PREMISE WIRING B145
Archived on May 9, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM MDT
- Posted
- April 17, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE GLOBAL STRIKE COMMAND.FA4626 341 CONS LGC
- Place of performance
- Malmstrom AFB, Montana, 59402
- PSC
- 5975: ELECTRICAL HARDWARE AND SUPPLIES
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA462626Q0009
- Notice ID
- a82c55beb32549c9b6a5a8d4210eed52
Description
Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.
Amendment 0001:
1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.
2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST
RFIs answered
- How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time.
- We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution.
- Please clarify the description “new/replacement”. Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there.
- There is a few area that require new drops to be cut in from existing cabling that is running out in the open.
- Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?
- Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2.
- Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled.
- It should state somewhere that all unused copper will be removed from the building.
- Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there.
- Yes, for terminating to the patch panel. We will patch into the switch.
See Attached SOO for full details.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
Solicitation Amendment FA462626Q00090003 SF 30.pdf
487 KBAdded in Solicitation version 8Posted - Download
WD.pdf
437 KBAdded in Solicitation version 8Posted - Download
Solicitation Amendment FA462626Q00090002 SF 30.pdf
373 KBAdded in Solicitation version 6Posted - Download
SOO NZAS-2025-00001-00001 Malmstrom AFB B145 Plenum-rated PW Upgrade v2.pdf
1.8 MBAdded in Solicitation version 6Posted - Download
QA.pdf
96 KBAdded in Solicitation version 5Posted - Download
Solicitation Amendment FA462626Q00090001 SF 30 v1.pdf
74 KBAdded in Solicitation version 2Posted - Download
Solicitation - FA462626Q0009.pdf
204 KBAdded in Solicitation version 1Posted - Download
B145 Plenum-rated PW Upgrade with New OM4 MM Fiber Drop Location Layout v1.pdf
737 KBAdded in Solicitation version 1Posted - Download
B145 Plenum-rated PW Upgrade with New Cat-6 Drop Location Layout v1.pdf
1.4 MBAdded in Solicitation version 1Posted
Lifecycle
- 1
- 2
- 3
- 4
- 5
- 6
- 8Version 8SolicitationArchivedCurrent
PREMISE WIRING B145
Similar Opportunities
Additional Details
Solicitation Number
FA462626Q0009
Archive Date
May 9, 2026
Office Address
MALMSTROM AFB, MT, 59402-6863