DC Battery Replacement/Disposal
Archived on October 8, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM MDT
- Posted
- September 18, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.418TH CSB.W6QM MICC-FT BLISS
- Place of performance
- New Mexico
- PSC
- J061: MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911SG26QA068
- Notice ID
- d9c94a2424fb4ec38bda976774549db6
Description
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice.
The Mission and Installation Contracting Command (MICC) – Fort Bliss, in support of services needed to remove, replace, and dispose of the DC battery system in Building 30430. The system supports critical network and communications functions, including the Land Mobile Radio (LMR) capability, and uninterrupted power is essential to preventing major outages that would degrade mission support across Fort Bliss.
Submission Instructions
Interested offerors shall submit the following by the response date listed above:
- Volume I - Price Proposal: The Offeror shall submit a completed pricing schedule for CLIN 0001 covering the initial firm-fixed-price period. All CLINs will be evaluated for completeness and price reasonableness.
- Volume II - Technical Proposal: A detailed narrative addressing how the offeror will meet all requirements in the Performance Work Statement and Technical Exhibits. Do not include any pricing information in this volume.
- Volume III- Phase In: A 72-hour phase-in period will commence upon contract award. The purpose of this period is to ensure the contractor is fully prepared to begin performance in accordance with the PWS The contractor shall use this time to finalize all arrangements, including personnel, facilities, and materials. Full performance in accordance with the solicitation requirements shall begin immediately following the conclusion of the 72-hour phase-in period.
All questions responses regarding this solicitation must be submitted by email no later than 18 September 2026 at 09:00 AM MST to ensure the Government can provide a timely response. All official Government responses will be issued through a written amendment to the solicitation.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (22)
- Download
Endeavor1.JPG
3.6 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105426 1.jpg
3.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105156 2.jpg
3.6 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_104752 1.jpg
3.6 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Endeavor tank specs.JPG
3.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_104425 1.jpg
3.4 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_104448 1.jpg
3.4 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_103257 1.jpg
3.0 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105139 1.jpg
2.9 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105116 1.jpg
2.8 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105206 1.jpg
2.6 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_103849 1.jpg
2.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_103909 1.jpg
2.4 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_103933 1.jpg
2.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20121127_105447 1.jpg
2.2 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
2013-06-06_12-57-33_623 1.jpg
1.6 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
W911SG-26-Q-A068 Questions and Answers (DC Battery).pdf
107 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
PWS Fort Bliss NEC B30430 Endeavor Battery Replacement V.2.docx
71 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
PWS Fort Bliss NEC B30430 Endeavor Battery Replacement V.2.pdf
321 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Wage Determination - 15-5455.pdf
72 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Solicitation - W911SG26QA068.pdf
4.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Combined Synopsis-Solicitation_Battery Replacement.pdf
128 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
DC Battery Replacement/Disposal
- 2Version 2Combined Synopsis/SolicitationArchived
DC Battery Replacement/Disposal
- 3Version 3Combined Synopsis/SolicitationArchived
DC Battery Replacement/Disposal
- 5Version 5Combined Synopsis/SolicitationArchivedCurrent
DC Battery Replacement/Disposal
Similar Opportunities
Additional Details
Solicitation Number
W911SG26QA068
Archive Date
Oct 8, 2026
Office Address
FORT BLISS, TX, 79916-6812