HVAC Repair by Replacement - 147th MSG
Archived on October 9, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM CDT
- Posted
- September 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO TX.USPFO TX PROCUREMENT.W7N2 USPFO ACTIVITY TXANG 147
- Place of performance
- Houston, Texas, 77034
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S7726Q1CKX
- Notice ID
- e07ce1bdbcbb4c9caac4d3f0a8b9a50e
Description
Amendment 00001
- Is temporary cooling required? There will be a temporary chiller, coordination when this needs to be removed for the permanent will need to be coordinated with CE.
- Is new electrical conductors required from the disconnect to the new unit.? Contractor to see SOW section 3 and 5.
- Is flexible weather resistant conduit approved for any electrical work need to be performed for the chiller replacement? All installs shall be per NEC and Local Code. The contractor shall submit the proposed raceway type and intended installation location for Government review before installation.
- Is a new wye strainer going to be required to prevent partials from the existing system from entering the new chiller? The contractor shall field verify whether a serviceable strainer is already installed upstream of the chiller and confirm the replacement chiller manufacturer’s filtration requirements.
- Is a new check valve going to be required at the new chiller? The contractor shall verify the existing piping arrangement and the manufacturer’s requirements for the dual VFD pump package.
A check valve shall be provided if required to:
- Prevent reverse flow through the chiller
- Protect the integral pump package
- Prevent flow through an inactive chiller
- Maintain proper system hydraulic operation
- Comply with the manufacturer’s installation diagram
If a new check valve is necessary, the contractor shall submit the proposed valve type, size, location, pressure rating, and pressure-drop information for Government review and written authorization.
- Does the base have a designated controls contractor they are currently working with? TekPlan
- Is the chiller currently on a BAS system ? Yes
- Is the chiller currently running just off of local controls? Yes, but will be integrated into the DDC system.
- Is there a certain percentage of glycol that needs to be blended into the system? The current system is not glycol. Before filling the new chiller, the contractor shall sample and test the existing chilled-water solution to determine whether glycol is present and document its existing concentration and condition. The contractor shall also review the replacement chiller manufacturer’s freeze-protection and water-quality requirements.
- Is the base going to assure that the chiller can isolated with having to drain the whole system? Contractor to field verify.
- If the base is going to require temporary cooling is there going to be chiller isolation valves added? Yes, Temporary chilling will be required as stated, isolation valves will be contractor responsibility to meet the requirements.
1. Are Press fittings permitted: Press fittings are not permitted
Please see attachments for changes. All changes were higlighted in Red.
This is a combined synopsis/solicitation for HVAC Repair by Replacement. Please see all attached documents.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
W5S077-26-Q-1CKX - 00001 HVAC Replacement.pdf
250 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Attachment 3- QnA.docx
17 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
W5S077-26-Q-1CKX - 00001 HVAC Replacement.pdf
225 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment 1 - Statement of Work.docx
1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 2 - Wage Determination.txt
11 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 2Version 2Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 3Version 3Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 4Version 4Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 5Version 5Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 6Version 6Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 7Version 7Combined Synopsis/SolicitationArchived
HVAC Repair by Replacement - 147th MSG
- 9Version 9Combined Synopsis/SolicitationArchivedCurrent
HVAC Repair by Replacement - 147th MSG
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W50S7726Q1CKX
Archive Date
Oct 9, 2026
Office Address
HOUSTON, TX, 77034-5586