Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors
Archived on September 10, 2026. Original response deadline: . Full description on SAM.gov.
Description
See amendment 0001 along with related attachments
The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 3 and Corridors. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing steel windows. Incorporated into the demolition of the windows will be the safe removal of both lead and asbestos containing material as guided by the local and national rules and regulations of lead and asbestos remediation. Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows.
The anticipated substantial completion of this project is 445 calendar days after “Notice to Proceed” (NTP).
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
s06 36C26326B0034 0001 Attachments.zip
357 KBAdded in Solicitation version 6Posted - Download
s06 36C26326B0034 0001.pdf
86 KBAdded in Solicitation version 6Posted - Download
36C26326B0034_1 Replace Windows BLdg 3.pdf
382 KBAdded in Solicitation version 4Posted - Download
Attach A - FInal SOW B3 and Corridors Windows 2.0.pdf
196 KBAdded in Solicitation version 4Posted - Download
Attach B - Questions Request Form - 1 page.pdf
65 KBAdded in Solicitation version 4Posted - Download
Attach C- WRD pulled on 7.1.26 5.18.26.pdf
46 KBAdded in Solicitation version 4Posted - Download
Attach D VAAR 852.219 75 Limitations on Subcontracting Cert of Compliance_JAN 2023.pdf
174 KBAdded in Solicitation version 4Posted - Download
Attach E- Specifications.pdf
25 MBAdded in Solicitation version 4Posted - Download
Attach F- Final Drawings.pdf
128 MBAdded in Solicitation version 4Posted - Download
Attach G TMS Contractor _ VA Privacy Training.pdf
95 KBAdded in Solicitation version 4Posted
Lifecycle
- 3Version 3PresolicitationArchived
Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors
- 4Version 4SolicitationArchived
Type changed from Presolicitation to Solicitation
Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors
- 6Version 6SolicitationArchivedCurrent
Y1AA--656-12-223, Replace Windows Bldg 3 & Corridors
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
36C26326B0034
Archive Date
Sep 10, 2026
Office Address
Saint Paul, MN, 55101