Air Compressors and Maintenance Plan
Archived on August 19, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM MDT
- Posted
- July 22, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 333912: Air and Gas Compressor Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE GLOBAL STRIKE COMMAND.FA9401 377 MSG PK
- Place of performance
- ROAD FORKS, New Mexico, 87117
- PSC
- 4310: COMPRESSORS AND VACUUM PUMPS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA9401-26-Q-0025
- Notice ID
- be82bd6fdd1045c7b4651cc81ccf66a3
Description
** Please see the attachment Vendor QA Consolidation and Appendix A - List of Currently Used Equipment for the answers to all questions submitted **
**This Solicitation has been amended please see attachment FA940126Q0025 - AMENDED for complete information.**
1. Response deadline date has changed from Monday, 13 July 2026 to Tuesday, 04 August 2026 at 1400 hours (MDT)
2. We have added a site visit, which is being held on 16 July 2026 at 1300 hours (MDT).
*See PWS for complete details*
This project will consist of the procurement, removal, disposal, installation, commissioning, and maintenance of two (2) Ingersoll Rand RS37i Air Compressors, one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator, and two (2) Ingersoll Rand Xe-70M controllers. Equivalent models are accepted; however, bids on equivalent models will need to include a brochure of all the technical specifications for review. Equivalent models will need to either have an integrated desiccant dryer or separate desiccant dryer that can handle the volume of two air compressors. The Contractor will be responsible for the complete installation of two (2) Ingersoll Rand RS37i Air Compressors and one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator.
The Contractor shall procure and provide a “turnkey” solution in accordance with the manufacturer’s installation requirements and standard commercial best practices for the following equipment:
Manufacture Model # Description Quantity
Ingersoll Rand RS30-37i/RS30I TAS Fixed Speed Rotary Compressor w/ Dryer 2
Ingersoll Rand PSG-30 Polysep PSG-30 Oil Water Separator 1
Equivalent models must meet the following specifications:
Description Required Specifications Quantity
Air Compressor 2
• 120 PSI each
• 170 CPM each
• Needs to have integrated air dryer
• Must be air-cooled
Oil Water Separator 1
• 390 CPM
• 12-gal absorption module volume
• 32-120 temperature operating range
In addition, the government requires a preventive (scheduled) and corrective (troubleshooting, repairs, and replacements) maintenance contract for all existing shop air compressor systems (See Appendixes in PWS for all currently used equipment), for the base year and four option years. The Contractor shall provide all management, labor, material, parts, equipment, transportation, certifications, and tools necessary to maintain, service, and calibrate the shop air compressors, air dryers and associated ancillary equipment.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (6)
- Download
Appendix A - List of Currently Used Equipment.pdf
150 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Vendors QA Consolidation.pdf
54 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
FA940126Q0025 - AMENDED.pdf
167 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment 1 - PWS REDACTED.pdf
552 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 2 - Wage Determination.pdf
74 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
FA940126Q0025 Final.pdf
666 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Air Compressors and Maintenance Plan
- 2Version 2Combined Synopsis/SolicitationArchived
Air Compressors and Maintenance Plan
- 3Version 3Combined Synopsis/SolicitationArchived
Air Compressors and Maintenance Plan
- 5Version 5Combined Synopsis/SolicitationArchivedCurrent
Air Compressors and Maintenance Plan
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
FA9401-26-Q-0025
Archive Date
Aug 19, 2026
Office Address
KIRTLAND AFB, NM, 87117-0001