Archived
Backflow, valves and chiller replacements
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- September 16, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of JusticeATF ACQUISITION AND PROPERTY MGMT DIV
Notice details
- Office
- ATF
- Place of performance
- Beltsville, Maryland, 20705
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 15A00025Q00000111
- Notice ID
- ac029377f1404034b4642883b6eb8991
Description
The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services:
- Backflow Preventors
- Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP
- Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP
- Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP
- Main Gate Valves
- Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.
- NOTE-This work will need to be completed during off hours.
- Chiller Pipe Replacement
- Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room.
- Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line.
- Install 2 new thread-o-lets, plug one off and connect the new chemical line.
- Replace the schedule 80 PVC all the way back to the ball valve with new split rings.
- Leak checked to be performed and monitored by building engineers for 24 hours before insulating
- Install new insulation and wrapping over new pipe and tie into existing.
- The plastic vinyl 90's may be reused if not damaged during removal
- The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe.
- Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Brandon Hodnett
Documents
Files (6)
- Download
Questions and Answers.pdf
2.5 MBAdded in Solicitation version 6Posted - Download
Solicitation 15A00025Q00000111-0002.pdf
136 KBAdded in Solicitation version 4Posted - Download
Modification 15A00025Q00000111 0001 signed.pdf
109 KBAdded in Solicitation version 3Posted - Download
Attachment 5 - Police Check.pdf
508 KBAdded in Solicitation version 3Posted - Download
Attachment 1 - SOW - NLC-BF_VLVS_CP.docx
33 KBAdded in Solicitation version 1Posted - Download
Attachment 4 - 15A00025Q00000111.pdf
247 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Backflow, valves and chiller replacements
- 2Version 2SolicitationArchived
Backflow, valves and chiller replacements
- 3Version 3SolicitationArchived
Backflow, valves and chiller replacements
- 4Version 4SolicitationArchived
Backflow, valves and chiller replacements
- 6Version 6SolicitationArchivedCurrent
Backflow, valves and chiller replacements
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
15A00025Q00000111
Archive Date
Oct 1, 2025
Office Address
WASHINGTON, DC, 20226