Notice ID: 63b102c430d1f18b6e364bb664734f9eAward NoticeAwarded
AZ FTNP SAGU 12(1), Kinney Road
Awarded on June 21, 2016. Full description on SAM.gov.
Awarded tounder DTFH6816C00027 (source: SAM.gov award notice)• $1.8M
Overview
- Posted
- June 24, 2016
- Notice type
- Award Notice
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Saguaro National Park Pima County , Tucson, 85748
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Jun 21, 2016
- Award amount (SAM.gov award notice)
- $1.8M
Identifiers
- Solicitation number
- DTFH6816B00010
- Notice ID
- 63b102c430d1f18b6e364bb664734f9e
- Award number (PIID)
- DTFH6816C00027
Description
Options W, X and Y might be awared in the next 120 days
Award Overview
Award Number
DTFH6816C00027
Award Amount (SAM.gov award notice)
$1.8M
Award Date
Jun 21, 2016
Awardee
Awardee UEI
R491E56W96K1
Original Solicitation
Notice ID: 63b102c430d1f18b6e364bb664734f9e
Posted Date: Jun 24, 2016
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 10 of 11 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Presolicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - | |||
| Solicitation | FEDERAL HIGHWAY ADMINISTRATION | Jun 24, 2016 | - |
Showing 1 to 10 of 11 results
Lifecycle
Solicitation:
DTFH6816B00010- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 5×Pre-SolicitationApr 14, 2016
AZ FTNP SAGU 12(1), Kinney Road
- SolicitationJun 14, 2016
AZ FTNP SAGU 12(1), Kinney Road
- AwardedCurrentJun 24, 2016
AZ FTNP SAGU 12(1), Kinney Road
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 | 76% | Solicitation | 11/17/2026 |
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule A: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 1.051 MILE 20301-1900 Removal of Pipe Culvert: 5 EACH 20401-0000 Roadway Excavation: 1,500 CU YD 30201-2000 Roadway Aggregate, Method 2: 2,500 CU YD 30302-1000 Ditch Reconditioning: 3,280 LN FT 40301-0100 Asphalt Concrete Pavement, Type 1: 2,500 TON 60103-0140 Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped): 3 EACH 60103-0160 Concrete, Headwall for 30-Inch Pipe Culvert: 1 EACH 60103-0280 Concrete, Headwall for 66-Inch Pipe Culvert (Includes Wingwalls): 1 EACH 60201-0800 24-Inch Pipe Culvert: 255 LN FT 60201-0900 30-Inch Pipe Culvert: 45 LN FT 60707-1200 Lining 66-Inch Pipe Culvert (HDPE Slipline): 110 LN FT 60707-1300 Lining 72-Inch Pipe Culvert (HDPE Slipline): 190 LN FT 63401-0300 Pavement Markings, Type B, Solid: 46,000 LN FT Option X: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 0.38 MILE 20420-0000 Embankment Construction: 200 CU YD 30201-2000 Roadway Aggregate, Method 2: 700 CU YD 40301-0100 Asphalt Concrete Pavement, Type 1: 650 TON 56603-0000 Reinforced Shotcrete: 180 SQ YD 60704-0000 Cleaning Culvert in Place: 7 EA 63401-0300 Pavement Markings, Type B, Solid: 8,500 LN FT Option Y: 63610-3410 Conduit, 6-Inch, HDPE (Schedule 40): 2,215 LN FT 63621-1000 Utility Box, Pullbox: 6 EA 63622-0000 Utility Trench: 2,215 LN FT ANTICIPATED SCHEDULE Advertisement: November 2026 Award: January 2027 NTP: April 2027 Construction: May 2027- October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 A NON-MANDATORY PRE-BID SITE VISIT WILL BE HELD NOVEMBER 4TH, 2026 AT 10:00AM. PLEASE SEE ATTACHEMENTS FOR ADDITIONAL INFORMATION | 68% | Pre-Solicitation | Open |
PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition. | 68% | Solicitation | 11/19/2026 |
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link. | 66% | Pre-Solicitation | Open |
Sources Sought for OR FS FREWN602 28(1), Road 28 Reconstruction This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Plans and specifications are not available at this time. Responses to this Sources Sought must be received by email no later than the date specified in the response section. This intent of this sources sought is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service Disabled Veteran Owned Small Businesses, 8(a), HUBZone, and other Small Businesses interested and capable of performing the proposed contract work. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company has the capability and experience to compete for this acquisition. Responses to this notice shall include the following: (a) Company Name (b) Address (c) Point of contact (d) Phone and email (e) UEI number (f) Bonding Capacity (per contract) (g) Type of small business, e.g. Services Disabled Veteran Owned Small Business, 8(a), HUBZone, Women Owned Small Business, Small Disadvantaged Business, or Small Business (h) Listing of your highway/bridge construction experience within the last 3 years where you were the prime contractor for work of similar type and scope. Include contract numbers, titles, locations, dollar amounts. Requirement The proposed contract action is for a firm-fixed-priced construction contract. This work consists of Full Depth reclamation of the existing roadway, aggregate surfacing and drainage. This project is located approximately 6 miles South of Silver Lake, OR. NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million. The project is anticipated to go on advertisement in Winter 2027 with construction in Spring 2027. Estimated Price Range: Between $5,000,000 and $10,000,000. Response: Responses to this Sources Sought Notice should include all information requested in (a) through (h) above. Determination by the Government not to compete this proposed contract action based on responses to this notice is solely within the discretion of the Government. The Government is not obligated to nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. Any offeror capable of providing this service shall respond to this Sources Sought by responding to the MS forms or e-mail to wfl.contracts@dot.gov no later than October 9, 2026, 1400 PST. | 66% | Market Research | 10/09/2026 |
Additional Details
Solicitation Number
DTFH6816B00010
Archive Date
Nov 14, 2016