Notice ID: 5409d939047a10146f2f26b7da66c696Solicitation
IDIQ Roads Related Work Construction/Reconstruction Project
Archived on June 8, 2011. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 AM UTC+02:00
- Posted
- May 12, 2011
- Notice type
- Solicitation
- Set-aside
- HUBZone Set Aside
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Rocky Mountain Regional Office
- Place of performance
- Medicine Bow and Routt National Forest and Thunder Basin National Grasslands, Laramie, 82070
- PSC
- F: NATURAL RESOURCES MANAGEMENT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- AG-82X9-S-11-0062
- Notice ID
- 5409d939047a10146f2f26b7da66c696
Description
AG-82X9-S-11-0062, this is a new project for IDIQ Roads Related Work Construction/Reconstruction Project the USDA Forest Service, Medicine Bow Routt National Forests and Thunder Basin National Grasslands located in Region Two. The resultant contracts will be for road and parking area maintenance; road obliteration; clearing and grubbing; culvert installation and repair; sign installation and repair; erosion control; gate and fencing installation and repair; cattle guard installation and repair; material haul; haul and placement of imported borrow or aggregate; geo-textile placement; and other related road work for the Medicine Bow and Routt National Forests and Thunder Basin National Grasslands. This program will consist of multiple awards using an Indefinite Delivery Indefinite Quantity (IDIQ) type contract vehicle. Two (2) pre-proposal site visits are scheduled; May 4, 2011 at 10:00 a.m. in Laramie, Wyoming and May 11, 2011 at 10:00 a.m. in Steamboat Springs, Colorado. Details of these meetings will be included in the solicitation. The pre-proposals are NOT mandatory. All participants must RSVP by May 3, 2011 for the Laramie meeting and May 10, 2011 for the Steamboat Springs meeting, by contacting Malinda (Mindy) Jiminez at 970-295-6683. This is a total HUBZone set aside. The anticipated date for issuance of the solicitation is on or around April 18, 2011. The due date will be identified on the solicitation. The solicitation will be available for free download at www.fbo.gov. All questions pertaining to this solicitation must be submitted, in writing, to Malinda (Mindy) Jiminez at mrjiminez@fs.fed.us or via facsimile to 970-295-6699. All Offerors shall be registered to the Central Contractor's Registry (CCR) in accordance to FAR 52.204-7 to be considered responsive to this solicitation. All Offerors must be registered in ORCA in accordance to FAR 52.204-8 to be considered responsive to this solicitation. All Offerors must respond to all evaluation criteria in Section M of the solicitation to be considered responsive to this solicitation. Offerors to fail to meet these three criteria will not be considered in the Technical Evaluation of offers.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-82X9-S-11-0062- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationApr 11, 2011
IDIQ Roads Related Work Construction/Reconstruction Project
- SolicitationCurrentMay 12, 2011
IDIQ Roads Related Work Construction/Reconstruction Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. | - | Solicitation | 12/02/2026 |
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options. SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction. PRINCIPAL WORK ITEMS: 15701-0000 Soil Erosion Control: LPSM 30202-2000 Roadway Aggregate, Method 2: 310 TONS 40301-0100 Asphalt Concrete Pavement, Type 1: 350 TONS 55901-0000 Membrane Waterproofing: 445 SQYD 56205-0000 Debris Shield: LPSM 57201-0000 Repair Concrete (Deep): 38 SQYD 57201-0000 Repair Concrete (Deep Bridge Deck): 80 SQYD 57201-0000 Repair Concrete (Full Depth Bridge Deck): 80 SQYD 60901-1000 Curb, Concrete, 12-Inch Depth: 520 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A, Steel Posts: 263 LNFT ANTICIPATED SCHEDULE: Advertisement: January 2027 Award: March 2027 Notice to proceed: April 2027 Contract completion: October 2027 Total duration for construction: 120 days ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000. | - | Market Research | 11/04/2026 |
Update 10/20/2026: QA_10-20-2026.pdf posted to attachments. Update 10/5/2026: QA_10-05-2026.pdf posted to attachments. PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | - | Pre-Solicitation | Open |
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: CO OMAD 300(71) PROJECT NAME: Minuteman Missile Access PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 73 culverts. PRINCIPAL WORK ITEMS: 67001-0000 Project Lump Sum (Section 152 – Survey and Staking Drainage Structure) 67001-0000 Project Lump Sum (Section 153 – Contractor Quality Control) 67001-0000 Project Lump Sum (Section 602 – Pipe Culvert) 67001-0000 Project Lump Sum (Section 301 – Aggregate Surface Course) ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-December - 2026 Construction – April 2027 through September 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000 | - | Pre-Solicitation | 10/16/2026 |
Update 07/24/2026: QandA_07-24-2026 and updated project discription posted to attachments. Update 07/06/2026: QandA_07-06-2026.pdf posted to attachments. NOTICE OF SUBCONTRACTING OPPORTUNITY This Work consists of constructing a two-lane, temporary traffic bridge and detour, bridge removal, installation of riprap scour protection, bridge construction, stone masonry, geotechnical ground improvements, parking area improvements, approach road reconstruction This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton Project Location: Approximately 7 Miles E of West Yellowstone, MT. Project Length: 0.36 Miles Estimated Price Range: $20,000,000.00 to $30,000,000.00 Tentative Solicitation Date: Fall 2027 - Winter 2028 Tentative Fixed Completion Date: Fall 2030 INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. Contractor Information on the IDIQ contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting/yellowstone-grand-teton To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
AG-82X9-S-11-0062
Archive Date
Jun 8, 2011