Notice ID: bb3045943ff941c1865a23813bff85d1Award NoticeAwarded
UT FTNP ARCH 10(2), Main Entrance and Overlook Roads
Awarded on February 7, 2017. Full description on SAM.gov.
Awarded tounder DTFH6817C00010 (source: SAM.gov award notice)• $14.0M
Overview
- Posted
- February 7, 2017
- Notice type
- Award Notice
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Arches National Park
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Feb 7, 2017
- Award amount (SAM.gov award notice)
- $14.0M
Identifiers
- Solicitation number
- DTFH6816B00035
- Notice ID
- bb3045943ff941c1865a23813bff85d1
- Award number (PIID)
- DTFH6817C00010
Description
PROJECT DETAILS: UT FTNP ARCH 10(2), 11(1), 200(1), 204(1), 205(1), 206(1), 207(1), 208(1), 401(1), 403(1), 500(1), & 501(1) - MAIN ENTRANCE ROAD & OVERLOOK ROADS The project location is within Arches National Park near Moab, UT. The terrain is rolling with elevation ranging from 4,000 to 5,600 ft. This project consists of the rehabilitation, restoration, and resurfacing (3R) of approximately 25 miles of road on various routes in Arches National Park. Pulverizing or cold in place recycling of the existing roadway with an asphalt overlay will be used to improve the surface and ride of the existing roadway. Other improvements include replacement of poor subgrade, widening, minor drainage structure improvements, pullout and parking improvements, minor concrete work, roundabout construction, and other safety improvements. Schedule A 0.97 miles. Station 13+11.58 to 55+00 Schedule B 10.52 miles. Includes Schedule A and Station 550+00 to 962+54.58 Schedule C 24.08 miles. Includes Schedules A, B, and Station 55+00 to 550+00 Option X - Maintenance Road and Yard. 0.12 miles. Option Y -Residence Road. 0.11 miles Option Z - Devil's Garden Campground. 0.78 miles. ESTIMATED SIGNIFICANT QUANTITIES: 30306-3000 Pulverizing, 110,000 SQYD 40101-5600 Superpave asphalt, 70,000 TON 41601-1000 Continuous Cold in Place Recycling 1,100 STA 60901-1300 15-inch concrete curb 19,000 LNFT 60901-2300 6-inch asphalt curb, 30,000 LNFT 60902-1300 12-inch concrete curb and gutter, 6,500 LNFT 60908-1000 Asphalt Paved Ditch, 23,000 SQYD Estimated total cost is $15 to $22 million depending on the Schedules and Options awarded.
Award Overview
Award Number
DTFH6817C00010
Award Amount (SAM.gov award notice)
$14.0M
Award Date
Feb 7, 2017
Awardee
Original Solicitation
Notice ID: bb3045943ff941c1865a23813bff85d1
Posted Date: Feb 7, 2017
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $13.4MSigned Oct 22, 2026
- $20.6MSigned Oct 14, 2026
- $13.4MSigned Feb 11, 2026
- $222.1KSigned Feb 11, 2026
Contacts
Contracting Officer
Primary Contact
Ryan Phillips
Secondary Contact
Joe Wilson
Documents
No documents available.
Lifecycle
Solicitation:
DTFH6816B00035- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 9×Pre-SolicitationDec 14, 2016
UT FTNP ARCH 10(2), Main Entrance and Overlook Roads
- SolicitationJan 23, 2017
UT FTNP ARCH 10(2), Main Entrance and Overlook Roads
- AwardedCurrentFeb 7, 2017
UT FTNP ARCH 10(2), Main Entrance and Overlook Roads
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – November 2026 NTP – December 2026 Contract Completion – December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition. | 92% | Solicitation | 11/19/2026 |
PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD | 77% | Solicitation | 11/13/2026 |
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLContracts@dot.gov (Attn: Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on November 04, 2026. (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project in which you performed reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. Installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Hayden Arch Bridge is located on Hayden Arch Road approximately 5 miles west of Cody, WY. The bridge spans the Shoshone River at approximately 5,060 feet above sea level and provides access for the Bureau of Reclamation (BOR) to the Buffalo Bill Dam Power Plant. The PS&E includes one (1) base schedule with no options. SCOPE OF THE WORK: The project scope includes repairs of the Hayden Arch Bridge, reconstruction of the bridge approaches, minor drainage improvements, signing, and guardrail replacement. Bridge repairs include concrete spall, crack, delamination, and patch repairs in the bridge superstructure and deck. The scope also includes installing a waterproofing membrane on the bridge deck and constructing a temporary debris shield underneath the bridge. The bridge will be closed to public traffic for the duration of construction. PRINCIPAL WORK ITEMS: 15701-0000 Soil Erosion Control: LPSM 30202-2000 Roadway Aggregate, Method 2: 310 TONS 40301-0100 Asphalt Concrete Pavement, Type 1: 350 TONS 55901-0000 Membrane Waterproofing: 445 SQYD 56205-0000 Debris Shield: LPSM 57201-0000 Repair Concrete (Deep): 38 SQYD 57201-0000 Repair Concrete (Deep Bridge Deck): 80 SQYD 57201-0000 Repair Concrete (Full Depth Bridge Deck): 80 SQYD 60901-1000 Curb, Concrete, 12-Inch Depth: 520 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A, Steel Posts: 263 LNFT ANTICIPATED SCHEDULE: Advertisement: January 2027 Award: March 2027 Notice to proceed: April 2027 Contract completion: October 2027 Total duration for construction: 120 days ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000. | 69% | Market Research | 11/04/2026 |
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 | 65% | Solicitation | 11/17/2026 |
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6” electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule A: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 1.051 MILE 20301-1900 Removal of Pipe Culvert: 5 EACH 20401-0000 Roadway Excavation: 1,500 CU YD 30201-2000 Roadway Aggregate, Method 2: 2,500 CU YD 30302-1000 Ditch Reconditioning: 3,280 LN FT 40301-0100 Asphalt Concrete Pavement, Type 1: 2,500 TON 60103-0140 Concrete, Headwall for 24-Inch Pipe Culvert (L-Shaped): 3 EACH 60103-0160 Concrete, Headwall for 30-Inch Pipe Culvert: 1 EACH 60103-0280 Concrete, Headwall for 66-Inch Pipe Culvert (Includes Wingwalls): 1 EACH 60201-0800 24-Inch Pipe Culvert: 255 LN FT 60201-0900 30-Inch Pipe Culvert: 45 LN FT 60707-1200 Lining 66-Inch Pipe Culvert (HDPE Slipline): 110 LN FT 60707-1300 Lining 72-Inch Pipe Culvert (HDPE Slipline): 190 LN FT 63401-0300 Pavement Markings, Type B, Solid: 46,000 LN FT Option X: 15225-0000 Slope, Reference, and Clearing and Grubbing Control: 0.38 MILE 20420-0000 Embankment Construction: 200 CU YD 30201-2000 Roadway Aggregate, Method 2: 700 CU YD 40301-0100 Asphalt Concrete Pavement, Type 1: 650 TON 56603-0000 Reinforced Shotcrete: 180 SQ YD 60704-0000 Cleaning Culvert in Place: 7 EA 63401-0300 Pavement Markings, Type B, Solid: 8,500 LN FT Option Y: 63610-3410 Conduit, 6-Inch, HDPE (Schedule 40): 2,215 LN FT 63621-1000 Utility Box, Pullbox: 6 EA 63622-0000 Utility Trench: 2,215 LN FT ANTICIPATED SCHEDULE Advertisement: November 2026 Award: January 2027 NTP: April 2027 Construction: May 2027- October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000 A NON-MANDATORY PRE-BID SITE VISIT WILL BE HELD NOVEMBER 4TH, 2026 AT 10:00AM. PLEASE SEE ATTACHEMENTS FOR ADDITIONAL INFORMATION | 65% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
DTFH6816B00035
Archive Date
Feb 22, 2017