Notice ID: d163bbe08eee4f0cac774eb131a9a25eSolicitation
PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM CDT
- Posted
- July 15, 2026
- Notice type
- Solicitation
- Set-aside
- Women-Owned Small Business
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
- Place of performance
- Yuma, Arizona
- PSC
- P400: SALVAGE- DEMOLITION OF BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912DY26RA107
- Notice ID
- d163bbe08eee4f0cac774eb131a9a25e
Description
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (14)
- Requires SAM.gov sign-in
Solicitation Amendment - W912DY26RA1070001 Professional Appearance.pdf
2.8 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Solicitation - W912DY26RA107 Professional Appearance.pdf
2.8 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
JET ENGINE TEST CELL B310 AB.pdf
148 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment 1 PWS FY26 USMC Yuma AZ Pre-Demo Survey.pdf
314 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
BEQ 913_As builts.pdf
38 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B662.pdf
34 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B1060 BOQ AS-BUILTS 1958.pdf
17 MBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0661.pdf
188 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0660.pdf
144 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-3.pdf
34 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-1.pdf
38 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0500.pdf
86 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
B0914-2.pdf
28 KBAdded in Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment 2_FY26_Yuma Proving Ground (Survey)_Price Spreadsheet.xlsx
14 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1Solicitation
Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
- 2Version 2Solicitation
Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
- 3Version 3SolicitationCurrent
PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona
Similar Opportunities
Additional Details
Solicitation Number
W912DY26RA107
Archive Date
Jul 15, 2027
Office Address
REDSTONE ARSENAL, AL, 35898-0000