PROJECT NUMBER: UT NP ARCH 100(2)
PROJECT NAME: Bridges on Delicate Arch Road
PROJECT DESCRIPTION:
Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation.
DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.
SCOPE OF THE WORK:
This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay.
PRINCIPAL WORK ITEMS:
- 20420-0000 Embankment Construction: 10,000 CUYD
- 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
- 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON
- 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
- 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
- 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
- 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
- 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
- 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
- 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
- 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – November 2026
NTP – December 2026
Contract Completion – December 2028
ESTIMATED COST RANGE:
Total estimated cost between $10,000,000 and $20,000,000
This will be solicited as a full and open competition.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (16)
- Download
Amendment A001.pdf
295 KBAdded in Solicitation version 6Posted - Download
QnA 10.15.26.pdf
106 KBAdded in Solicitation version 5Posted - Download
Sign-in Sheet.pdf
124 KBAdded in Solicitation version 5Posted - Download
UT NP ARCH 100(2) Pre-Show Powerpoint 10-8-2026.pdf
31 MBAdded in Solicitation version 5Posted - Download
6982AF27B000005.pdf
4.4 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) - PLANS.pdf
143 MBAdded in Solicitation version 3Posted - Download
UT PRA ARCH 100(1) As-Builts.pdf
7.4 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) - Cross Sections-Option Y.pdf
2.7 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) - Cross Sections-Option X.pdf
5.8 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) - Cross Sections-Schedule A.pdf
15 MBAdded in Solicitation version 3Posted - Download
UT.NP.ARCH.100(2).Bridges on Delicate Arch Road.Geotech Rpt FINAL.February 2025.pdf
49 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH100(2) Bridges on Delicate Arch Road Final Hydraulics Report_Signed.pdf
15 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) Bridges on Delicate Arch Road Pavement Memo.pdf
251 KBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) Physical Data.zip
35 MBAdded in Solicitation version 3Posted - Download
UT NP ARCH 100(2) Bridges on Delicate Arch Road-Delineators-JOFOC.pdf
110 KBAdded in Solicitation version 3Posted - Download
Site Visit Notice.pdf
91 KBAdded in Presolicitation version 4Posted
Lifecycle
- 4Version 4PresolicitationArchived
UT NP ARCH 100(2) Bridges on Delicate Arch Road
- 2Version 2Solicitation
Type changed from Presolicitation to Solicitation
UT NP ARCH 100(2) Bridges on Delicate Arch Road
- 3Version 3Solicitation
UT NP ARCH 100(2) Bridges on Delicate Arch Road
- 5Version 5Solicitation
UT NP ARCH 100(2) Bridges on Delicate Arch Road
- 6Version 6SolicitationCurrent
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
6982AF27B000005
Archive Date
Jan 1, 2027
Office Address
LAKEWOOD, CO, 80228