Demolition, Removal, and Remediation
Archived on August 20, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- August 4, 2026
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationOFFICE OF THE SECRETARY
Notice details
- Office
- 6913G6 VOLPE NATL TRANS SYS CNTR
- Place of performance
- Glens Falls, New York, 12801
- PSC
- F999: OTHER ENVIRONMENTAL SERVICES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6913G626Q300044
- Notice ID
- f336001a240144fb8537659d70accad4
Description
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.
The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.
Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
See SOW for details.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (4)
- Download
RFQ 6913G626Q300044.pdf
200 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachments I-V .pdf
404 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Attachment VI - WD 2015-4151Rev 31 SAM.gov.pdf
68 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attached VII - Site Survey Report GFL VOR SSR ION 1900-1682 Rev-2.0.pdf
28 MBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Demolition, Removal, and Remediation
- 2Version 2Combined Synopsis/SolicitationArchived
Demolition, Removal, and Remediation
- 4Version 4Combined Synopsis/SolicitationArchivedCurrent
Demolition, Removal, and Remediation
Similar Opportunities
Additional Details
Solicitation Number
6913G626Q300044
Archive Date
Aug 20, 2026
Office Address
CAMBRIDGE, MA, 02142