Notice ID: 15c2a0fa409f548294737c888c4ae6baAward NoticeAwarded
Exclusion Fence - Plant Material Center - Georgia
Awarded on June 20, 2017. Full description on SAM.gov.
Awarded tounder AG-2B46-C-17-0022 (source: SAM.gov award notice)• $41.3K
Overview
- Posted
- June 23, 2017
- Notice type
- Award Notice
- NAICS
- 238990: All Other Specialty Trade Contractors
Notice details
- Place of performance
- USDA - NRCS Jimmy Carter Plant Material Center 295 Morris Drive , Americus, 31719
- PSC
- 56: CONSTRUCTION AND BUILDING MATERIAL
- Last updated
- Dec 5, 2025
- Award date
- Jun 20, 2017
- Award amount (SAM.gov award notice)
- $41.3K
Identifiers
- Solicitation number
- AG-2B46-S-17-0035
- Notice ID
- 15c2a0fa409f548294737c888c4ae6ba
- Award number (PIID)
- AG-2B46-C-17-0022
Description
NOTE, THIS SOLICITATION SUPERSEDES AND REPLACES AG-2B46-S-17-0019. The United States Department of Agriculture acting through the Natural Resources Conservation Service is hereby requesting quotes (Firm Fixed Priced Award) to construct an exclusion fence at the Plant Material Center in Americus, Georgia. The fence will consist of woven wire 96" tall with 2 strands of barbed wire spaced 8" apart above the woven wire. Approximately 3,750 linear feet of this fence will need constructed. See attached Statement of Work, Construction Specifications and Drawings for additional details. The work will be performed in an open field area utilized by the PMC for the purpose of research plots. This is a SMALL BUSINESS SET ASIDE. The NAICS Code is 238990 The Magnitude of this project is between $25K - $100K The estimated time to complete the project is 30 days after Notice To Proceed has been issued. The Contractor shall furnish all materials, labor, equipment and tools required to complete fence construction.
Award Overview
Award Number
AG-2B46-C-17-0022
Award Amount (SAM.gov award notice)
$41.3K
Award Date
Jun 20, 2017
Awardee
Awardee UEI
XKKSDKLTSKB7
Original Solicitation
Notice ID: 15c2a0fa409f548294737c888c4ae6ba
Posted Date: Jun 23, 2017
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-2B46-S-17-0035- Combined Synopsis
- Awarded
This opportunity has been awarded.
- Combined SynopsisMay 16, 2017
Exclusion Fence - Plant Material Center - Georgia
- AwardedCurrentJun 23, 2017
Exclusion Fence - Plant Material Center - Georgia
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Request for Proposal (RFP) Project Title: SEPA Parking Lot Repaving and Repairs Solicitation Number: 89503511102026 The U.S. Department of Energy (DOE), Southeastern Power Administration (SEPA) is soliciting proposals from qualified contractors to perform parking lot repaving and repair services at its office facility. The required work shall be performed in accordance with the attached Performance-Based Statement of Work (PWS), which outlines the project scope, technical specifications, performance requirements, and expected outcomes. The applicable evaluation criteria are also included in the solicitation documents. Project Objective The objective of this acquisition is to restore the existing parking lot to a safe, structurally sound, properly drained, and fully functional condition suitable for use by government employees, visitors, and authorize vehicles. All work shall be completed in accordance with the requirements and specifications identified in the PWS. Location and Time of Performance Southeastern Power Administration, 1166 Athens Tech Drive, Elberton Ga. 30635. The available times are Monday-Friday 6:30am - 5:00pm Site Visit Prospective contractors are strongly encouraged, but not required, to participate in a site visit to assess existing conditions, evaluate the scope of work, and obtain a clear understanding of the project requirements before submitting a quotation. Failure to attend the site visit will not preclude a contractor from submitting a quotation or receiving consideration for award. The vendor has the option to conduct an on-site visit to determine the best approach for Southeastern Power project. Site visits will take place on November 19, 2026 at 10:30 a.m. Eastern Time and November 30, 2026 at 1:00 p.m. Eastern Time. Please email tabitha.rambert@sepa.doe.gov with your preferred attendance time. Due to security requirements, all attendees must have a valid photo ID (i.e. State Driver's License) with REAL ID compliance to gain access to the site. All contractors must submit a list of attendees at least 24 hours in advance to: tabitha.rambert@sepa.doe.gov. Please ensure that your list includes the name as it appears on your State ID and the company that will be attending. Contractors who do not possess a REAL-ID-compliant form of identification will be denied entry. Contract Type and Award SEPA anticipates awarding one (1) Firm Fixed Price (FFP) contract for the parking lot repaving and repairing project. The acquisition will be conducted using Simplified Acquisition Procedures in accordance with Federal Acquisition Regulation (FAR) Part 13, as applicable. Award will be given to the responsible contractor whose proposal represents the best value to the government, based on the evaluation criteria established in the solicitation. Proposal Submission Deadline All proposals must be received by December 15, 2026, no later than 12:00 p.m. (noon), Eastern Standard Time (EST) Proposals may be submitted by mail to: 1166 Athens Tech Rd, Elberton, GA 30635 (addressed to: Tabitha Rambert) or electronically via email to: tabitha.rambert@sepa.doe.gov Questions and Clarifications All questions, answers, requests for clarification, or inquiries concerning this solicitation will be provided to all offerors, posted on sam.gov by December 9, 2026, and shall be directed to both designated Contracting Officers: Primary: Tabitha Rambert, Contracting Officer (tabitha.rambert@sepa.doe.gov) Alternate: Juvonna Mattox, Contracting Officer (juvonna.mattox@sepa.doe.gov) Any changes or clarifications affecting solicitation requirements will be communicated through an official solicitation amendment, as appropriate (via Sam.gov). Submission Timeline Site Visit: November 19, 2026, at 10:30am and November 30, 2026 @1:00 pm, Eastern Time Deadline for submission of all questions will be December 4, 2026 @12:00 pm Eastern time and Deadline for responses will be December 9, 2026, on Sam.gov Bid Submission Deadline: 3pm Eastern Time on December 15, 2026 Expected Decision Date: December 31, 2026 Vendor Start date: Within 30 days of Award Please submit all proposals to the CO via email at: tabitha.rambert@sepa.doe.gov or via mail to:1166 Athens Tech Rd Elberton, GA 30635 before Bid Submission Deadline: 3pm Eastern Time on December 15, 2026. Vendor close-out date: NLT 2 Months from the vendor start date NOTE TO OFFERORS: The Statement of Work (SOW), applicable Wage Determinations, and Aeriel View are incorporated as attachments to this announcement. Offerors are responsible for thoroughly reviewing the solicitation and all accompanying attachments to ensure that their proposals comply with the stated requirements, and all are submitted by the specified deadline. Any amendments to the solicitation will be posted on this website. You are responsible for checking the website periodically. All offerors MUST be registered in System for Award Management (SAM) at www.sam.gov to be eligible for award of contract. The Government will evaluate proposals in accordance with the evaluation criteria established in the solicitation and applicable provisions of the Federal Acquisition Regulations (FAR). The Government reserves the right to make an award to the responsible offeror, whose proposal represents the best overall value to the Government, considering the stated evaluation factors. | - | Solicitation | 12/15/2026 |
Solicitation for ADA Compliant Modular Ramp System | - | Solicitation | 11/20/2026 |
Replace failed condensate pump with a new efficient pump Replace condensate pump and pump’s components to restore efficiency to the steam/condensate systems. | - | Combined Synopsis | 11/20/2026 |
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process. | - | Solicitation | 11/11/2026 |
Security Fence and Gate Replacement for the Automated Surface Observation System (ASOS) at the Billy Mitchell Airport (HSE) in Hatteras, NC (MHX) | - | Combined Synopsis | 11/23/2026 |
Additional Details
Solicitation Number
AG-2B46-S-17-0035
Archive Date
Jul 5, 2017