Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767)

Awarded on April 9, 2026. Full description on SAM.gov.

Awarded tounder 36C25226C0027 (source: SAM.gov award notice)• $4.0M

Overview

Posted
April 9, 2026
Notice type
Award Notice
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
252-NETWORK CONTRACT OFFICE 12 (36C252)
Place of performance
Oscar G Johnson VA Medical Center 325 East H Street, Iron Mountain, Michigan, 49801
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov
Award date
Apr 9, 2026
Award amount (SAM.gov award notice)
$4.0M

Identifiers

Solicitation number
36C25226B0003
Notice ID
c3c501c6e6d74c3ba218fe52fa138658
Award number (PIID)
36C25226C0027

Description

SOLICITATION 36C25226B0003 AMENDMENT A0002 March 17, 2026 Project: Upgrade Facility Generator Construction Project Number: 585-25-103 Location: Oscar G Johnson VAMC Hospital Amendment 0002 hereby incorporates the following clarifications/change(s) into the solicitation package. RFI Questions RFI Response - Upgrade Facility Generator Construction 36C25226B0003 585-25-103 Date CONTRACTOR QUESTION REFERENCE VA RESPONSE 2/16/2026 Clarification on the period of performance time length from the NTP Information on Bid Schedule is correct. (430 calendar days from NTP) 2/18/2026 After review with MJE chief engineer there is some concern using a Delta to Wye stepdown transformer as a step-up transformer. Using this configuration would create an un-grounded 13.8KV Delta source. This would appear to not be equipped with code-required monitoring. Would a Wye to Wye transformer be an acceptable alternate? This would allow the 13.8KV side of the transformer to be grounded at H0. These also are more commonly available for rental. Drawing EP101, Keynote 16, specifies 3 - #3/0 15kV MV cables, shielded with concentric neutrals to be used in addition to a #3 THHN EGC. The tape shields on the #3/0 cables provide a grounding path for bonding between equipment the Generator 13.8KV switchgear as well as the transformer. Fault current clears through the primary side (480V) system which would be the primary path for fault clearance from the generator. All tape shields and ground conductors from both primary and secondary sides will be bonded at the transformer ground and ultimately also bonded to the XO of the primary wye. A fault clears through the primary wye connected to the temp generator breaker. Keynote 21 requires a ¾ x 10 copper rod to be driven into the ground by the temporary transformer. The interior of the enclosure shall be bonded to this rod which would act as a redundant fault path. If a Wye-to-Wye transformer is more readily available, it is acceptable. Please note that the switchgear is configured in Delta, so there is no neutral bus in the switchgear, only a ground bus. The concentric neutrals and tape shields would then be bonded to the switchgear ground bus and transformer high side XO. 2/19/2026 In the solicitation there is no box checked under VAAR 852.219-75. Is this solicitation for General Construction or Special Trade Construction (or Services)? The major materials for this solicitation are specified, but their origin is unknown. Could the Contracting Officer please list the applicable excepted materials, or indicate None per FAR 52.225-9?  852.219-75 page 27 52.225-9 Page 19 Page 27 Inserted "X" Page 19 Inserted "None" See attachments 3/10/2026 In Part 2, it states that the Cummins equipment required for the controls upgrade includes, but is not limited to, a new Cummins Power Group Digital Master Control 8000 enclosure with associated hardware, Cummins DMC 8000 Version 3.3 system network controls software, Cummins DMC 8000 Version 3.3 generator controllers with cabinets, and Cummins Automatic Transfer Switch network communication cards. We intend to quote ComAp controls for both the generators and the DMC, so I want to confirm whether non Cummins controllers will be accepted as part of the bid. Lastly, to ensure an accurate proposal, we would like to perform a brief site visit to gather some additional information. Would it be possible to have a technician stop by on Monday in the late morning? The phrase "is not limited to" is included because there may be additional Cummins equipment required to complete the project than what is listed. It does not mean that equipment from additional manufacturers is authorized. No, additional site visits will be scheduled at this time. Bid Opening Time Changed: (Date remains unchanged) PROPOSAL DUE DATE / TIME: MARCH 26, AT 2:00 P.M. CST. Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476 ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.

Full description on SAM.gov

Award Overview

Award Number

36C25226C0027

Award Amount (SAM.gov award notice)

$4.0M

Award Date

Apr 9, 2026

Awardee

Awardee UEI

NH6RBGMBK3R9

Awardee CAGE Code

7G2X4

Awardee Address

MENOMINEE, MI 49858, MI

Original Solicitation

Notice ID: c3c501c6e6d74c3ba218fe52fa138658

Posted Date: Apr 9, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Donita Grace
Contract Specialist

Documents

Files (10)

  • S05 - Att 1_36C25226B0003_3 RFI Updates.pdf

    150 KBAdded in Solicitation version 9Posted
    Download
  • 36C25226B0003 0002.docx

    31 KBAdded in Solicitation version 9Posted
    Download
  • S06 - 36C25226B0003 A0001.docx

    121 KBAdded in Solicitation version 7Posted
    Download
  • S02 - Att5 JA 585-25-103 - Redacted.pdf

    577 KBAdded in Solicitation version 2Posted
    Download
  • S02 - Att4 Wage Rate MI20260117_1.2.26.pdf

    32 KBAdded in Solicitation version 2Posted
    Download
  • S02 - Att3 Final SOW - 585-25-103.docx

    31 KBAdded in Solicitation version 2Posted
    Download
  • S02 - Att2 Combined Bid Spec -585-25-103.pdf

    1.1 MBAdded in Solicitation version 2Posted
    Download
  • S02 - Att1 Combined Bid Drawings - 585-25-103.pdf

    2.3 MBAdded in Solicitation version 2Posted
    Download
  • 36C25226C0027.docx

    13 KBAdded in Award Notice version 5Posted
    Download
  • 36C25226B0003_3.docx

    84 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice e347f4817aa8455eaf235df113c474ce on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767)

    Notice c3c501c6e6d74c3ba218fe52fa138658 on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeNov 17, 2025

    Z1DA--Upgrade Facility Generator Controls Construction 585-25-103

    Notice 959a352cfa2d44e8be3deac5457e9341 on SAM.gov

  2. Market ResearchRelated noticeDec 3, 2025

    Z1DA--Upgrade Facility Generator Controls Construction 585-25-103

    Notice f90af8271886447d90341088ba31c9d4 on SAM.gov

  3. Market ResearchRelated noticeDec 12, 2025

    Z1DA--Upgrade Facility Generator Controls Construction 585-25-103

    Notice 1a09c00fabef444c8be8bf2f8410f720 on SAM.gov

  4. Market ResearchRelated noticeDec 12, 2025

    Z1DA--Upgrade Facility Generator Controls Construction 585-25-103

    Notice 11e9685933e7466ba721dd095b4f1c46 on SAM.gov

  5. Pre-SolicitationRelated noticeJan 21, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice 96857527d0514bfb96245a281c77ab66 on SAM.gov

  6. SolicitationRelated noticeFeb 6, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice fdc03cb8be8c42f28f7517e7d4c9d651 on SAM.gov

  7. SolicitationRelated noticeFeb 6, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice e06e44dcce1f4167b020c3035f9af217 on SAM.gov

  8. SolicitationRelated noticeFeb 18, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice a008c270800d4eb888341fdb3b5db84f on SAM.gov

  9. SolicitationRelated noticeFeb 18, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice 0cb86a83e0464a6284481c37c3f0312b on SAM.gov

  10. SolicitationRelated noticeFeb 19, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice 6ff726733b5e4b3fb95c0ada86be413e on SAM.gov

  11. SolicitationRelated noticeFeb 23, 2026

    Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

    Notice 58099708a5a54fcdae1c44ca6f021737 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004……..
-Solicitation12/01/2026
-AwardedOpen
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
-Solicitation09/09/2026
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
-Solicitation09/01/2026
Amendment 4 for subject solicitation. Amendment simply clarifying due date and time.
-Solicitation08/04/2026

Additional Details

Solicitation Number

36C25226B0003

Archive Date

Jun 8, 2026

Office Address