Notice ID: b2345781c75c479d8c442259e336006eAward NoticeAwardedArchived
Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild
Awarded on May 7, 2026. Full description on SAM.gov.
Awarded tounder 89503426CWA000087 (source: SAM.gov award notice)• $1.9M
Overview
- Posted
- May 7, 2026
- Notice type
- Award Notice
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of Energy
Notice details
- Office
- WESTERN-UPPER GREAT PLAINS REGION
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
- Award date
- May 7, 2026
- Award amount (SAM.gov award notice)
- $1.9M
Identifiers
- Solicitation number
- 89503426BWA000063
- Notice ID
- b2345781c75c479d8c442259e336006e
- Award number (PIID)
- 89503426CWA000087
Description
GAVINS POINT - YANKTON JUNCTION 115-KV TRANSMISSION LINE REBUILD, NEBRASKA/SOUTH DAKOTA
Award Overview
Award Number
89503426CWA000087
Award Amount (SAM.gov award notice)
$1.9M
Award Date
May 7, 2026
Awardee
Awardee UEI
PQH1TPKAGB67
Awardee CAGE Code
0UQD1
Awardee Address
743 Horizon Ct Ste 250, Grand Junction, CO 81506, UNITED STATES
Original Solicitation
Notice ID: b2345781c75c479d8c442259e336006e
Posted Date: May 7, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
Links (1)
- Click here to see more information about this opportunity on FedConnectwww.fedconnect.netPosted
Lifecycle
- 2Version 2SolicitationArchived
Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild
Other notices for this solicitation
- Pre-SolicitationRelated noticeFeb 17, 2026
Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild
- SolicitationRelated noticeMar 4, 2026
Gavins Point-Yankton Junction 115 kV TLine Rebuild
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project | - | Solicitation | 03/05/2027 |
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project. | - | Solicitation | 12/18/2026 |
| - | Awarded | Open | |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotations are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0122 is issued as a Request for Quotation (RFQ) for installing 2 way sewer cleanouts. North American Industry Classification (NAICS): 237110 Water and Sewer Line and Related Structures Construction , Size Standard is $45.0 M. Set Aside: 100% small business set-aside. Project Magnitude: $25,000 to $100,000 Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote/offer in excess of $150,000 Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. Provide quote by: 4:00 PM, Mountain Time on September 16, 2026. DOCUMENTS TO RETURN: The following documents shall be submitted by the quoter for evaluation to be considered responsive: Schedule of Items The attached experience questionnaire or a document demonstrating recent and relevant experience and past performance in respect to the size and scope of this particular project. See pages 20-22 for specific information to include for evaluation. Bid guarantee per information above. Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Alisha Knaub E-mail: alisha.knaub@usda.gov For solicitation questions contact Alisha Knaub at email alisha.knaub@usda.gov. Questions are due no later than September 11, 2026, at 12:00 PM Mountain Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. A site visit is scheduled for September 10th at 1:00 pm at the Sula Work Center. RSVP to the contracting officer at alisha.knaub@usda.gov by COB September 9th. Amendment 001 - Add updated plans, posted 9/3/2026 Amendment 002 - removes 3rd party quality control requirment, posted 9/14/2026 Questions and Answers - posted 9/3/2026, and posted 9/14/2026 NOTE: The response time on September 16, 2026 is 4:00 PM MT. The date and time listed on the SF1442 is correct. | - | Combined Synopsis | 09/16/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
89503426BWA000063
Archive Date
May 22, 2026
Office Address
BILLINGS, MT, 59101