Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
Archived on August 1, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- July 9, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Navy
Notice details
- Office
- NAVSEA.NAVSEA WARFARE CENTER.NUWC DIV NEWPORT
- Place of performance
- Newport, Rhode Island, 02841
- PSC
- Z1AZ: MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- N6660426Q0291
- Notice ID
- babe6f1016c245f0adb9e74025b9f382
Description
PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED.
Amendment 0001 6/2/2026:
The purpose of this Amendment is to:
- Replace Attachment #3 with revised version dated 18 May 2026.
- Answer RFI 001 as seen below.
RFI 001
1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable?
A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed.
2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured.
A2. No new glazing is required.
3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active.
A3. Leak is no longer active. No repairs to roof are required.
4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations?
A4. See Revised Specifications (REV 1).
5. There is no spec for the glass for the windows. Will a spec section for the glass be made available?
A5. See Revised Specifications (REV 1).
6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project?
A6. Out-of-State is Allowed.
7. Are electric man-lifts permitted for use on this project?
A7. Yes, however, it might be difficult getting a man lift in the area of work.
All other solicitation terms and conditions remain unchanged.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Please see N6660426Q0291 and all attachments for complete requirement details.
Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.
Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.
A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.
You must request access to the attachment by clicking on its title and providing the reason you need access.
You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.
Your entity is responsible for managing the documents in accordance with prescribed directives.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
Please see Amendment 0002 attached. Additional Photos attached.
Please see Amendment 0003 attached.
Please see Amendment 0004 attached.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (16)
- Download
II.F. N6660426Q0291 Amendment 00004.pdf
371 KBAdded in Combined Synopsis/Solicitation version 8Posted - Requires SAM.gov sign-in
Attachment_7_Paint Study results_Redacted.pdf
1.7 MBAdded in Combined Synopsis/Solicitation version 6Posted - Download
N6660426Q0291 Amendment 00003.pdf
367 KBAdded in Combined Synopsis/Solicitation version 6Posted - Requires SAM.gov sign-in
Additional Window photos.pdf
11 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
II.F. N6660426Q0291 Amendment 00002.pdf
407 KBAdded in Combined Synopsis/Solicitation version 4Posted - Requires SAM.gov sign-in
(REV 1) BLDG 68 Room 136 Renovation - SPEC.pdf
2.4 MBAdded in Combined Synopsis/Solicitation version 3Posted - Requires SAM.gov sign-in
(REV 1) Building 68 - Room 136 Renovation - Design.pdf
2.6 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Davis Bacon WD 18 May 2026.pdf
5.4 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment_7_SITE VISIT INSTRUCTIONS .pdf
236 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_6_Generator usage log.pdf
107 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_5_ Hazmat usage log.pdf
162 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment_4_Davis Bacon WD 1_30_26.pdf
4.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment_3_Hazmat Study B68_Redacted.pdf
21 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment_2_ Drawings_25-031.pdf
3.0 MBAdded in Combined Synopsis/Solicitation version 1Posted - Requires SAM.gov sign-in
Attachment_1_ B68 Specification.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
N6660426Q0291 .pdf
278 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 2Version 2Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 3Version 3Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 4Version 4Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 5Version 5Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 6Version 6Combined Synopsis/SolicitationArchived
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
- 8Version 8Combined Synopsis/SolicitationArchivedCurrent
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
Similar Opportunities
Additional Details
Solicitation Number
N6660426Q0291
Archive Date
Aug 1, 2026
Office Address
NEWPORT, RI, 02841-1703