FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
Archived on August 13, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM CDT
- Posted
- September 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- NATIONAL GUARD BUREAU.JFHQ USPFO TX.USPFO TX PROCUREMENT.W7N2 USPFO ACTIVITY TXANG 147
- Place of performance
- Houston, Texas, 77034
- PSC
- N061: INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W50S77-26-Q-A001
- Notice ID
- 087b8f4fd20e42f698870ac9f8cadf22
Description
7/22/26: The following contractor was awarded Purchase Order No. W50S77-26-P-A007 in the amount of $47,493.24 on 22 September 2026 in response to Request for Quotation No. W50S77-26-Q-A001.
Williams Diversified LLC
1913 W. Tacoma Street, Suite A
Broken Arrow, OK 74012
7/23/26: Issued Amendment 0004 to extend the due date to 29 JUL 2026. See attachment to this posting.
7/21/26: Issued Amendment 0003 to add RFO FAR Clause 52.228-13, Alternative Payment Protections; and the following statement to Section 00 00 00 - Procurement and Contracting Requirements - "If the resulting purchase order price exceeds $35,000.00, RFO FAR Clause 52.228-13, Alternative Payment Protections will be effective".
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting.
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (14)
- Download
20260723 W50S7726QA001 Amendment 0004 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 8Posted - Download
20260721 W50S7726QA001 Amendment 0003 SF 30.pdf
3.8 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
20260716 SOW Underground Electrical (FWJH262710) - Amendment 0002.pdf
1.3 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20260716 Questions and Answers Underground Electrical (FWJH262710) - Amendment 0002.pdf
98 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
W50S7726QA001 Amendment 0002 SF 30.pdf
3.9 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
20260708 W50S7726QAA001 Pre Quote Conference Sign In Sheet.pdf
420 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
20260708 W50S7726QA001 Pre-Quote Site Visit Slides.pdf
401 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
W50S7726QA001 Amend 0001 - Underground Electrical Site Photos.pdf
1.4 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
W50S7726QA001 Amend 0001 - Underground Electrical (FWJH262710) - Range Power - Utility Drawings.pdf
689 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
W50S7726QA001 Amendment 0001 SF 30.pdf
3.9 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
20260701 W50S7726Q26A001 Pre Quote Conference Sign In Sheet.pdf
339 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
20260701 W50S7726QA001 Pre-Quote Site Visit Slides.pdf
409 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
20260625 W50S7726QA001 Underground Electrical (FWJH262710).pdf
6.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
20260401 W50S7726QA001 SOW Underground Electrical (FWJH262710).pdf
1.3 MBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 2Version 2Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 3Version 3Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 4Version 4Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 5Version 5Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 6Version 6Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 8Version 8Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 9Version 9Combined Synopsis/SolicitationArchived
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 12Version 12Combined Synopsis/SolicitationArchivedCurrent
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- 14Version 14Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
Similar Opportunities
- Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot
Department of War · Posted 10/18/2026
- (ATOC) Upgrades
Department of War · Posted 09/08/2026
- RS Kerr Motor Control Centers
Department of War · Posted 05/07/2026
- Upgrade Fire Detection System at FDC Honolulu, Hawaii
Department of Justice · Posted 11/04/2026
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Peña Blvd, Denver, CO
Department of Transportation · Posted 11/02/2026
Additional Details
Solicitation Number
W50S77-26-Q-A001
Archive Date
Aug 13, 2026
Office Address
HOUSTON, TX, 77034-5586