for backup power, surface mount electrical conduits in Room 119 and the exterior HVAC yard, run conduits underground to each maintenance pad, and supply a weatherproof disconnect for each condensing unit; the contractor shall install new cassette type HVAC systems in Rooms 112, 113, 114, and 132 using the existing suspended ceiling grid with added support, provide a 1 ton HVAC system with a separate controller for Room 112, provide 2 ton HVAC systems with separate controllers for Rooms 113 and 114, and provide a 4 ton HVAC system with a separate controller for Room 132; all design and construction shall comply with the current International Building Code, UFC standards, all applicable public laws, executive orders, CFR requirements, DOD instructions and directives, Nellis ID2 standards, and Clark County, Nevada, and federal codes and laws, and any discrepancies between codes or standards and contract documents shall be immediately reported to the Contracting Officer, with the more stringent requirement applying unless otherwise directed. 26 WPS request this HVAC installation and testing be accomplish within, 160 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/4/2026 at 0830 AM PDT, meeting in front of building 119 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/24/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/18/2026 at 2:00 PDT. Answers will be provided via a solicitation amendment. | 54% | Solicitation | 08/20/2026 |
Additional Details
Solicitation Number
140P4326R0009
Archive Date
Oct 1, 2026
Office Address
BOSTON, MA, 02108