Dam Valve Replacement/Repair for the Hoosier National Forest
Archived on May 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM EDT
- Posted
- March 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA EAST 6
- Place of performance
- Bristow, Indiana, 47515
- PSC
- 4810: VALVES, POWERED
- Last updated
- Nov 1, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 12444526Q0013
- Notice ID
- b8ae0c3bd4324208b0c6d7de4648e406
Description
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in attachments to this solicitation. A copy of the as-builts can be acquired upon request.
The scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (11)
- Download
Celina Dam As Builts.pdf
25 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Saddle Dam As Builts.pdf
3.3 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
U38 Dam As Builts.pdf
446 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
RFQ 12444526Q0013.pdf
437 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment D SaddleValve And StemAsBuilt.pdf
100 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment G Wage Determination.pdf
4.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment B CelinaValveInformation.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment E Statement of Work.pdf
759 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment F U38ValveInformation.pdf
242 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment A CelinaSaddleU38Specifications.pdf
144 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment C Experience Questionnaire.docx
22 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Dam Valve Replacement/Repair for the Hoosier National Forest
- 2Version 2Combined Synopsis/SolicitationArchived
Dam Valve Replacement/Repair for the Hoosier National Forest
- 3Version 3Combined Synopsis/SolicitationArchived
Dam Valve Replacement/Repair for the Hoosier National Forest
- 4Version 4Combined Synopsis/SolicitationArchived
Dam Valve Replacement/Repair for the Hoosier National Forest
- 5Version 5Combined Synopsis/SolicitationArchived
Dam Valve Replacement/Repair for the Hoosier National Forest
- 7Version 7Combined Synopsis/SolicitationArchivedCurrent
Dam Valve Replacement/Repair for the Hoosier National Forest
- 9Version 9Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Dam Valve Replacement/Repair for the Hoosier National Forest
Similar Opportunities
Additional Details
Solicitation Number
12444526Q0013
Archive Date
May 2, 2026
Office Address
Atlanta, GA, 303092449