155mm M795 Metal Parts Artillery Assembly Ceiling Increase Justification and Approval

Awarded on September 24, 2025. Full description on SAM.gov.

Overview

Posted
December 3, 2025
Notice type
Justification
NAICS
332993: Ammunition (except Small Arms) Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
Place of performance
Wilkes Barre, Pennsylvania, 18702
Last updated
Nov 5, 2026
First published
Last updated on SAM.gov
Award date
Sep 24, 2025
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
W15QKN-19-D-0084
Notice ID
912e04563f284ce4be6737a532c85feb

Description

The U.S. Army Contracting Command-New Jersey (ACC-NJ) on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS) both located at Picatinny Arsenal, New Jersey awarded a Sole Source, Firm Fixed Price (FFP) modification for the manufacture, test, packaging, and delivery of 155mm M795 Metal Parts Assembly.  

Modification P00022 was awarded under the current contract W15QKN-19-D-0084 with General Dynamics OTS (Wilkes Barre), LLC, 1500 Highway 315 Blvd, Wilkes Barre, PA 18702-7005 to increase the contract ceiling by $15,000,000.00 from $891,165,000.00 to $906,165,000.00.  This modification was issued under the authority of 10 U.S.C.3204(c)(1); as implemented by FAR 6.302-1(a)(2)(ii)(B)-Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements in accordance with the attached Justification and Approval.  This modification is to ensure adequate property management and production support of the Scranton Army Ammunition Plant (SCAAP), a Government Owned, Contractor Operated facility as a result of increased production. Appropriate and available funds are available for this acquisition.

This announcement is for notification purposes only and shall NOT be construed as a formal Request for Proposal (RFP) nor is the Government obligated to issue an RFP. Any information or exchanges between Contractors and the USG are at no cost and/or obligation to the USG. Telephone inquiries will not be accepted.

Full description on SAM.gov

Award Overview

Award Number

W15QKN-19-D-0084

Award Amount (SAM.gov award notice)

Not specified

Award Date

Sep 24, 2025

Awardee

Not specified

Original Solicitation

Notice ID: 912e04563f284ce4be6737a532c85feb

Posted Date: Dec 3, 2025

Original Response Deadline: Not specified

Task Orders Under This IDV

Top 10 by total obligated

10
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Apr 29, 2025
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Mar 11, 2025
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Oct 31, 2022
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Apr 19, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned May 31, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Aug 30, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Oct 17, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Nov 15, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Mar 26, 2024
  • W15QKN21F0097
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $216.5MSigned Sep 27, 2023

More From This Vendor

Top 5 most recent

5
  • W15QKN19F0327
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $2.4MSigned Aug 10, 2026
  • W15QKN26FA253
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $44.6MSigned Jul 20, 2026
  • W15QKN25D0029
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    —Signed Jun 23, 2026
  • W15QKN24F0527
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $612.9MSigned Jun 22, 2026
  • W15QKN24F0527
    GENERAL DYNAMICS OTS (WILKES BARRE), LLC
    Department of DefenseNAICS 332993
    $612.9MSigned Jun 22, 2026

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • JA Redacted M795 Metal Parts Ceiling Increase W15QKN19D0084 20250918.pdf

    1.2 MBAdded in Justification version 6Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchived

    155mm M795 Metal Parts Artillery Assembly Ceiling Increase

    Notice 970c8fc3517e4121b3ca32637a01b96f on SAM.gov

  2. 6
    Version 6JustificationArchivedCurrent

    Type changed from Award Notice to Justification

    155mm M795 Metal Parts Artillery Assembly Ceiling Increase Justification and Approval

    Notice 912e04563f284ce4be6737a532c85feb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0010 - The purpose Amendment 0010 is to incorporate the updated questions and answers attachment and to formally revise the Prototype Project Opportunity Notice (PPON) Volume IV row of the Section 3.2.1 table. Specifically, this amendment:1. Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 35 Updated MACE Offeror Questions Addressed (Dated 11-12), incorporating Questions #32 and #33. Please note Attachment 35 has been uploaded as a Controlled attachment. PPON Document MACE Extended November 30 W15QKN-26-R-1C5R (Dated 11-12), revised to incorporate the updated attachment list in Section 11 and Volume IV row of Section 3.2.1 table. 2. Establishes Proposal Submission Boundaries: This correction ensures that the SOW Section 6.0 Milestone Table remains strictly in Volume III (Cost/Price) as a priced document, while the Section 889 Certification is properly submitted within Volume IV (Miscellaneous Agreement Documentation).Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 12, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes..***********************************************************************************************************************************End of Narrative 0010************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0009 - The purpose of this Amendment 0009 is to incorporate the updated questions and answers attachment, formally revise the proposal submission portal instructions in the Prototype Project Opportunity Notice (PPON) and to add Attachment 34. Specifically, this amendment: Formally Incorporates Updated Attachments and a new attachment: The following attachments are incorporated into the solicitation and replace all previous versions: Attachment 33 Updated MACE Questions Addressed (Dated 11-5), incorporating Questions #24 through #31 (including key clarifications regarding propellant GFE, NRE milestone formatting, and payload canister compatibility). Please note Attachment 33 has been uploaded as Controlled attachment. Attachment 34 12961016 Rotating Cover Band has been uploaded as Controlled attachment in response to question #28. PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 11-5) has been revised to incorporate the updated attachment list in Section 11. Amends the PPON Submission instructions: The PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated11-5) has been revised in Section 3.1.13 to formally correct the submission portal from SAM.gov to Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module: Revised Text: 3.1.13 All proposal submissions shall be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (https://piee.eb.mil) .The direct solicitation link may be accessed via the active solicitation notice on SAM.gov. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended attachments (dated November 5, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. **************************************************************************************************************************************End of Narrative 0009************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0008 - The purpose of this Amendment 0008 is to incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Formally Incorporates Updated Attachments: The following updated attachments are incorporated into the solicitation and replace all previous versions: Attachment 30 Updated MACE Offeror Questions Addressed (Dated 10-29), incorporating Questions #20 through #23.Attachment 31 Updated MACE CLIN Matrix (Dated 10-29), to clarify that the due dates for CLINs 0001A and 0014A represent the initiation of NRE activities, and that payment may be earned across interim milestones per Question #23.Attachment 32 Updated Statement of Work (SOW) (Dated 10-29), removing the administrative reference to Attachment B in SOW Section 8.0 per Question #21.Amends the PPON Text: The Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN-26-R-1C5R Dated 10-29) has been revised in Section 3.3.3 (Volume III, Cost/Price) to add the following language to the third paragraph: to include the interim milestone allocations for Non-Recurring Engineering (NRE) under CLIN 0001A and CLIN 0014A. The attachment list has been updated to incorporate the revised attachments. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes.*******************************************************************************************************************************************************************************************************************************************End of Narrative 008 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0007 - The purpose of this Amendment 0007 is to extend the solicitation response deadline, incorporate updated questions and answers, and issue revised solicitation attachments. Specifically, this amendment: Extends the Proposal Submission Deadline: The solicitation response deadline is extended from October 30, 2026, to 1500 EST on November 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals that deliver the best value to the Government. As a result, the Prototype Project Opportunity Notice (PPON Document: PPON MACE EXTENDED November 30 W15QKN26R1C5R Dated 10-27) has been revised to reflect the new response deadline and the updated attachments list. Incorporates Updated Attachments: The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 27 Updated MACE Offeror Questions Addressed (Dated 10-26), incorporating Questions #17 through #19.Attachment 28 Updated Statement of Work (SOW) (Dated 10-26), reflecting the revised anticipated award date of March 29, 2027, while maintaining relative milestone durations. Attachment 29 Updated MACE CLIN Matrix (Dated 10-26), incorporating dedicated Non-Recurring Engineering (NRE) line items pursuant to Question #17. Instruction to Offerors: All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. ************************************End of Narrative 0007 ******************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0006 - The purpose of amendment 0006 is to update the Question and Answer document from Attachment 23 - Updated MACE Offeror Questions Addressed 10-5 to Attachment 26 - Updated MACE Offeror Questions Addressed 10-15. This amendment also updates the PPON (PPON MACE Extended Updated Attachments (Updated 10-15)) to add Attachment 26 to the attachment list.*********************End of Amendment 0006************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0005 - The purpose of this Amendment 0005 is to resolve the schedule discrepancies identified in the solicitation and provide the definitive baseline for all proposal submissions. Specifically, this amendment: The Government acknowledges the discrepancy between the delivery dates specified in the original Statement of Work (SOW) (Attachment 7) and the performance periods specified in the original MACE CLIN Matrix (Attachment 4), which was caused by the proposal submission extension in Amendment 0001. This Amendment 0005 provides a revised and corrected Statement of Work (SOW) and CLIN Matrix. All schedule milestones have been aligned to relative durations (Months After Agreement Award) to ensure a stable, executable performance period. Amendment 0005 also adds the Updated MACE Questions Addressed plus an updated PPON which lists the amended attachments. The following updated attachments are formally incorporated into the solicitation and replace all previous versions: Attachment 25 Updated Statement of Work (SOW) (Dated 10-6) Attachment 24 Updated MACE CLIN Matrix (Dated 10 6) Attachment 23 Updated MACE Questions Addressed (Dated 10-5) PPON Document MACE Extended Updated Attachments W15QKN 26R1C5R (Dated 10-6) All Offerors shall use the timelines, relative durations, and CLIN structures specified within these amended documents (updated attachments October 5 and 6, 2026) as the sole, definitive basis for their proposal submissions, including their Technical, Schedule (IMS), and Cost/Price volumes. *********************End of Amendment 0005************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0004 - The purpose of amendment 0004 is to update the Question and Answer document from Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 to Attachment 16 - Updated MACE Offeror Questions Addressed 9-24. Amendment 0004 also serves as notification that 6 additional TDP documents have been uploaded to SAM.gov. Vendors who have already been approved for the TDP can access the documents immediately, and those not previously approved may request access through SAM. **********************************************End of Amendment 0004************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0003 - The purpose of this amendment 0003 is to add Attachment 15 - Updated MACE Offeror Questions Addressed 9-17 **************End of Amendment 0003************************************************************************************************************************************************************************************************************************************************************************************************************************************Amendment 0002 - The purpose of this amendment 0002 is to add Attachment 15 - MACE Offeror Questions Addressed. *********************End of Amendment 0002 Narrative **************************************************************************************************************************************************************************************************************************************************************************************************************************** Amendment 0001 - The purpose of this amendment 0001 is to extend the solicitation response deadline from September 30, 2026 to October 30, 2026. This extension is granted to ensure all potential offerors have sufficient time to conduct thorough analyses, address recent technical clarifications, and submit comprehensive, high-quality proposals which deliver the best value to the Government. As a result of the extension, the Prototype Project Opportunity Notice (PPON) has been revised to reflect the new response deadline. Attachment 1 - Terms and Conditions has been updated in Supplement 5, Sub Section number 2 Outside Funding Contribution Schedule to change the Basic Agreement Years from FY 2026, FY 2027, FY 2028 to FY 2027, FY 2028, FY 2029. ****End of Amendment 0001 Narrative****************************************************************************************************************************** 155mm Modular Artillery for Combat Effectiveness (MACE) - Please refer to Prototype Project Opportunity Notice (PPON) and attachments. Please note: Attachment 8 - Purchase Description and Attachment 9 - Packing and Unitization Drawings will be provided to Offerors upon request once the Offeror signs, completes and submits the following documents for contracting approval: Attachment 12 Technical Data Request Questionnaire; Attachment 6 Non-Disclosure and Non US Agreement plus Attachment 14 DD2345 Military Critical Technical Data Agreement. Please refer to section 8 of the PPON for further information.
73%
Solicitation11/30/2026
Base Bleed Stand Alone OTA - Please refer to attachments.
68%
Solicitation04/30/2026
amended to allow vendor to post revised offer and attempt to get competition
59%
Combined Synopsis09/08/2026
The Naval Surface Warfare Center, Indian Head Division (NSWC IHD), Contracts Department intends to issue a Firm-Fixed-Price (FFP) contract on a sole source basis to Northrop Grumman Systems Corporation. The NAICS is 332993. The Contractor shall develop and produce new Austempered Ductile Iron (ADI) 5 Inch Projectile Bodies compatible with the MK 45 Gun Weapon System. In accordance with 10 USC §4022, the Government will be awarding a follow-on FAR contract. The Naval Energetic Systems and Technologies (NEST) Request for Prototype Projects (RPP), under which this prototype OTA was awarded, included provisions for a follow-on production contract. The prototype OTA award for the ADI 5 Inch Projectile Bodies development and qualification was competitively awarded and the associated tasks mentioned above were delivered successfully and accepted by the Government as the basis for the prototype build. The participant in the OTA (Northrop Grumman Systems Corporation) successfully completed the prototype projects provided for in N001742390042. As such, the requirements of 10 USC §4022(f)(1) and DFARS 206.001-70 have been met and a follow-on contract for production can proceed without further competition. THIS NOTICE IS NOT A REQUEST FOR PROPOSAL. This acquisition is being pursued on a sole source basis under the statutory authority of 10 USC 4022(f)(1), as implemented in DFARS 206.001-70, Exception for prototype projects for follow-on production contracts. This notice of intent is not a request for competitive proposals nor does it restrict the Government from an ultimate acquisition approach; however, the Government will consider all responses received to this notice. A determination by the Government not to compete this requirement is solely within the discretion of the Government. This notice should not be construed as a commitment by the Government for any purpose. Requests for solicitation will not receive a response. All information is to be submitted at no cost or obligation to the U.S. Government. The U.S. Government reserves the right to reject, in whole or in part, any input as a result of this market survey. The U.S. Government is not obligated to notify respondents of the results of this survey. If a formal solicitation is generated at a later date, a solicitation notice will be published. All interested sources shall provide the organization name, address, point of contact, phone number, fax number, e-mail address, business size, taxpayer identification number, DUNS number, and CAGE Code. In addition, all interested sources shall provide a summary of their company’s capabilities. All responding sources must email their response submissions no later than 4:00 pm EST, 18 November 2026 to: Sean McAvoy, Contract Specialist NSWC IHD 3rd Avenue, Bldg. 61N Picatinny Arsenal, NJ 07806-5000 sean.p.mcavoy.civ@us.navy.mil
57%
Special Notice11/18/2026
This award is for a five-year Requirements production contract that allows for Firm-Fixed Price (FFP) and Cost Plus Fixed Fee (CPFF) Delivery Orders (DOs) for the 120mm, Advanced Multi-Purpose (AMP) M1147 High Explosive Multi-Purpose with Tracer (HEMP-T) Cartridges for US Army and Foreign Military Sales (FMS) customers, both known and unknown.
54%
AwardedOpen

Additional Details

Solicitation Number

W15QKN-19-D-0084

Archive Date

Jan 2, 2026

Office Address

PICATINNY ARSENAL, NJ, 07806-5000