FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
Archived on September 1, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM PDT
- Posted
- August 20, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST SAN FRAN
- Last updated
- Nov 9, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912P725BA010
- Notice ID
- 2f6eaa964cf543bf9e48aca4cbc8d75b
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (5)
- Download
Bid Abstract- SF 1419 FY25 RWC (1).pdf
2.2 MBAdded in Solicitation version 10Posted - Download
Solicitation Amendment_W912P725BA010 0001.pdf
3.5 MBAdded in Solicitation version 6Posted - Download
W912P725BA010_REDWOOD_CITY_OM_Plans(FY25).pdf
4.6 MBAdded in Solicitation version 3Posted - Download
Redwood City Specifications 100 Percent 7.16.2025.pdf
11 MBAdded in Solicitation version 3Posted - Download
Solicitation_Redwood City FY25 Dredge 7.16.2025 FINAL.pdf
3.3 MBAdded in Solicitation version 3Posted
Links (8)
- PIEE Solicitation Module Link for W912P725BA010piee.eb.milPosted
- PIEE Solicitation Module Link for W912P725BLC01piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 4Version 4PresolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 3Version 3SolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 5Version 5SolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 6Version 6SolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 7Version 7SolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 8Version 8SolicitationArchived
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 10Version 10SolicitationArchivedCurrent
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
- 13Version 13Award NoticeArchived
Type changed from Solicitation to Award Notice
FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FY25 Lexington Harbor Maintenance Dredging. Mobilize to Lexington, Michigan and dredge the federal navigation channel as indicated in the contract drawings and specifications. Place dredged material as indicated in the contract drawings and specifications. Demobilize when dredging work is completed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. | 94% | Awarded | Open |
***Bid abstract has been posted.*** FY25 Lexington Harbor Maintenance Dredging. Mobilize to Lexington, Michigan and dredge the federal navigation channel as indicated in the contract drawings and specifications. Place dredged material as indicated in the contract drawings and specifications. Demobilize when dredging work is completed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. | 94% | Solicitation | 03/26/2026 |
92% | Awarded | Open | |
***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. | 92% | Solicitation | 03/20/2026 |
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. | 84% | Solicitation | 11/20/2026 |
Additional Details
Solicitation Number
W912P725BA010
Archive Date
Sep 1, 2025