GovChime
Notice ID: 6867eb461e174a15bdfa137788761638SolicitationArchived

Power and Data relocation

Archived on July 1, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM MDT
Posted
May 16, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R8 ACQUISITION MANAGEMENT DIVISION
Place of performance
Aberdeen, SD, 57401
Last updated
Nov 14, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
47PJ0025R0056
Notice ID
6867eb461e174a15bdfa137788761638

Description

The General Services Administration, Region 8, is initiating a project to remove approximately Thirty-two (32) electrical & data feeds and install nine (9) new power & data feeds and two (2) power only feeds, and remove and run new data cables to nine (9) existing locations In room 215 of the federal building Aberdeen South Dakota. The contractor shall provide labor, materials, equipment and supervision necessary to perform: Pedestrian control: Contractor shall coordinate sequencing and control measures with the Project Manager and the Property Manager. Contractor shall provide barricades to prevent access of the public into the work areas; and shall protect the public at all times. Contractor shall demo all electrical wires & data cables and conduit running to the identified power feeds on the map as C (Cap). Electrical Wires and conduit shall be removed back to the nearest junction box and have knockout covers installed on all unused knockouts. Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops. Contractor shall mark any unused circuits in the breaker panel as spare and mark all junction boxes with breaker panel location and circuit number. All dedicated circuits shall have wires demoed back to the breaker panel, and breaker marked as spare Contractor shall remove old data cabling back to the agency owned switch or patch panel located in the second floor wire closet. Contractor shall provide and install all new wire and conduit for Identified as P&D (power and data) and P (power) on the map Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops Contractor shall verify reused existing circuits are not overloaded per NEC and P100. All new power feeds shall be installed per NEC. Conductors #10 and below must be solid copper conductors. Contractor shall provide and install a new panel circuit directory. Contractor shall provide and install circuit information labels on all outlet covers. Metal-Clad Cable may be used for portions of branch circuits not excluded below and that do not terminate directly at panel board. Metal-Clad Cable must be steel armored and not exceed #10 AWG. Metal-Clad Cable must be labeled a minimum of every three feet with 360 degree paint bands indicating number of conductors and voltage (either 480/277 or 208/120v) of conductors. Conduit systems must be used between the panelboard and the first wiring device. All Metal-Clad Cable runs must be provided with permanent typed labels at all deck-to-deck wall penetrations with tags indicating panelboard and circuit feed from. Individual Metal-Clad Cables must NOT contain more than three current carrying conductors to prevent having to derate the cables due to heat. Metal-Clad Cable must be secured to the structure as stipulated in the National Electric Code unless otherwise noted in this document. All cables must be secured within 12 inches of the cable termination device. Snap in type fittings must not be used. The contractor shall provide and install two cables per location shown on map as K (keep) and P&D (power and data) for a total of thirty six (36) cables. Cabling shall be Leviton LM-RDT Cat 6A UTP CMP (blue in color) cabling, no substitutions will be allowed. Cabling supported by ceiling tiles is not permitted. All data cabling located throughout the building is required to be in a cable management system equivalent to a tray, conduit, etc. Hooks are allowed on data circuits of 20 or less. Contractor shall terminate all data cabling in floor boxes and at agency owned equipment in the IT closet, ports to be identified at time of installation. Contractor shall test all new data cabling and provide a certification report and Leviton warranty. Contractor shall provide and install appropriate floor boxes for new electrical and data cabling. Contractor shall Seal/fill all penetrations from removed conduit or wire with approved fire caulking Contractor shall provide updated drawings showing locations of all existing and new outlets with panel and circuit information for each location at the completion of the project. Disruptive or loud work will be required to be done after hours. Contractor to field verify all site conditions to include but not limited to quantities of materials and locations of feeds to be removed and new feeds. Replace and/or repair any damage caused as a result of this project to pre-construction condition; this includes, but is not limited to ceiling tile, carpet, or electrical conduit and wires.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (8)

  • 47PJ0025R0056 Generated PDF with TOC.pdf

    1.9 MBAdded in Solicitation version 6Posted
    Download
  • IHS Electrical and Data drop removal and install new SOW Template_Construction V3 Final.docx

    3.1 MBAdded in Solicitation version 2Posted
    Download
  • USR_v4 1_11 7 24_Final (1).docx

    1.9 MBAdded in Solicitation version 2Posted
    Download
  • GSA_10740437A_REV5_PowerData (1).pdf

    1.4 MBAdded in Solicitation version 2Posted
    Download
  • Reps and Certs SAT MAR 2025.docx

    2.0 MBAdded in Solicitation version 2Posted
    Download
  • Agreement.pdf

    501 KBAdded in Solicitation version 2Posted
    Download
  • _Sol_SAT_GC_LPTA_MAR 2025 .pdf

    272 KBAdded in Solicitation version 2Posted
    Download
  • SAM.gov.pdf

    57 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 5
    Version 5PresolicitationArchived

    Power and Data relocation

    Notice f6cfc35c63184c4d983735aa321eaeb3 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Power and Data relocation

    Notice 9810f40e27ae4b6fa659a71c60e2fd06 on SAM.gov

  3. 6
    Version 6SolicitationArchivedCurrent

    Power and Data relocation

    Notice 6867eb461e174a15bdfa137788761638 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PJ0025R0056

Archive Date

Jul 1, 2025