GovChime
Notice ID: eb12d5904eb345db828041ca2e43ec09SolicitationArchived

Maintenance Dredging, Kennebec River, Kennebec Maine

Archived on September 30, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
September 9, 2026
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
Place of performance
Kennebec River, Bath and Phippsburg Maine
PSC
Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912WJ26BA015
Notice ID
eb12d5904eb345db828041ca2e43ec09

Description

Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • Bid Abstract.pdf

    169 KBAdded in Solicitation version 5Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice c569dd9d607f42469e7566075b2be83a on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice 448aff8b481346e6b9cbfe5e5cb0fc20 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice 8502ed28f7fe4f3fbfcc8f979e9ffea7 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice 911b1c5764534547a69f67a51c1701c9 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice 2253e2ca19d744d0be5280036458d66d on SAM.gov

  6. 10
    Version 10SolicitationArchivedCurrent

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice eb12d5904eb345db828041ca2e43ec09 on SAM.gov

  7. 9
    Version 9Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Maintenance Dredging, Kennebec River, Kennebec Maine

    Notice dd4bb892b5614d96b53b4df62ed2bede on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912WJ26BA015

Archive Date

Sep 30, 2026

Office Address

CONCORD, MA, 01742-2751