GovChime
Notice ID: 9764ee4c2c14423783851d8c596e9159Combined Synopsis/SolicitationArchived

Asbestos Abatement – Building 801, VA Augusta Health Care System

Archived on October 9, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EDT
Posted
September 17, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
247-NETWORK CONTRACT OFFICE 7 (36C247)
Place of performance
Augusta, Georgia
PSC
Z1DA: MAINTENANCE OF HOSPITALS AND INFIRMARIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C24726Q0749
Notice ID
9764ee4c2c14423783851d8c596e9159

Description

Amendment 002 Project 509-26-120 Asbestos Abatement – Building 801 Rooms: 6B-102, 6B-103, 6B-104, 5B-102, and 5B-103

Purpose:

This amendment publishes the Government’s responses to vendor Requests for Information (RFIs). No other changes are made to the solicitation at this time.

RFIs AND RESPONSES:

The following RFIs were submitted by vendors. The Government’s responses are provided below.

  1. Will the project be done in Phases or will we have access to the entire area at once? The project may be carried out in incremental or informal phases. For example, abatement could be completed on the 5th floor and, at a separate time, on the 6th floor.
  2. What is the government estimate range for this project?  Magnitude of Construction Between $25,000 and $100,000
  3. Who will disconnect the sinks? The VA Engineering Shops
  4. Are we capping sink lines back in the wall? VA Engineering Shops will perform this task.
  5. Will we be required to replace ceiling tile and grid when we remove the exhaust hoods? VA will provide the replacement ceiling tiles 
  6. Are there windows to allow us to Exhaust outside during abatement? Yes, the COR will work with the contractor to coordinate with other departments to schedule any temporary closures for access to these windows.
  7. What type of flooring materials are you providing (LVT, CPT, Tile, ETC) LVT
  8. Are we assuming the substrate does not require any repair? yes
  9. Are all of the wall gypsum board mounted onto a steel stud wall? yes
  10. Is there fire detection equipment in the exhaust hoods that will need to be disarmed and removed prior to demolition.  If so, will the VA take care of this? No, there is no fire detection equipment in the exhaust hood and all utilities shutdowns, termination/ disconnection (e.g. power, med gases, etc.) will be performed by the VA
  11. Are we removing countertops and cabinets?  If so, can you give a linear foot of amount of cabinets and countertops to be removed.  Yes, the Clean Demo (without asbestos) will include both Wall and base cabinets and countertops. The following are the approximate Linear footage of each: 5B 102: ±21 LF Wall Cabinets / ±51 LF Base Cabinets / ± 51 LF Countertops 5B 103: ± 9 LF Wall Cabinets/ ± 9 LF Base Cabinets / ± 9 LF Countertops 6B 102: ± 9 LF Wall Cabinets/ ± 12 LF Base Cabinets / ± 16 LF Countertops 6B 103: ± 10 LF Wall Cabinets/ ± 10 LF Countertops 6B 104: None
  12. How many drying racks are being removed from the wall? 1 Beaker drying rack located in Rm #6B 102
  13. How many exhaust hoods are being removed? 1 exhaust hood in Rm #6B 102
  14. Is there any electrical work? No

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Pamela R Moffitt

Documents

Files (10)

  • 36C24726Q0749_2.docx

    27 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • ACM Survey March 2026 Rooms 6B 102 6B 103 6B 104 5B 102 5B 103.pdf

    374 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • 36C24726Q0749_1.docx

    27 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Attachment 7-2024 ILSM.pdf

    173 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 6- VHA ICRA 1.pdf

    295 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 5- VHA PCRA 2024_1.pdf

    301 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 4- GA20260311 Wage Determination.pdf

    38 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 3 Applicable Provisions and Clauses.docx

    65 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 2- Asbestos Abatement Specs.docx

    477 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment 1-SOW - Abatement 6B-102 .docx

    41 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Asbestos Abatement – Building 801, VA Augusta Health Care System

    Notice 94cc4c5d6f53477583c7297b922ad0e4 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Asbestos Abatement – Building 801, VA Augusta Health Care System

    Notice 0d6bfba5d9b4490fa26047c737d4e3bd on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    Asbestos Abatement – Building 801, VA Augusta Health Care System

    Notice 9764ee4c2c14423783851d8c596e9159 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

36C24726Q0749

Archive Date

Oct 9, 2026

Office Address

AUGUSTA, GA, 30904