Notice ID: f70ee2785773df5c2495dd84b09324c9Solicitation
Wells, NV-Office Parking Lot Paving
Archived on September 30, 2014. Full description on SAM.gov.
Overview
- Posted
- September 8, 2014
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Boise National Forest
- Place of performance
- Wells, 89835
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- AG-0261-S-14-0124
- Notice ID
- f70ee2785773df5c2495dd84b09324c9
Description
The intent of this project is to replace the asphalt parking surface at the Wells District Office in Wells Nevada. The work consists of removing approximately 8770 square feet of existing asphalt surface, preparation of existing base material in preparation for new asphalt surface. Placement of new asphalt surface at 4" compacted depth. Stripe new asphalt surface according to plan diagram. Place four recycled parking bumpers, one handicap sign, two NO PARKING symbols, and one handicap pavement marker. New asphalt surface area shall closely resemble existing asphalt surface area, allowing for straightening paving edges, squaring off corners and accommodating parking as shown on plans.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-0261-S-14-0124- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationAug 26, 2014
Wells, NV-Office Parking Lot Paving
- SolicitationCurrentSep 8, 2014
Wells, NV-Office Parking Lot Paving
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This intent of this project is to construct approximately 0.5 miles of barbwire fence lines near Kalamazoo Campground on the Ely Ranger District. Construct two barbwire drift fences totaling approximately 0.5 miles in length to exclude active grazing within Kalamazoo Campground. Livestock in the campground presents a safety hazard and has resulted in numerous complaints from the public. In addition, limiting livestock activities within the campground will also extend protection of newly installed recreational infrastructure. This project includes construction of approximately 2,500 feet of new barbwire fence including installation of an estimated four 12-foot wire gates as a lump sum. | - | Combined Synopsis | 12/04/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 124PSA27Q0027 is issued as a Request for Quotation (RFQ) for replacement of cattle shades. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238990 The small business size standard is $19.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. | - | Combined Synopsis | 11/24/2026 |
The work to be completed consists of buying any and all material as well as the transportation of all material to the job site. It will also consist of the removal and haul out of old fence material. Contractor will be constructing 5 miles of 4 strand barb wire fence, along the same general line of the old fence. Use of chainsaw will be allowed to brush out fenceline as needed. This project will be solicited in accordance with FAR 12.201-1(c)(2). The Government will issue a request for quotes directly from local fencing contractors and will not issue a solicitation on SAM.gov. If your company is interested in future fencing projects in Gila NF, then ensure that you have an active SAM.gov account and provide your company name and Unique Entity Identifier (UEI Number) to Traci.jackson@usda.gov. | - | Pre-Solicitation | 11/19/2026 |
PROJECT: Lowline Area Burned Fence Construction Project -GMUG NF in Gunnison County, Colorado *******READ EACH OF THE DOCUMENTS THAT ARE LOCATED IN THE ATTACHMENTS/LINKS SECTION****************** POC'S: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and LUCAS DAHLMAN, CONGTRACTING OFFICER, at lucas.dahlman@usda.gov Questions shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than November 16, 2026, at 9:00 a.m. Mountain Time. Quotes shall be submitted via email to Janice King at janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov no later than December 3, 2026, at 9:00 a.m. Mountain Time. DESCRIPTION: The project will consist of constructing approximately 16,414 feet of four wire fence in the vicinity of the 2023 Low Line Fire, Gunnison County, Colorado. The purpose and need are to replace existing fences damaged by the 2023 Low Line Fire with a friendly wildlife fence and provide removal of old and damaged fence materials. See the SOW, SOI, SPECS and Diagram for more details. There is a Site Visit scheduled for this project for November 9, 2026, at 10:00 a.m.Mountain Time. Additional details regarding the Site Visit are located in this solicitation. | - | Combined Synopsis | 12/03/2027 |
On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post the final RFI Q&A. This amendment must be acknowledged and submitted with your proposal. ************************************************************************************************************************************** On October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 10/14/2026 to 10/29/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 09/30/2026 to 10/14/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components. | - | Combined Synopsis | 10/29/2026 |
Additional Details
Solicitation Number
AG-0261-S-14-0124
Archive Date
Sep 30, 2014