Notice ID: 4e126876c6ba4bd6aea08f2a12ee1962SolicitationArchived

FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

Archived on September 30, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM HST
Posted
March 26, 2025
Notice type
Solicitation
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFACSYSCOM PACIFIC
Place of performance
GU
Last updated
Nov 15, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
N6274225R1301
Notice ID
4e126876c6ba4bd6aea08f2a12ee1962

Description

The work for this project includes the construction (design-bid-build) of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. The CC will include functional areas to accommodate personnel, computing equipment, user interfaces, and communications needed for planning, controlling, and directing mission activities. The power generation facility will provide power via the switchgear facility for the command center and associated infrastructure with fuel from the storage facility consisting of above ground fuel tanks, fuel off-loading infrastructure, and associated containment. The CC facility and power generation facility will be designed for Risk Category IV to meet site specific ground motion and seismic requirements to include base isolation. Construction scope and methods that will be required as part of this project include, but are not limited to: Demolition of existing housing units and the associated mitigation/disposal of asbestos, lead contaminated materials, and pesticide contaminated soil Civil site work, including grading, paving, and retaining walls Concrete construction meeting the requirements of ICC-500 Storm Shelter and including coordination of cast-in-place, tilt-up, and precast elements 150 foot Galvanized Steel Antenna Tower and associated foundation Seismic Isolation Bearings requiring a specialized installation procedure and building erection sequence involving extensive construction shoring and bracing Protection measures for nonstructural components, including flex loops for piping & conduit to accommodate seismic movement Security infrastructure includes real property features to support the installation of Security System Level (SSL)-C and Integrated Electronic Security System (IESS), site security measures, entry control, and material procurement & inspection requirements Facilities will be designed to provide cyber security engineering and validation Control System Integration requiring the aggregation of multiple control systems, including Building Controls, Fuel System Controls, and Utility Controls Complex schedule due to the nature of the concrete & isolated foundation construction, long lead times for major equipment such as Tier 2 Emergency Generators and Mechanical equipment, and multiple Joint Occupancy Date (JOD) milestones in the construction schedule to accommodate work of other contractors outfitting systems, installing equipment, and integrating controls Electrical (lighting and distribution), fiber optic and telecommunications, fire protection, sanitary sewer, and storm drainage The work will include four (4) pre-priced options. Option 1 is the price for one generator and fuel tank #2. Option 2 is the price for one generator. Option 3 is the price for one generator. Option 4 is the price for the Uninterruptible Power Supply in the command center. Option 5 is the price for B-side systems and equipment in the power plant and command center. In accordance with FAR 52.217-7 Option for Increased Quantity Separately Priced Line Item, the Government may exercise the options by written notice to the Contractor within 365 days of contract award. The magnitude of this project is estimated between $250,000,000 and $500,000,000. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 236220 AND AVERAGE ANNUAL RECEIPTS IS $45.0 MILLION OVER THE PAST THREE YEARS. The contract completion period is anticipated to be 1,323 calendar days. A sources sought notice (N62742GDSCC) for this procurement was posted on 16 March 2024 on the System for Award Management (SAM) website https://www.ssam.gov/, and a market survey was conducted that included an assessment of relevant qualifications and capabilities of potentially qualified firms. As a result of the market research analysis, a determination was made to solicit this procurement on an unrestricted basis inviting full and open competition. The NAVFAC Pacific small business office concurs with this decision. This is a best-value, trade off source selection procurement requiring the submission of both non-price and price proposals. All technical factors, when combined are of equal importance to past performance; and all evaluation factors other than price, when combined, are approximately equal to price. Proposals submitted in response to this solicitation shall be in the English language and in U.S. dollars. Contract award will be made to the responsible offeror whose offer, conforming to the solicitation, is determined to be the lowest evaluated price of proposals meeting or exceeding the acceptability standards for technical factors. The technical factors are as follows: (1) Experience, (2) Small Business Utilization and Participation, (3) Safety, (4) Management Plan, and (5) Past Performance. For evaluation of experience and past performance, a relevant construction project is defined as: New construction of an administrative, office or communications facility approximately $80 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of issuance of the solicitation. New construction of a secure space conforming to the requirements of ICD-705 approximately $10 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of the issuance of the solicitation. New construction of essential facilities located in moderate to high seismic areas approximately $80 million or more in dollar value and completed or substantially completed within the past ten (10) years from the date of the issuance of the solicitation. Moderate to high seismic areas are defined as geographic areas with a Peak Ground Acceleration (PGA) greater than 0.5g and a probability of ground motion exceedance equal or less than 2% in 50 years. The Whole Building Design Guide (WBDG) Structural Load Tool for UFC 3-301-01 can be used to identify the PGA of geographic areas. This tool can be found at Structural Load Data Tool for UFC 3-301-01 | WBDG - Whole Building Design Guide. Examples of areas with these characteristics include but are not limited to Guam, California, Alaska, and Japan. The Request for Proposal (RFP) will be available on 30 October 2024. Printed copies of the RFP will not be issued. The RFP, including the specifications and drawings, can be accessed via the System for Award Management (SAM) website at https://sam.gov/. Contractors must register at the SAM website to obtain access to the RFP. Registration instructions can be found on the SAM website. Amendments will also be posted at https://sam.gov/. It is highly recommended that firms register on the SAM website as this will be the only plan holders list available. It is the offerors responsibility to check the SAM website periodically for any amendments to the solicitation. A one-time pre-proposal site visit has been scheduled for 11 December 2024, 9:00 a.m. Chamorro Standard Time (ChST). The pre-proposal site visit is to provide offerors with an opportunity to familiarize themselves with the jobsite and conditions to be encountered, and it is not for the purpose of answering questions. Offerors interested in attending the site visit shall submit the following forms: Base Access Request Contractor Memo (Fill-in information in red). III Log (Complete in accordance with the attached How to Fill Out the III Log instructions located at the end of this Document.) Base Access Affidavit 2020 (completed for each visitor that does NOT have DBIDS pass) Foreign National Access Request Form Contractor Policy Update Memo Either a U.S. Passport or REAL ID Act Drivers License/ID The completed forms shall be submitted to Dayna Matsumura, Contract Specialist, at dayna.n.matsumura.civ@us.navy.mil on or before 14 November 2024, 2:00 p.m., Hawaii Standard Time (HST). Once approved for base access, a Tracking Number will be emailed to attendees for use when obtaining base passes at the Visitor Control Center (Northgate), Andersen Air Force Base. PLEASE BE INFORMED: The Visitor Control Center (Northgate) requires sufficient processing time for each visitor. Consequently, if an attendee submits the application forms after the specified due date and time, the attendee may not be able to attend the site visit. The furnishing of the above information, including your Social Security Number, is voluntary. However, your failure to furnish all or part of the information request may result in the Government's denial of access to the jobsite. Any of the above information furnished by you and protected under the Privacy Act shall not be released unless permitted by law and/or you have consented to such release. Upon receipt of the above information, our office will submit a letter to the Pass and ID office authorizing your entrance. On the day of the visit, attendees shall meet promptly at the Pacific Regional Training Center (PRTC) Gate and bring necessary Base Access Pass, the III Log and new Contractor Letter Memorandum to the site visit. For those that do NOT have DBIDS, pick up an approved day pass from the Visitors Center (Northgate). Attendees shall meet at the Visitor Control Center overflow parking lot.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (64)

  • 25-1301 CmdCtrl Notice14.pdf

    206 KBAdded in Solicitation version 27Posted
    Download
  • Am-0011.pdf

    3.9 MBAdded in Solicitation version 25Posted
    Download
  • Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf

    14 MBAdded in Solicitation version 25Posted
    Download
  • Am-0011 Attachments 2-24.pdf

    3.1 MBAdded in Solicitation version 25Posted
    Download
  • Am-0011 Attachments 25-44.pdf

    1.3 MBAdded in Solicitation version 25Posted
    Download
  • 25-1301 CmdCtrl Notice13.pdf

    183 KBAdded in Solicitation version 24Posted
    Download
  • 25-1301 CmdCtrl Notice12.pdf

    273 KBAdded in Solicitation version 23Posted
    Download
  • 25-1301 CmdCtrl Notice11.pdf

    354 KBAdded in Solicitation version 21Posted
    Download
  • Am-0010 Attachment 2_Revised Drawings_Signed.pdf

    24 MBAdded in Solicitation version 20Posted
    Download
  • Am-0010.pdf

    4.5 MBAdded in Solicitation version 20Posted
    Download
  • 25-1301 CmdCtrl Notice10.pdf

    264 KBAdded in Solicitation version 20Posted
    Download
  • 25-1301 CmdCtrl Notice9.pdf

    1.1 MBAdded in Solicitation version 20Posted
    Download
  • Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf

    11 MBAdded in Solicitation version 17Posted
    Download
  • Am-0009.pdf

    23 MBAdded in Solicitation version 17Posted
    Download
  • Am-0008.pdf

    963 KBAdded in Solicitation version 17Posted
    Download
  • Am-0007.pdf

    944 KBAdded in Solicitation version 17Posted
    Download
  • Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf

    15 MBAdded in Solicitation version 17Posted
    Download
  • Am-0006.pdf

    720 KBAdded in Solicitation version 17Posted
    Download
  • Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf

    5.0 MBAdded in Solicitation version 17Posted
    Download
  • Am-0005.pdf

    2.5 MBAdded in Solicitation version 17Posted
    Download
  • Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf

    9.4 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.1_20241007.pdf

    90 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.2_20241007.pdf

    128 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.4_20241007.pdf

    17 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.5_20241007.pdf

    21 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.6_20241007.pdf

    9.5 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.7_20241007.pdf

    13 MBAdded in Solicitation version 17Posted
    Download
  • R-P693_Drawings_Final_Vol14.8_20241007.pdf

    6.6 MBAdded in Solicitation version 17Posted
    Download
  • P693_Sign-in Sheets_Redacted.pdf

    6.4 MBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice8.pdf

    447 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice7.pdf

    172 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice6.pdf

    567 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice5.pdf

    1.0 MBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice4.pdf

    224 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtr Notice3.pdf

    325 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice2.pdf

    295 KBAdded in Solicitation version 17Posted
    Download
  • 25-1301 CmdCtrl Notice1.pdf

    50 KBAdded in Solicitation version 17Posted
    Download
  • Am-0004.pdf

    3.3 MBAdded in Solicitation version 17Posted
    Download
  • Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf

    25 MBAdded in Solicitation version 17Posted
    Download
  • Am-0003.pdf

    2.5 MBAdded in Solicitation version 17Posted
    Download
  • Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf

    4.6 MBAdded in Solicitation version 17Posted
    Download
  • Am-0002.pdf

    19 MBAdded in Solicitation version 17Posted
    Download
  • Am-0001.pdf

    1.1 MBAdded in Solicitation version 17Posted
    Download
  • 25-1301 P-693 RFP.pdf

    4.1 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.1_20241007-Part1.pdf

    43 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.1_20241007-Part2.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.1_20241007-Part3.pdf

    31 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.2_20241007-Part1.pdf

    40 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.2_20241007-Part2.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.2_20241007-Part3.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.2_20241007-Part4.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.2_20241007-Part5.pdf

    15 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.3_20241007.pdf

    74 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.4_20241007-Part1.pdf

    40 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.4_20241007-Part2.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.4_20241007-Part3.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.4_20241007-Part4.pdf

    39 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.4_20241007-Part5.pdf

    21 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.5_20241007.pdf

    63 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.6_20241007.pdf

    6.3 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.7_20241007.pdf

    112 MBAdded in Solicitation version 17Posted
    Download
  • P693_Drawings_Final_Vol14.8_20241007.pdf

    3.6 MBAdded in Solicitation version 17Posted
    Download
  • P693_Specs_Final_Vol01_20241007.pdf

    33 MBAdded in Solicitation version 17Posted
    Download
  • P693_Specs_Final_Vol02_20241007.pdf

    10 MBAdded in Solicitation version 17Posted
    Download

Lifecycle

  1. 22
    Version 22PresolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice daa68fc13eba4e6fa14afa38620b737f on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice ea49622653b44aed8dd36998843be82c on SAM.gov

  3. 3
    Version 3SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice dd7dba995fec4a15b4347dc534a0c815 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 632a1802a1e148f29edd38df9f871cfc on SAM.gov

  5. 5
    Version 5SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 0faadbe2043f450f890b72dff91c3b5c on SAM.gov

  6. 6
    Version 6SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice fc927fd3c3ee49ed9e603d820474b180 on SAM.gov

  7. 7
    Version 7SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice b8a75ca4f1664ae6b956fbd1534acaf1 on SAM.gov

  8. 8
    Version 8SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 076066512d9f430388925e5897d632c5 on SAM.gov

  9. 9
    Version 9SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 0808b213aaee4ce1aa82d368d39edc01 on SAM.gov

  10. 10
    Version 10SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 8af779f6c80c40abb959072f822c9c42 on SAM.gov

  11. 11
    Version 11SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 7deba0d10ad54c558371bce4ff5e37e5 on SAM.gov

  12. 12
    Version 12SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 086a44c447774577b985880bedf74bfc on SAM.gov

  13. 13
    Version 13SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 938f9e921ac14126be6b7eee1473fb52 on SAM.gov

  14. 14
    Version 14SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 69f792149ec1470589f3902f7da9d1fe on SAM.gov

  15. 15
    Version 15SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 9097404130544ac6bec687b7bdd61624 on SAM.gov

  16. 16
    Version 16SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice c4b1a95f95894be8bb54bab45cb9930f on SAM.gov

  17. 17
    Version 17SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 22dea131ef28456795edafecd52342c5 on SAM.gov

  18. 18
    Version 18SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 59b328fb3a1f4504a9dae7b2ded1ac5e on SAM.gov

  19. 19
    Version 19SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice b2f6f4b1b4274e1c8c7bdcd737c071a0 on SAM.gov

  20. 20
    Version 20SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice d1bb9729a01a4b6182bbeba67d83ef14 on SAM.gov

  21. 21
    Version 21SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 1201bf9953ce43fe89dde54ea214abd2 on SAM.gov

  22. 23
    Version 23SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 7aa4831b1d4043c390eca0a4d13d630d on SAM.gov

  23. 24
    Version 24SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice cd1f06c3d1044b548b35dcdbfe2da77e on SAM.gov

  24. 25
    Version 25SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 477d82cc5565403c8e4ee44e43ee6535 on SAM.gov

  25. 27
    Version 27SolicitationArchived

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 83a6249069034eb687e58b884e6eeb42 on SAM.gov

  26. 32
    Version 32SolicitationArchivedCurrent

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice 4e126876c6ba4bd6aea08f2a12ee1962 on SAM.gov

  27. 31
    Version 31Award NoticeArchived

    Type changed from Solicitation to Award Notice

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice f9c952566adc4232b1e3d3910f0e7902 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationOct 10, 2024

    FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM

    Notice a46f59bbd6aa432b99af30ca9b2c7d28 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

N6274225R1301

Archive Date

Sep 30, 2025