GovChime
Notice ID: a82c55beb32549c9b6a5a8d4210eed52SolicitationArchived

PREMISE WIRING B145

Archived on May 9, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM MDT
Posted
April 17, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE GLOBAL STRIKE COMMAND.FA4626 341 CONS LGC
Place of performance
Malmstrom AFB, Montana, 59402
PSC
5975: ELECTRICAL HARDWARE AND SUPPLIES
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA462626Q0009
Notice ID
a82c55beb32549c9b6a5a8d4210eed52

Description

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.

Amendment 0001:

1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.

2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST

RFIs answered 

  1. How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time.
    1. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. 
  2. Please clarify the description “new/replacement”. Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there.
    1. There is a few area that require new drops to be cut in from existing cabling that is running out in the open.
  3. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?
    1. Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2.
  4. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled.
    1. It should state somewhere that all unused copper will be removed from the building.
  5. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there.
    1. Yes, for terminating to the patch panel. We will patch into the switch.

See Attached SOO for full details.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (9)

  • Solicitation Amendment FA462626Q00090003 SF 30.pdf

    487 KBAdded in Solicitation version 8Posted
    Download
  • WD.pdf

    437 KBAdded in Solicitation version 8Posted
    Download
  • Solicitation Amendment FA462626Q00090002 SF 30.pdf

    373 KBAdded in Solicitation version 6Posted
    Download
  • SOO NZAS-2025-00001-00001 Malmstrom AFB B145 Plenum-rated PW Upgrade v2.pdf

    1.8 MBAdded in Solicitation version 6Posted
    Download
  • QA.pdf

    96 KBAdded in Solicitation version 5Posted
    Download
  • Solicitation Amendment FA462626Q00090001 SF 30 v1.pdf

    74 KBAdded in Solicitation version 2Posted
    Download
  • Solicitation - FA462626Q0009.pdf

    204 KBAdded in Solicitation version 1Posted
    Download
  • B145 Plenum-rated PW Upgrade with New OM4 MM Fiber Drop Location Layout v1.pdf

    737 KBAdded in Solicitation version 1Posted
    Download
  • B145 Plenum-rated PW Upgrade with New Cat-6 Drop Location Layout v1.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    PREMISE WIRING B145

    Notice a691c56dba2c48a585cb4e7ecad0823f on SAM.gov

  2. 2
    Version 2SolicitationArchived

    PREMISE WIRING B145

    Notice 45f9f8601430421c85b59823c35cdfab on SAM.gov

  3. 3
    Version 3SolicitationArchived

    PREMISE WIRING B145

    Notice 32ea755f8a4741d49b7f67e22c9927a0 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    PREMISE WIRING B145

    Notice 412c8b27341441ca8e98b3be9a217284 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    PREMISE WIRING B145

    Notice fe77db5d44544bd686bb69311f1fc2d8 on SAM.gov

  6. 6
    Version 6SolicitationArchived

    PREMISE WIRING B145

    Notice 455dedcb13fd47e5bc0423edbaac5435 on SAM.gov

  7. 8
    Version 8SolicitationArchivedCurrent

    PREMISE WIRING B145

    Notice a82c55beb32549c9b6a5a8d4210eed52 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

FA462626Q0009

Archive Date

May 9, 2026

Office Address

MALMSTROM AFB, MT, 59402-6863