GovChime
Notice ID: 099b3c1371774c59bca1fa5c12333269Sources SoughtArchived

RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 3

Archived on May 28, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:30 PM EDT
Posted
May 13, 2026
Notice type
Sources Sought
NAICS
336212: Truck Trailer Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.ACC-CTRS.ACC-APG.W6QK ACC-APG CONT CT WASH OFC
Place of performance
Fort Belvoir, Virginia
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W909MY-26-R-TRLR
Notice ID
099b3c1371774c59bca1fa5c12333269

Description

Amendment 3

The government is providing the following clarification for situational awareness; the response deadline remains unchanged.

Question: It is unclear to us whether or not we will be designing the integration solution or just building the hardware based on government provided specs.  The below screenshots from the RFI seem to be sort of contradictory with each other. 

-Integration Scope: the vendor is responsible for fabricating or procuring all mounting hardware, brackets, cables, and integrating/installing these components and GFE on the trailer IAW the government's TDP.

-The vendor is responsible for all non-recurring engineering (NRE) associated with designing the integration solution (e..g. tooling) to meet the performance requirements"

Answer: The vendor will be responsible for securely integrating the GFE (generator and trailer).  This integration will require either purchased or fabricated components based on the government TDP.  The TDP drawings provided at amendment 001 provide an overview to assist with reasonable estimation. 

There is some flexibility in which specific components can accomplish the task, which is why any vendor may be able to accomplish assembly either with all purchased parts or chose to fabricate unique ones.  If a vendor requires tooling to aid in fabricating unique components, they are responsible for its design and the NRE associated with that.

______________________________

Amendment 2

The purpose of this amendment is to correct the response deadline in the attached RFI "Request for Information_LTT-HC_Integration_Contracting with PM Amendment 2" to reflect 13 May 2026, 3:30 PM EST

_______________________________

Amendment 1

The purpose of this amendment is to address questions submitted by industry regarding the original RFI posting. Accordingly, the following updates have been made and are provided as attachments to this notice:

  1. Revised RFI Document: Please review the updated RFI for requirements clarifications.

  2. Associated Part Drawings: Supplemental technical drawings have been provided to assist in the development of responses.

Extension of Response Deadline:
To ensure industry has sufficient time to review the revised documentation and incorporate these updates into their submissions, the response deadline is hereby extended.

  • Original Response Deadline: May 11, 2026, at 3:30 PM EST

  • New Response Deadline: May 13, 2026, at 3:30 PM EST

__________

The Department of the Army is conducting market research in accordance with Federal Acquisition Regulation (FAR) Part 10 to identify sources capable of integrating Advanced Medium Mobile Power Sources (AMMPS) Kits onto either the 1-ton Light Tactical Trailer Heavy Chassis (LTT-HC) or the 2.5-ton M200A1 trailer. The Government owns the competitive Technical Data Package (TDP) for this integration, which will be provided as Government Furnished Information (GFI) under subsequent competitive action.

This RFI is for informational and planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. The Government will not award a contract on the basis of this RFI, nor will it pay for any information submitted by respondents.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (7)

  • Request for Information_LTT-HC_Integration_Contracting with PM Amendment 2.pdf

    589 KBAdded in Sources Sought version 3Posted
    Download
  • Request for Information_LTT-HC_Integration Amendment 1.pdf

    589 KBAdded in Sources Sought version 2Posted
    Download
  • 13230E6565E001.pdf

    533 KBAdded in Sources Sought version 2Posted
    Download
  • 18-3106-001.pdf

    525 KBAdded in Sources Sought version 2Posted
    Download
  • 04-21234L001.pdf

    258 KBAdded in Sources Sought version 2Posted
    Download
  • 18-2001-001.pdf

    213 KBAdded in Sources Sought version 2Posted
    Download
  • Request for Information_LTT-HC_Integration_Contracting.pdf

    589 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources SoughtArchived

    RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits

    Notice d05be48eb94944e790d343ea3d7631ef on SAM.gov

  2. 2
    Version 2Sources SoughtArchived

    RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 1

    Notice 03937f666f014a22b761fd974f56a7bd on SAM.gov

  3. 3
    Version 3Sources SoughtArchived

    RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 2

    Notice e9574d5e2eae4304b7aeca923d099975 on SAM.gov

  4. 5
    Version 5Sources SoughtArchivedCurrent

    RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 3

    Notice 099b3c1371774c59bca1fa5c12333269 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W909MY-26-R-TRLR

Archive Date

May 28, 2026

Office Address

ALEXANDRIA, VA, 22331-0700