GovChime
Notice ID: fda1ec274c3c41ea975d7cef16a38313Combined Synopsis/SolicitationArchived

USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

Archived on August 4, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM PDT
Posted
July 17, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
336611: Ship Building and Repairing
Agency
Department of Homeland SecurityUS COAST GUARD

Notice details

Office
SFLC PROCUREMENT BRANCH 2(00085)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
70Z08526QIBCT0048
Notice ID
fda1ec274c3c41ea975d7cef16a38313

Description

*********************Please downloand all attachments for complete solicitation******************************

This requirement is for CGC FIR that is homeported in Coast Guard District 17 at 300 North Fill Pier Cordova, AK 99574 and is
considered Full and Open Competition.

Place of Performance: Vendor' Facility/Pier

Contract Type: This solicitation will result in the award of Indefinite Delivery Requirement Contract (IDR)

1. An offeror's completed Price Schedule shall represent the best price in response to the solicitation.

2. Request for Drawings: The last day to request drawings regarding this solicitation is 8 AM PST on 11 May 2026. After this date,
further requests may not be accepted due to time constraints. To request drawings, contact Ou.T.Saephanh@uscg.mil and
Sandra.a.Martinez@uscg.mil. All requests should identify the solicitation number RFQ#70Z08526QIBCT0048. Some references
listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise
restricted distribution and have been deemed "limited access" and "export controlled" packages. In order to access these
documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the
Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able
to be granted explicit access to these packages by the USCG.

3. Site Visit Contact: Please coordinate and contact CWO Donald Ladd at Donald.N.Ladd@uscg.mil and Ou Saephanh at
Ou.t.Saephanh@uscg.mil no later than 8 AM PST on 15 May 2026.

4. Request for Clarifications: Please submit all questions using Attachment - 4 for EACH question via email only and address to
Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 8 AM PST on 18 May 2026. The subject line of all
email correspondence must state RFQ#70Z08526QIBCT0048

5. Submit quotes via email to Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 2 PM PST on 20 July
2026. The subject line of all email correspondence must state RFQ#70Z08526QIBCT0048. Quotes received after the deadline
may not be considered.

Period of Performance: 01 September 2026 – 11 November 2026

ANTICIPATED AWARD DATE: The anticipated date of award is on or about 25 August 2026.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (18)

  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480005.pdf

    692 KBAdded in Combined Synopsis/Solicitation version 17Posted
    Download
  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480009.pdf

    719 KBAdded in Combined Synopsis/Solicitation version 15Posted
    Download
  • AMEND 0008 FIR.docx

    84 KBAdded in Combined Synopsis/Solicitation version 14Posted
    Download
  • AMEND 0007 FIR.docx

    84 KBAdded in Combined Synopsis/Solicitation version 12Posted
    Download
  • AMEND 0006 FIR.docx

    84 KBAdded in Combined Synopsis/Solicitation version 11Posted
    Download
  • AMEND 0006 CGC FIR.docx

    28 KBAdded in Combined Synopsis/Solicitation version 11Posted
    Download
  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480004.pdf

    690 KBAdded in Combined Synopsis/Solicitation version 9Posted
    Download
  • Attachment 1 - Blank bid sheet CGC FIR DS FY 26.xls

    69 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • J and A - Appleton_Redacted.pdf

    168 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480003.pdf

    690 KBAdded in Combined Synopsis/Solicitation version 8Posted
    Download
  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480002.pdf

    664 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • 70Z085-26-Q-IBCT-0048 (USCGC FIR WLB-213) Clarification - revised.pdf

    82 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • SF 30 Amendment FIR DS FY 26 - 70Z08526QIBCT00480001.pdf

    664 KBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • Attachment 2 - SPECS CGC FIR DS 26 - Revised.pdf

    6.2 MBAdded in Combined Synopsis/Solicitation version 6Posted
    Download
  • 70Z08526QIBCT0048 - CGC FIR DS FY 26.pdf

    200 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 4 - Request for Clarification Form.docx

    24 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Attachment 3 - Past Performance Information Form.docx

    19 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Sources Sought - FIR DS FY 26.pdf

    206 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 2
    Version 2Sources SoughtArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 2dd50e610547435eab7f9ab795297a6e on SAM.gov

  2. 4
    Version 4Combined Synopsis/SolicitationArchived

    Type changed from Sources Sought to Combined Synopsis/Solicitation

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice bf8dbe84d13a463ab71f648136206ecc on SAM.gov

  3. 5
    Version 5Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 31b134843ed64e4090114b55e75f0f08 on SAM.gov

  4. 6
    Version 6Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 5c11b79f24ed4dedb76874bca2aa5633 on SAM.gov

  5. 7
    Version 7Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 02dab5da3ca54de6af411aa6105426a8 on SAM.gov

  6. 8
    Version 8Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice e10922f924904805a21c65d46a256481 on SAM.gov

  7. 9
    Version 9Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice fd86518b18404508b567feff868ea18c on SAM.gov

  8. 10
    Version 10Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice b313d00834a14ef1b5cedd6f5836c3ab on SAM.gov

  9. 11
    Version 11Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 61f80adbf5134d2ba0bf328d4de85e89 on SAM.gov

  10. 12
    Version 12Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice c796b85127224ffaaf158e0a78af0b0c on SAM.gov

  11. 13
    Version 13Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 617b3fabbef040c1a4a0c9f1e8bd0f29 on SAM.gov

  12. 14
    Version 14Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice a42018af5b1e483fa78ed99ab00288d3 on SAM.gov

  13. 15
    Version 15Combined Synopsis/SolicitationArchived

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice e392620da1b8444b94223f6cc02424ca on SAM.gov

  14. 17
    Version 17Combined Synopsis/SolicitationArchivedCurrent

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice fda1ec274c3c41ea975d7cef16a38313 on SAM.gov

  15. 19
    Version 19Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    USCGC FIR (WLB 213) DOCKSIDE REPAIR FY26

    Notice 0139b7aca04b4cfe90a2391c6e440da8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
100%
AwardedOpen
Amendment 0006: Amendment provides clarification regarding contractor pier power. One 480 VAC, 400A Viking electrical plug-in will be available on the same pier as the vessel, adjacent to the contractor equipment laydown area. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0005: This amendment provides responses to offeror questions concerning Work Items D-008 and D-021. The amendment corrects the drawing reference in D-008, Paragraph 3.2.3, to CG Drawing 418A-WMSL-801-1 and clarifies the Government-furnished equipment applicable to D-021. All other terms and conditions of the solicitation remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0004: provides the Government’s responses to additional offeror questions regarding drawings and technical requirements associated with Work Items D-016, D-009, and D-008. The amendment also extends the solicitation closing date and time to October 5, 2026, at 1400 Pacific Time (PT); all other terms and conditions remain unchanged. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0003: provides the Government’s response to an offeror question regarding the correct compartment identification for the MPAC work under Work Item D-018. The amendment clarifies that MPAC #1 is located in the FMMR Upper Level and that paragraph 1.1 identifies the correct work locations. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0002: Adds a clarifying note regarding the Attachment 2 Specification posted in Amendment 0001 & extends the no later than due date for receipt of quotes from 22 September 2026 to 29 September 2026 at 10:00 am Pacific Time. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Amendment 0001: Replaces the Attachment 1 Price Schedule as well as the Attachment 2 Specification. The Attachment 2 Specification originally posted was for a previous/different project regarding the cutter. The Attachment 2 Specification which is part of Amendment 0001 is an entirely different specification and therefore specifies no revisions on the Revisions page iii. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Coast Guard Cutter MIDGETT fiscal quater 2, fiscal year 2027 dockside repair. The period of performance is 2 February - 8 May 2027.
97%
Combined Synopsis10/05/2026
DOCKSIDE FOR THE USCGC HAROLD MILLER IN ST PETERSBURG, FL POP 6/01/2027-7/20/2027
88%
Market Research11/04/2026
USCGC REEF SHARK DRYDOCK FRY26 *ALASKAN CUTTER, PLEASE READ SOURCES SOUGHT ATTACHMENT CAREFULLY*
87%
Market Research11/05/2026
DRYDOCK REPAIRS FOR THE USCGC TERN POP 06/08/2027-09/28/2027
87%
Market Research11/04/2026

Additional Details

Solicitation Number

70Z08526QIBCT0048

Archive Date

Aug 4, 2026

Office Address

ALAMEDA, CA, 94501