GovChime
Notice ID: 0423ce1af26f4e47bff2b39d43a7a5e7Award NoticeAwardedArchived

Maintenance, Repair, and Preservation of Beluga RCD Barge

Awarded on June 6, 2025. Full description on SAM.gov.

Awarded tounder N4523A25C1101 (source: SAM.gov award notice)• $1.7M

Overview

Posted
June 6, 2025
Notice type
Award Notice
Agency
Department of WarDepartment of the Navy

Notice details

Office
PUGET SOUND NAVAL SHIPYARD IMF
Place of performance
WA
Last updated
Nov 12, 2026
First published
Last updated on SAM.gov
Award date
Jun 6, 2025
Award amount (SAM.gov award notice)
$1.7M

Identifiers

Solicitation number
N4523A25R6004
Notice ID
0423ce1af26f4e47bff2b39d43a7a5e7
Award number (PIID)
N4523A25C1101

Description

9 APRIL 2025: Answers to RFC 01-02 are posted. 4 APRIL 2025: The purpose of amendment 0003 is to update Section M, Subfactor 1.3, Facility. 26 MARCH 2025: The purpose of amendment 0002 is to update Section L to reflect the updated ship check date to 2 April 2025 and update the badging request due date to 28 March 2025. 20 MARCH 2025: The purpose of amendment 0001 is to update Attachment J-1 Statement of Work as of 11 March 2025 and to upload the answer to RFC 01. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), Bremerton, Washington intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of one (1) Beluga RCD Barge. The Beluga RCD Barge characteristics are 240 FT length, 60 FT width, 2.8 FT FWD/3.3 FT AFT Draft, 988.25 L Tons full displacement, 46 years of age, and hull material is steel. The Contractors facility must possess the capability of accommodating one (1) Beluga RCD Barge with the dimensions as stated above. To facilitate proper government oversight, the facility shall be located in the Pacific Northwest region. For this procurement, the Pacific Northwest region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA, westward to Neah Bay, WA, southward to Portland, OR, and eastward to Washougal, WA. Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer's Representative (COR) to deliver the vessel to the Contractor's facility. Upon docking vessel, wash, and clean vessel. Accomplish Steel repairs. Generate ABS approved 'Red Line' drawing. Coordinate ABS inspections. Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR. The vessel availability is scheduled to be 23 June 2025 to 11 August 2025.This is full and open competition. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.

Full description on SAM.gov

Award Overview

Award Number

N4523A25C1101

Award Amount (SAM.gov award notice)

$1.7M

Award Date

Jun 6, 2025

Awardee

Awardee UEI

V5XTQ5H736B7

Original Solicitation

Notice ID: 0423ce1af26f4e47bff2b39d43a7a5e7

Posted Date: Jun 6, 2025

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • N4523A26F1012
    MOTIVE POWER MARINE, LLC
    Department of DefenseNAICS 336611
    $1.0KSigned Jul 7, 2026
  • N4523A26D1004
    MOTIVE POWER MARINE, LLC
    Department of DefenseNAICS 336611
    —Signed Jul 2, 2026
  • N4523A26C1004
    MOTIVE POWER MARINE, LLC
    Department of DefenseNAICS 336611
    $2.9MSigned Jul 2, 2026
  • N4523A26C1004
    MOTIVE POWER MARINE, LLC
    Department of DefenseNAICS 336611
    $2.9MSigned May 27, 2026
  • N4523A26C1004
    MOTIVE POWER MARINE, LLC
    Department of DefenseNAICS 336611
    $2.9MSigned May 4, 2026

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (14)

  • C9 N4523A25R6004 Beluga Barge Government Responses to RFC 01-02.pdf

    258 KBAdded in Solicitation version 14Posted
    Download
  • C8 N4523A25R6004 Beluga RCD Barge Solicitation.pdf

    2.7 MBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-2 Price Proposal Worksheet.xlsx

    94 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-3 RFC Form.docx

    23 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-4 Past Performance.docx

    26 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-5 Corporate Experience.docx

    30 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-6 Drawings Request.pdf

    102 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-7 BAVR Instructions.pdf

    176 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga RCD Barge Exhibit A CDRLs and DIDs Request.pdf

    34 KBAdded in Solicitation version 8Posted
    Download
  • C8 N4523A25R6004 Beluga RCD Barge Exhibit B GFP Attachment.pdf

    47 KBAdded in Solicitation version 8Posted
    Download
  • C9 N4523A25R6004 Beluga RCD Barge Solicitation Amendment 0003.pdf

    602 KBAdded in Solicitation version 8Posted
    Download
  • C9 N4523A25R6004 Beluga RCD Barge Solicitation Amendment 0002.pdf

    633 KBAdded in Solicitation version 6Posted
    Download
  • C9 N4523A25R6004 Beluga RCD Barge Solicitation Amendment 0001.pdf

    610 KBAdded in Solicitation version 4Posted
    Download
  • C8 N4523A25R6004 Beluga Barge Attachment J-1 Statement of Work ERRATA 1.pdf

    857 KBAdded in Solicitation version 4Posted
    Download

Lifecycle

  1. 5
    Version 5SolicitationArchived

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice c323c8d1909f40029be18856698d3b70 on SAM.gov

  2. 4
    Version 4Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 0423ce1af26f4e47bff2b39d43a7a5e7 on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeFeb 3, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 68f92156cb094105ad3d063a8a1e8d95 on SAM.gov

  2. Pre-SolicitationRelated noticeFeb 21, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 92b85376800242f582672fb30c57f878 on SAM.gov

  3. SolicitationRelated noticeMar 10, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 22b9f716d8684697b1084b3a6612884c on SAM.gov

  4. SolicitationRelated noticeMar 10, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 239a311e1c33403982783fbb0f1de518 on SAM.gov

  5. SolicitationRelated noticeMar 20, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 8520a7e835be4171990e151648b3cfff on SAM.gov

  6. SolicitationRelated noticeMar 20, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 85da8ccbc8954428ad7f9855ab14cc5d on SAM.gov

  7. SolicitationRelated noticeMar 26, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice cba04af4edac4803941e9becd86cc677 on SAM.gov

  8. SolicitationRelated noticeMar 26, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice e20f09fc58d747ac94eafb86aede9f09 on SAM.gov

  9. SolicitationRelated noticeApr 4, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 4843a2870eb34a9da00432623966c01e on SAM.gov

  10. SolicitationRelated noticeApr 4, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice 754d42f84e584f3182f3d2f1023fbc0d on SAM.gov

  11. SolicitationRelated noticeApr 4, 2025

    Maintenance, Repair, and Preservation of Beluga RCD Barge

    Notice fda2ef839f8a497bb4f46078a7d2ddbc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N4523A25R6004

Archive Date

Jun 21, 2025