Notice ID: e46835a516d7481b8fdd8a2189bb84c1Combined Synopsis/Solicitation

Remediation and Restoration Activities

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EST
Posted
November 5, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238910: Site Preparation Contractors
Agency
Department of TransportationOFFICE OF THE SECRETARY

Notice details

Office
6913G6 VOLPE NATL TRANS SYS CNTR
Place of performance
Matawan, New Jersey, 07747
PSC
F999: OTHER ENVIRONMENTAL SERVICES
Last updated
Nov 5, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
6913G627Q300002
Notice ID
e46835a516d7481b8fdd8a2189bb84c1

Description

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination.


The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°, -74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work.


Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg.

See SOW for greater details.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (8)

  • RFQ 6913G627Q300002 11-5-26.pdf

    199 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • TABLE OF CONTENTS Page.pdf

    92 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachments I-III.pdf

    451 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment IV - WD-2015-4335 SAM.gov.pdf

    68 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment V - Instructions.pdf

    161 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VI - QPI RCAG PASI final with attchmts_Reduced.pdf

    1.5 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VII - FAA Matawan_RIR-RAW_2025-07-02_reduced.pdf

    2.4 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Attachment VIII - Pricing.pdf

    79 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationCurrent

    Remediation and Restoration Activities

    Notice e46835a516d7481b8fdd8a2189bb84c1 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

6913G627Q300002

Archive Date

Dec 8, 2026

Office Address

CAMBRIDGE, MA, 02142