CO NP BLCA 10(1) South Rim Drive
Archived on October 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM MDT
- Posted
- October 2, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Montrose, Colorado, 81401
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6982AF26Q000022
- Notice ID
- 22ad1a2e8b3f43029f96bc109801cdc9
Description
This is a Request for Quote. Plans and specifications are available.
PROJECT NUMBER: CO NP BLCA 10(1)
PROJECT NAME: South Rim Drive Improvement
PROJECT DESCRIPTION:
The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.
SCOPE OF THE WORK:
The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive.
Principal work elements include, but are not limited to, the following:
- Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.
- Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.
- Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).
- Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors.
Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.
To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.
ANTICIPATED SCHEDULE:
- Advertisement: Mid-September 15, 2026
- Award: Mid-October 2026
- Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter)
- Construction: Early April 2027 – Late May 2027
ESTIMATED COST RANGE:
The estimated bid range for Schedule A is between $700,000 and $2,000,000.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
Amendment A002.pdf
853 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
QnA 10.01.2026 South Rim .pdf
104 KBAdded in Combined Synopsis/Solicitation version 7Posted - Download
Amendment A001.pdf
1.0 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
QnA 09.29.2026 South Rim .pdf
212 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
QnA 09.24.2026 South Rim (3).pdf
98 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Interested Vendors List - 9 23 2026.pdf
79 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
CO NP BLCA 10(1) South Rim Drive Plans.pdf
128 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
6982AF26Q000022.pdf
2.5 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Prelim Vicinity Map - CO NP BLCA 10(1) South Rim 26.07.08.pdf
1.0 MBAdded in Sources Sought version 3Posted
Links (1)
- FP-24highways.dot.govPosted
Lifecycle
- 2Version 2Sources SoughtArchived
CO NP BLCA 10(1) South Rim Drive
- 3Version 3Combined Synopsis/Solicitation
Type changed from Sources Sought to Combined Synopsis/Solicitation
CO NP BLCA 10(1) South Rim Drive
- 4Version 4Combined Synopsis/Solicitation
CO NP BLCA 10(1) South Rim Drive
- 5Version 5Combined Synopsis/Solicitation
CO NP BLCA 10(1) South Rim Drive
- 6Version 6Combined Synopsis/Solicitation
CO NP BLCA 10(1) South Rim Drive
- 7Version 7Combined Synopsis/Solicitation
CO NP BLCA 10(1) South Rim Drive
- 8Version 8Combined Synopsis/SolicitationCurrent
CO NP BLCA 10(1) South Rim Drive
Other notices for this solicitation
- SolicitationSep 17, 2026
CO NP BLCA 10(1) South Rim Drive
Similar Opportunities
- TX FW LGA 10(5) Steve Thompson Wildlife Drive
Department of Transportation · Posted 10/29/2026
- CO NP BLCA 10(1) South Rim Drive
Department of Transportation · Posted 10/28/2026
- OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Department of Transportation · Posted 10/28/2026
- CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Department of Transportation · Posted 10/27/2026
- CO OMAD 300(71) Minuteman Missile Access
Department of Transportation · Posted 10/27/2026
Additional Details
Solicitation Number
6982AF26Q000022
Archive Date
Oct 23, 2026
Office Address
LAKEWOOD, CO, 80228