Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767)
Awarded on April 9, 2026. Full description on SAM.gov.
Overview
- Posted
- April 9, 2026
- Notice type
- Award Notice
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252)
- Place of performance
- Oscar G Johnson VA Medical Center 325 East H Street, Iron Mountain, Michigan, 49801
- Last updated
- Nov 1, 2026
- First published
- Last updated on SAM.gov
- Award date
- Apr 9, 2026
- Award amount (SAM.gov award notice)
- $4.0M
Identifiers
- Solicitation number
- 36C25226B0003
- Notice ID
- c3c501c6e6d74c3ba218fe52fa138658
- Award number (PIID)
- 36C25226C0027
Description
Award Overview
Award Number
36C25226C0027
Award Amount (SAM.gov award notice)
$4.0M
Award Date
Apr 9, 2026
Awardee
Awardee UEI
NH6RBGMBK3R9
Awardee CAGE Code
7G2X4
Awardee Address
MENOMINEE, MI 49858, MI
Original Solicitation
Notice ID: c3c501c6e6d74c3ba218fe52fa138658
Posted Date: Apr 9, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
S05 - Att 1_36C25226B0003_3 RFI Updates.pdf
150 KBAdded in Solicitation version 9Posted - Download
36C25226B0003 0002.docx
31 KBAdded in Solicitation version 9Posted - Download
S06 - 36C25226B0003 A0001.docx
121 KBAdded in Solicitation version 7Posted - Download
S02 - Att5 JA 585-25-103 - Redacted.pdf
577 KBAdded in Solicitation version 2Posted - Download
S02 - Att4 Wage Rate MI20260117_1.2.26.pdf
32 KBAdded in Solicitation version 2Posted - Download
S02 - Att3 Final SOW - 585-25-103.docx
31 KBAdded in Solicitation version 2Posted - Download
S02 - Att2 Combined Bid Spec -585-25-103.pdf
1.1 MBAdded in Solicitation version 2Posted - Download
S02 - Att1 Combined Bid Drawings - 585-25-103.pdf
2.3 MBAdded in Solicitation version 2Posted - Download
36C25226C0027.docx
13 KBAdded in Award Notice version 5Posted - Download
36C25226B0003_3.docx
84 KBAdded in Solicitation version 2Posted
Lifecycle
- 3Version 3SolicitationArchived
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767)
Other notices for this solicitation
- Market ResearchRelated noticeNov 17, 2025
Z1DA--Upgrade Facility Generator Controls Construction 585-25-103
- Market ResearchRelated noticeDec 3, 2025
Z1DA--Upgrade Facility Generator Controls Construction 585-25-103
- Market ResearchRelated noticeDec 12, 2025
Z1DA--Upgrade Facility Generator Controls Construction 585-25-103
- Market ResearchRelated noticeDec 12, 2025
Z1DA--Upgrade Facility Generator Controls Construction 585-25-103
- Pre-SolicitationRelated noticeJan 21, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 6, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 6, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 18, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 18, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 19, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
- SolicitationRelated noticeFeb 23, 2026
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004…….. | - | Solicitation | 12/01/2026 |
| - | Awarded | Open | |
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time. | - | Solicitation | 09/09/2026 |
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time. | - | Solicitation | 09/01/2026 |
Amendment 4 for subject solicitation. Amendment simply clarifying due date and time. | - | Solicitation | 08/04/2026 |
Additional Details
Solicitation Number
36C25226B0003
Archive Date
Jun 8, 2026
Office Address
MILWAUKEE, WI, 53214