GovChime
Notice ID: b2345781c75c479d8c442259e336006eAward NoticeAwardedArchived

Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild

Awarded on May 7, 2026. Full description on SAM.gov.

Awarded tounder 89503426CWA000087 (source: SAM.gov award notice)• $1.9M

Overview

Posted
May 7, 2026
Notice type
Award Notice
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of Energy

Notice details

Office
WESTERN-UPPER GREAT PLAINS REGION
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov
Award date
May 7, 2026
Award amount (SAM.gov award notice)
$1.9M

Identifiers

Solicitation number
89503426BWA000063
Notice ID
b2345781c75c479d8c442259e336006e
Award number (PIID)
89503426CWA000087

Description

GAVINS POINT - YANKTON JUNCTION 115-KV TRANSMISSION LINE REBUILD, NEBRASKA/SOUTH DAKOTA

Full description on SAM.gov

Award Overview

Award Number

89503426CWA000087

Award Amount (SAM.gov award notice)

$1.9M

Award Date

May 7, 2026

Awardee

Awardee UEI

PQH1TPKAGB67

Awardee CAGE Code

0UQD1

Awardee Address

743 Horizon Ct Ste 250, Grand Junction, CO 81506, UNITED STATES

Original Solicitation

Notice ID: b2345781c75c479d8c442259e336006e

Posted Date: May 7, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild

    Notice b28a16deeac145dcb087b5c273db9f8e on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild

    Notice b2345781c75c479d8c442259e336006e on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeFeb 17, 2026

    Z--Gavins Point-Yankton Junction 115 kV TLine Rebuild

    Notice fa1a7234d6ba4dbb8260333bbadad74e on SAM.gov

  2. SolicitationRelated noticeMar 4, 2026

    Gavins Point-Yankton Junction 115 kV TLine Rebuild

    Notice 1684c36eafa04699ae10f3c6d79f30f1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project
-Solicitation03/05/2027
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
-Solicitation12/18/2026
-AwardedOpen
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotations are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0122 is issued as a Request for Quotation (RFQ) for installing 2 way sewer cleanouts. North American Industry Classification (NAICS): 237110 Water and Sewer Line and Related Structures Construction , Size Standard is $45.0 M. Set Aside: 100% small business set-aside. Project Magnitude: $25,000 to $100,000 Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote/offer in excess of $150,000 Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. Provide quote by: 4:00 PM, Mountain Time on September 16, 2026. DOCUMENTS TO RETURN: The following documents shall be submitted by the quoter for evaluation to be considered responsive: Schedule of Items The attached experience questionnaire or a document demonstrating recent and relevant experience and past performance in respect to the size and scope of this particular project. See pages 20-22 for specific information to include for evaluation. Bid guarantee per information above. Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Alisha Knaub E-mail: alisha.knaub@usda.gov For solicitation questions contact Alisha Knaub at email alisha.knaub@usda.gov. Questions are due no later than September 11, 2026, at 12:00 PM Mountain Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. A site visit is scheduled for September 10th at 1:00 pm at the Sula Work Center. RSVP to the contracting officer at alisha.knaub@usda.gov by COB September 9th. Amendment 001 - Add updated plans, posted 9/3/2026 Amendment 002 - removes 3rd party quality control requirment, posted 9/14/2026 Questions and Answers - posted 9/3/2026, and posted 9/14/2026 NOTE: The response time on September 16, 2026 is 4:00 PM MT. The date and time listed on the SF1442 is correct.
-Combined Synopsis09/16/2026
-AwardedOpen

Additional Details

Solicitation Number

89503426BWA000063

Archive Date

May 22, 2026

Office Address

BILLINGS, MT, 59101