MEARNG F550 Emergency Light Installation
Archived on October 1, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- September 14, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 811111: General Automotive Repair
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO ME.USPFO ME PROCUREMENT.W7NC USPFO ACTIVITY ME ARNG
- Place of performance
- Augusta, Maine, 04330
- PSC
- J023: MAINT/REPAIR/REBUILD OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912JD26QA025
- Notice ID
- 5ed11aff8ca244d09197b177fc401711
Description
Amendment 0003 - Issued 9-14-2026 - Respond to questions raised by various interested parties.
Amendment 0002 - Issued 9-8-2026 - Respond to questions raised by various interested parties.
Amendment 0001 - Issued 9-2-2026 - Respond to questions raised by various interested parties.
The Maine Army National Guard (MEARNG) requires the professional installation of a complete, government-furnished, emergency response vehicle police-style flashing light system and a battery charging system onto a Government-owned Ford F-550 Vehicle Mounted Radiation Detection System (VMRDS). The contractor shall provide all necessary personnel, tools, materials (excluding specified government-furnished equipment), and expertise to complete the installation.
Scope of Work:
The contractor is required to perform the following installations and integrations on the Ford F-550 vehicle:
-
Equipment Installation: Install all Government-Furnished Equipment (GFE) at specified locations. This includes a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, and various Whelen body, slim, and trio lights.
-
System Integration: Professionally integrate all lighting components with the central controller. All wiring must be routed, secured, protected with grommets where necessary, and concealed appropriately.
-
Power System Installation: Install one Kussmaul battery tender complete with an auto-eject shore power connection to charge the vehicle's batteries.
-
Functional Testing: Conduct a full functional test of the integrated lighting system and the power system in the presence of a Government representative to demonstrate proper functionality.
-
Vehicle Restoration: Upon completion, repair any damage to the vehicle resulting from installation activities and ensure all work areas are cleaned of debris, materials, and tools.
Government Furnished Equipment (GFE): The Government will provide the following major components for installation:
-
One (1) Whelen Inner Edge light assembly
-
One (1) Whelen Core and Controller unit
-
Two (2) Whelen slim lights (for front grill)
-
Eight (8) Whelen body lights
-
Two (2) Whelen trio lights
-
Two (2) Whelen slim lights (for front fenders)
-
One (1) Kussmaul battery tender
Contractor Requirements:
-
Provide all personnel, equipment, tools, materials (except GFE), and supervision.
-
Ensure all employees possess the required skillsets or licensing to install the lighting system according to manufacturer specifications.
-
The place of performance will be the contractor's installation facility.
-
The period of performance for the installation shall not exceed one week.
Period of Performance: The work must be completed within one (1) week from the start date.
Questions: May be submitted to the points of contact below. The due date for questions is 09SEP2026.
Submission Instructions:
All quotes must be submitted via email to the Contract Specialist, Thomas J. Ryan, at thomas.j.ryan36.civ@army.mil and the Contracting Officer, Darlene Howes, at darlene.r.howes.civ@army.mil. Quotes must include a completed SF 1449 and a separate Technical Proposal responding to the evaluation criteria outlined in the FAR 52.212-1 and 52.212-2 Addenda.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (7)
- Download
Solicitation Amendment W912JD26QA0250003 SF 30.pdf
3.9 MBAdded in Solicitation version 5Posted - Download
VMRDS 1.png
509 KBAdded in Solicitation version 5Posted - Download
Solicitation Amendment W912JD26QA0250002 SF 30.pdf
3.7 MBAdded in Solicitation version 4Posted - Download
Solicitation Amendment W912JD26QA0250001 SF 30.pdf
3.7 MBAdded in Solicitation version 3Posted - Download
Solicitation - W912JD26QA025.pdf
3.1 MBAdded in Solicitation version 1Posted - Download
WD 2015-4009 - REV 34 - 25JUN2026.txt
47 KBAdded in Solicitation version 1Posted - Download
MEARNG CST F550 Emergency Light Installation - PWS.docx
56 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
MEARNG F550 Emergency Light Installation
- 2Version 2SolicitationArchived
MEARNG F550 Emergency Light Installation
- 3Version 3SolicitationArchived
MEARNG F550 Emergency Light Installation
- 4Version 4SolicitationArchived
MEARNG F550 Emergency Light Installation
- 5Version 5SolicitationArchived
MEARNG F550 Emergency Light Installation
- 8Version 8SolicitationArchivedCurrent
MEARNG F550 Emergency Light Installation
- 10Version 10Award NoticeArchived
Type changed from Solicitation to Award Notice
MEARNG F550 Emergency Light Installation
Similar Opportunities
Additional Details
Solicitation Number
W912JD26QA025
Archive Date
Oct 1, 2026
Office Address
AUGUSTA, ME, 04333-0032