Notice ID: e0d4d009f5d74b97b627e0e7e1cd4e56Award NoticeAwarded
Big River Trap 31 CP Pilot Project
Awarded on June 17, 2026. Full description on SAM.gov.
Awarded tounder W912P926DA012 (source: SAM.gov award notice)• $817.1K
Overview
- Posted
- June 22, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST LOUIS.W07V ENDIST ST LOUIS
- Place of performance
- Please see Attachment 4 ? Pre-Bid Site Visit Map for project location
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jun 17, 2026
- Award amount (SAM.gov award notice)
- $817.1K
Identifiers
- Solicitation number
- W912P926R8917
- Notice ID
- e0d4d009f5d74b97b627e0e7e1cd4e56
- Award number (PIID)
- W912P926DA012
Description
Big River Trap 31 Amendment 0002 Adds Bond clauses and posts the Q and A recieved. Amendment 0001 attaches the Hold Harmless Agreement for Contractor Review. FOR CURRENT PL84-99 MATOC HOLDERS ONLY!!!!! Request for Task Order Proposal for Big River Trap 31 CP Pilot Project. Project will construct an off-channel sediment trap at River Mile 31 of the Big River to establishcontrolled deposition of targeted lead-impacted sediments in the immediate vicinity of known freshwater mussel beds.ALL QUESTIONS SHALL BE SUBMITTED VIA THE BIDDER INQUIRY PORTAL in ProjNet at http://www.projnet.org/projnet. Offerors should submit questions by 9:00AM CDT, Monday, May 11, 2026.The site visit for this requirement will be 9 a.m. on 07 May 2026. Individuals are to meet at the red circle depicted on Attachment 4 ? Pre-Bid Site Visit Map. Accordingly, offerors are urged and expected to inspect the site where the work will be performed. Following the site visit potential offerors are encouraged to submit any questions in accordance with the solicitation instructions.Your proposal due date is 22 May 2026 at 10:00 a.m. CDT.
Award Overview
Award Number
W912P926DA012
Award Amount (SAM.gov award notice)
$817.1K
Award Date
Jun 17, 2026
Awardee
Awardee UEI
YPVGKX353PK7
Awardee CAGE Code
98UH6
Awardee Address
7381 STAMM HOLLOW RD, Evansville, IL 62242, UNITED STATES
Delivery Order Number
W912P926FA127
Original Solicitation
Notice ID: e0d4d009f5d74b97b627e0e7e1cd4e56
Posted Date: Jun 22, 2026
Original Response Deadline: Not specified
Task Orders Under This IDV
Top 10 by total obligated
- $817.1KSigned Jun 16, 2026
- $817.1KSigned Jun 25, 2026
- $500Signed Nov 20, 2025
More From This Vendor
Top 5 most recent
- $817.1KSigned Jun 25, 2026
- $817.1KSigned Jun 16, 2026
- $500Signed Nov 20, 2025
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W912P926R8917piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Award NoticeCurrent
Big River Trap 31 CP Pilot Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Request for Task Order Proposal for Harlow Island Stage 1B The scope of this PWS is to construct Stage I of the Harlow Island HREP. The work in the base contract will involve the construction of embankments and excavations, as well as stripping operations. The contractor will utilize existing project access. The contractor will coordinate as necessary with Burlington Northern San Francisco (BNSF) Railroad for project access. The property is 100% federally owned by the project sponsor, the United States Fish and Wildlife Service.The U.S. Army Corps of Engineers, St. Louis District, is requesting a proposal for the Harlow Island Stage 1B Project. This requirement is being competed amongst the MVS Civil Works and Flood Recovery (PL 84-99) MATOC holders. | - | Awarded | Open |
Request for Task Order Proposal for Harlow Island Stage 1B The scope of this PWS is to construct Stage I of the Harlow Island HREP. The work in the base contract will involve the construction of embankments and excavations, as well as stripping operations. The contractor will utilize existing project access. The contractor will coordinate as necessary with Burlington Northern San Francisco (BNSF) Railroad for project access. The property is 100% federally owned by the project sponsor, the United States Fish and Wildlife Service.The U.S. Army Corps of Engineers, St. Louis District, is requesting a proposal for the Harlow Island Stage 1B Project. This requirement is being competed amongst the MVS Civil Works and Flood Recovery (PL 84-99) MATOC holders. | - | Solicitation | 07/23/2026 |
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing Request for Proposals No. W912DQ27RA004 for a total small-business set-aside Multiple Award Task Order Contract (MATOC) supporting the Missouri River Bank Stabilization and Navigation Project. The requirement includes the repair, modification, and construction of river-training structures, including dikes and revetments, through placement of quarry-run stone and excavation of notches. Work will be performed by floating plant along the Missouri River between River Miles 0-542. The scope of work includes, but is not limited to, the construction, modification, and repair of stone dikes and revetments; bank paving and hard points; revetment overlays; and excavation of notches. The work requires the capability of mobilizing, loading, and unloading barges from accessible quarries with graded stone along the Missouri River. Structures are located between the high banks of the Missouri River to include side channel chutes. All work to be performed will be completed by floating plant as no land access will be available. Stone is typically placed by way of track-hoe from a work barge. Contractor equipment shall be capable of accessing designated structures in water depths of four feet or greater.The Government anticipates awarding four (4) to five (5) firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contracts within the MATOC. The Government also anticipates awarding one concurrent seed task order within the MATOC pool. The MATOC will have a shared aggregate maximum capacity of $50,000,000 for all awards, consisting of a three-year base ordering period and two one-year option periods. The minimum guarantee is $2,500 for each awarded IDIQ contract.This acquisition is a total small-business set-aside under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The applicable small-business size standard is $45 million.The solicitation is anticipated to be issued on or about January 2027. The solicitation will establish the proposal due date and time; the Government anticipates allowing approximately 30 calendar days for proposal submission. A bid guarantee is required with the seed task order proposal in an amount equal to 20 percent of the proposed seed task order price or $3,000,000, whichever is less. The successful seed task order awardee will be required to furnish performance and payment bonds, each in the amount of 100 percent of the seed task order award amount, before issuance of the Notice to Proceed. Currently, a Pre-Solicitation Conference is not scheduled. If the Government decides to hold a conference, this announcement will be amended accordingly.The solicitation will use a best-value tradeoff source-selection process. The Government intends to award without discussions but reserves the right to conduct discussions if determined necessary. The solicitation will identify the official posting location and the authorized electronic proposal-submission method. Electronic proposals will be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. Offerors are responsible for establishing and maintaining the required PIEE access, including the Proposal Manager role, sufficiently in advance of the proposal due date.Notice is given that it has been determined a consolidation of contract requirements is necessary and justified for this action. The determination will be published with the solicitation.Offerors must maintain an active System for Award Management registration and current representations and certifications, as required by the solicitation and applicable regulations.Prospective offerors are responsible for monitoring the official posting location for amendments and other updates.Prospective offerors shall submit contracting and technical questions through ProjNet Bidder Inquiry. The solicitation will provide the Bidder Inquiry Key and establish the deadline for questions. The Government will address questions through formal solicitation procedures. | - | Pre-Solicitation | Open |
The bid abstract and bid opening attendance list is posted. The solicitation is amended with amendment 0002 to make changes to the specifications and extend the bid due date. The solicitation is amended to make changes to the specifications in Section 33 40 00 and update the wage rates. Also, the Bidder Inquiry Responses are provided. The U.S. Army Corps of Engineers, Kansas City District, is issuing a solicitation and awarding a single contract for construction services for levee repair at Corning and Holt 10 Levees, located in Holt County, Missouri. The Government intends to award a Firm-Fixed Price (FFP) contract for this project. This will be a 100% Small Business Set-Aside. A site visit is scheduled for this project. The scope of work covered by this contract consist of furnishing all equipment, labor, operators, supervision / site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction to potentially include, but not limited to earthwork operations, bringing in fill and borrow material from a pre-determined site, haul road development, clearing of debris as necessary, erosion repair, rutting repair, levee surfacing, various stone surfacing/placement, installation of stone armored protection, installation and rehabilitation of drainage structures and associated apertures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections. A site visit is planned for this solicitation. The estimated magnitude of this construction project is between $250,000 and $500,000. | - | Solicitation | 10/05/2026 |
Crains Island Stage 3. The work to be performed is to restore / enhance the environmental habitat at the Crains Island Habitat Restoration and Enhancement Project (HREP) in Randolph County, IL.Amendment 0002: See attached files for updated Bid Schedule/Specs, Site Visit sign in sheet, Questions and Answers, and new Bid Due Date/Bid Opening (14 July 2026. 10 AM / 14 July 2026 2:00 PM). | - | Awarded | Open |
Additional Details
Solicitation Number
W912P926R8917
Archive Date
Jun 22, 2027
Office Address
SAINT LOUIS, MO, 63103-2833