GovChime
Notice ID: 70a1a8b043464ae8a155569abb2e1648SolicitationArchived

Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

Archived on February 25, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM EST
Posted
February 3, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
Royalston
Last updated
Nov 18, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912WJ25Q0031
Notice ID
70a1a8b043464ae8a155569abb2e1648

Description

The U.S. Army Corps of Engineers New England District is issuing a Solicitation Notice for Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA. THE WORK CONSISTS OF: Furnish all labor, equipment, and materials necessary to renovate, repair, and rehabilitate the exterior of two buildings at the Birch Hill Dam Project. The two buildings are referred to as the Utility Building and the Maintenance Garage. Due to the age of the buildings, it is a requirement of the contract that the Contractor test the Utility Building and Maintenance garage for asbestos containing material (ACM) and Polychlorinated Biphenyls (PCBs) only in areas impacted by the work identified in this statement of work. If ACM is identified, then the Government may exercise the optional line item 1 (Asbestos Abatement Option) to properly dispose of all material that contains ACM. If PCBs are identified, then the Government may exercise the optional line item 2 (Polychlorinated Biphenyls Disposal Option) to properly dispose of all material that contains PCBs. Another component of this rehabilitation includes proper removal and disposal of items that contain lead paint. The Utility Building rehabilitation work includes the removal and disposal of existing exterior entry doors, existing overhead garage doors including tracks and motors, windows, degraded clapboards, rigid foam board insulation, vinyl siding, and trim on the 66 ft. x 24 ft single-story building. The Contractor shall properly install new exterior entry doors, new overhead garage doors, tracks, and motors, windows, framing, insulation, plywood sheathing, house wrap, rigid foam insulation, vinyl siding, and vinyl trim as a requirement for the exterior rehabilitation of the Utility Building. The Maintenance Garage rehabilitation work includes removal and disposal of existing degraded framing, existing entry door, existing overhead garage doors and tracks, windows, vinyl siding, foam board insulation, and trim on the 51ft. x 25 ft. single story building. The Contractor shall install new framing, entry door, overhead garage doors with tracks, windows, house wrap, rigid foam insulation, vinyl siding, and vinyl trim as a requirement for the exterior rehabilitation of the Maintenance Garage. All work shall be completed in accordance with the following Statement of Work, state and local building codes and completed by a licensed contractor. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 236220 with a Small Business Size Standard of $45 Million.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (7)

  • Amendment W912WJ25Q0031-0002.pdf

    844 KBAdded in Solicitation version 6Posted
    Download
  • Amendment W912WJ25Q0031-0001.pdf

    364 KBAdded in Solicitation version 4Posted
    Download
  • Utility Building Drawings.pdf

    5.8 MBAdded in Solicitation version 4Posted
    Download
  • Utility Building Lead Inspection Report.pdf

    5.6 MBAdded in Solicitation version 4Posted
    Download
  • Maintenance Garage Lead Inspection Report.pdf

    1.5 MBAdded in Solicitation version 4Posted
    Download
  • Attachments.pdf

    2.6 MBAdded in Solicitation version 4Posted
    Download
  • Solicitation W912WJ25Q0031.pdf

    843 KBAdded in Solicitation version 4Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice 9b631e96eea94c809fd3be500549d174 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice e2a13730e2a742f0a415dc4733823eee on SAM.gov

  3. 4
    Version 4SolicitationArchived

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice d17d16bfbf7f42a8a7858a527debd967 on SAM.gov

  4. 6
    Version 6SolicitationArchivedCurrent

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice 70a1a8b043464ae8a155569abb2e1648 on SAM.gov

  5. 9
    Version 9Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice 0c88a9a3ea174e1ca210ab3bb597b336 on SAM.gov

Other notices for this solicitation

  1. 2×
    Pre-SolicitationDec 26, 2024

    Utility Building and Garage Rehabilitation, Birch Hill Dam, Royalston, MA

    Notice cc1b6d16fe154ec8a34a96bd565d1c37 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ25Q0031

Archive Date

Feb 25, 2025