GovChime
Notice ID: 91b9dc7581124a93988faaae41b00beaCombined Synopsis/SolicitationArchived

Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction

Archived on October 1, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM MDT
Posted
September 5, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 9
Place of performance
Dillon, 59725
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1240LU25Q0041
Notice ID
91b9dc7581124a93988faaae41b00bea

Description

Amendment 0001 09/05/2025: Add Questions and Answers document Add document: 5 Big hollow disaster fence location Add document: 6- Example Fence Segment Condition Pictures C.1 SCOPE OF CONTRACT The intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service. The work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction. Work covered under each Pay Item in the Schedule of Items includes: Pay Item No. 1 Mobilization: The work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Pay Item No. 1 Remove wire posts and stays: The work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands Pay Item No. 2 Replace wire posts and stays: The work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs. Pay Item No. 3 Remove and replace single brace: The work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item No. 4 Remove and replace double brace: The work shall consist of the removal and construction of double braces. See Specifications for installation specs. Pay Item No. 5 Installation of 14ft swing Gate: The work shall consist of the installation of a 14-foot swing gate. Pay Item No. 6 Removal and replacement of 12ft wire gate: The work shall consist of the Removal and replacement of 12ft wire gate. Pay Item No. 7 Removal and replacement of post and rail fence: The work shall consist of the installation of a 12-foot wire gate. C.2 PROJECT LOCATION Horse Prairie Cabin 420 Barrett St, Dillon MT 59725 C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $25,000 and $100,000. C.4 SITE VISIT Per FAR Part 52.236-3 Site Investigation and Conditions Affecting the Work , contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads. C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractors approved work schedule and run continuously till the end of the project no later than September 30th, 2026.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (8)

  • 5- Big hollow disaster fence location.pdf

    208 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Questions and Answers.pdf

    60 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Example Fence Segment Condition Pictures.pdf

    14 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • 0- NRE Construction RFQ 20250611.pdf

    1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 1- Plans signed.pdf

    1.9 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 2- Fence Schematic.pdf

    1.4 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 3- Experience_Questionaire.doc

    53 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 4- WD MT20250075 07182025.pdf

    34 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction

    Notice 9225d0660b194e11980e0f32144b7df1 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction

    Notice fac06a5181964ae8b273658234f932e4 on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction

    Notice 91b9dc7581124a93988faaae41b00bea on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240LU25Q0041

Archive Date

Oct 1, 2025