GovChime
Notice ID: 2eb3ea513f06416b9c4e061852052c5cCombined Synopsis/SolicitationArchived

H--Baton Rouge commercial power disconnection service

Archived on July 21, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
June 25, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Notice details

Office
DEPT OF COMMERCE NOAA
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1333MF26Q0053
Notice ID
2eb3ea513f06416b9c4e061852052c5c

Description

Amendment 1 is to add Statement of Need with images to posting. No other changes were made to the SON or the requirement

_______________________________________

COMBINED SYNOPSIS/SOLICITATION

Disconnect from commercial Power


(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.

Solicitation number 1333MF26Q0053 is issued as a request for quotation (RFQ), for Disconnect a walk-in freezer, a standby diesel generator, and automatic transfer switch from commercial power.

This acquisition is set-aside for small business concerns. The associated NAICS code is 238210. The small business size standard is $19M.

The Government intends to award a low priced, technically acceptable firm fixed-price purchase order on an all or none basis with payment terms of Net 30.

This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

(ii) A list of line-item number(s) and items, quantities, and units of measure (including option(s), if applicable).

CLIN 0001 Services, non-personal, to provide all labor, equipment and materials (unless otherwise provided herein) in accordance with the Statement of Work and the following: Disconnect a walk-in freezer, a standby diesel generator, and automatic transfer switch from commercial power in accordance with the attached statement of work.
DELIVERY SCHEDULE: Completed Within 10 days of Award.
DELIVERY LOCATION: Louisiana Department of Wildlife and Fisheries, 2000 Quail Dr, Baton Rouge, LA 70808


(iii) Description of requirements for the items to be acquired, including documentation supporting any brand name descriptions (see 12.102).
See attached Statement of Need and Department of Labor Wage Rates: WD 2015-5177__, Revision No. 30, dated 5/13/2026, which can be found on: https://sam.gov/content/wage-determinations

INVOICES TO BE BILLED IN ARREARS VIA IPP. PROVIDE UNIT PRICE, TOTAL CLIN AMOUNT FOR EACH ITEM AND THE TOTAL ACQUISITION AMOUNT. QUOTE PRICING MAY BE PROVIDED ON ATTACHED SF18 FORM OR ON COMPANY LETTERHEAD.

(iv) Date(s) and place(s) of delivery and acceptance and f.o.b. point (see part 47).

Period of performance shall be: Completed Within 10 days of Award.

Place of Performance is Louisiana Department of Wildlife and Fisheries, 2000 Quail Dr, Baton Rouge, LA 70808

(v) A list of solicitation provisions that apply to the acquisition (see 12.205(a)) can be found on the Request for Quote Form SF18 attachment in Section IX Other Contract Clauses

(vi) A list of contract clauses that apply to the acquisition (see 12.205(b)) can be found on the Request for Quote Form SF18 attachment in Section IX Contract Clauses

(vii) Quotes are required to be received in the contracting office no later than date and time listed in the SAM.gov posting. All quotes must be submitted electronically via email to shawana.randolph@noaa.gov

THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REQUEST AND RECEIVE A CONFIRMATION OF THE QUOTE RECEIPT.

(viii) Any other additional information required by 5.101(c).

All responsible sources may submit a quotation, bid, or proposal, as appropriate, which
will be considered by the agency.


Per NOAA Deviation 2025-02/03: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Contracting officers will not consider those representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

RANDOLPH, SHAWANA

Documents

Files (3)

  • Sol_1333MF26Q0053_Amd_0001.pdf

    155 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • SON_26-398__0001.pdf

    1.0 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Sol_1333MF26Q0053.pdf

    326 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Baton Rouge commercial power disconnection service

    Notice b74f36e6a76e4724b9da592c0245076e on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    H--Baton Rouge commercial power disconnection service

    Notice 2eb3ea513f06416b9c4e061852052c5c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The response date has been extended to 20 July 2026 at 12:00 p.m. CDT. The Phase I attachment documents have been amended to remove the CUI header and Source Selection Information Footer on the Phase I Attachments. See line-outs. The Site Visit Location address has been amended to:29564 POWERHOUSE RD, WARSAW, MO 65355A Site Visit has been added for Phase I. THE SITE VISIT IS SCHEDULED FOR 30 JUNE 2026 AT 10:00 A.M. CDTLOCATION: 29564 POWERHOUSE RD, WARSAW, MO 6535538.261350, -93.405858POC: HOWARD R. JOHNSON IIIEMAIL: HOWARD.R.JOHNSON@USACE.ARMY.MILTELEPHONE: (816) 938-856Prospective offerors shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnetThe Bidder inquiry date has changed to 7 July 2026, 12:00 PM, local Kansas City time; the system will be unavailable for new inquiries after this date and time.The Proposal date has been extended to 14 July 2026 at 12:00 PM CDT.HARRY S. TRUMAN DAM POWERHOUSE ELEVATOR REPLACEMENT WARSAW, MISSOURIHST Elevator Replacement - Design Build The purpose of this project is to demolish the existing electric traction service elevator at Truman Powerhouse in Warsaw, Missouri and provide and install a new electric traction service elevator, new circuits, and new controls. All equipment/materials provided by the contractor shall be new. The elevator shall be Class C1 with a load rating of 4,500 lbs. or higher. The site visit will be scheduled during Phase 2 of this solicitation. The Government requires performance of the work described in the Statement of Work (SOW), specifications, and drawings. The contract award amount (inclusive of all contract line items (CLINs)) shall not exceed $2,400,000.00 for this project. Offerors are under no obligation to approach this amount.
-Solicitation07/20/2026
NHOTIC AV SYSTEM REPLACEMENT
-Solicitation11/20/2026
This is a combined synopsis/solicitation for commercial construction items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0015 is issued as a Request for Quotation (RFQ) for Electrical Upgrades to the Grant County Aeriel Fire Base and Tanker Cache on the Gila National Forest. This project consists of furnishing and installing a complete, code-compliant electrical distribution system to support a designated concrete pad area at the tanker base/fire cache, and the upgrade of an existing electrical/motor control panel serving the retardant pumping system. The completed system shall be suitable for continuous outdoor service in a high-use industrial environment and designed for durability, safety, and future expansion. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210. The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis12/11/2026
The Peterson Space Force Base (PSFB) 21st Contracting Squadron is requesting information from vendors who provide the work outlined in Attachement 1 – PWS Smart T Power Project. The North American Industry Classification System (NAICS) code is 238210 – Electrical Contractors and Other Wiring Installation Contractors, and the small business size standard is $19 Million Dollars This sources sought is issued for the purpose of market research in accordance with RFO Part 10. PSFB, CO is requesting information for the subject part number for Market Research Purposes.
-Market Research11/18/2027
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at theDefense Distribution San Joaquin California.Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaicsystem for building 56. but not limited to:The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed thelisting and qualification tests. All design and installation shall comply with the most recent version of each document.The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistentwith and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame sizecircuit breaker spaces are available.
-Combined Synopsis12/09/2026

Additional Details

Solicitation Number

1333MF26Q0053

Archive Date

Jul 21, 2026

Office Address

KANSAS CITY, MO, 64106