GovChime
Notice ID: b6a37ff610a745ca8faf215eae16a0b1Award NoticeAwardedArchived

Z--Nicodemus National Historic Site Refinish Township Hall Flooring

Awarded on July 30, 2026. Full description on SAM.gov.

Awarded tounder 140P6326P0037 (source: SAM.gov award notice)• $24.5K

Overview

Posted
July 30, 2026
Notice type
Award Notice
NAICS
238330: Flooring Contractors
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
MWR NEKOTA(63000)
Place of performance
Nicodemus, Kansas, 67625
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Jul 30, 2026
Award amount (SAM.gov award notice)
$24.5K

Identifiers

Solicitation number
140P6326Q0020
Notice ID
b6a37ff610a745ca8faf215eae16a0b1
Award number (PIID)
140P6326P0037

Description

EO 14398 Nicodemus National Historic Site Refinish Township Hall Flooring

Full description on SAM.gov

Award Overview

Award Number

140P6326P0037

Award Amount (SAM.gov award notice)

$24.5K

Award Date

Jul 30, 2026

Awardee

Awardee UEI

CWBUYF4LUQX5

Awardee CAGE Code

8V4K2

Original Solicitation

Notice ID: b6a37ff610a745ca8faf215eae16a0b1

Posted Date: Jul 30, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

Files (8)

  • Sol_140P6326Q0020_Amd_0002.pdf

    202 KBAdded in Solicitation version 4Posted
    Download
  • Amd_0002_Atch_1_Questions-Answers_0002.pdf

    140 KBAdded in Solicitation version 4Posted
    Download
  • Sol_140P6326Q0020_Amd_0001.pdf

    203 KBAdded in Solicitation version 2Posted
    Download
  • Sol_140P6326Q0020.pdf

    170 KBAdded in Solicitation version 1Posted
    Download
  • Atch_2_DOL_Wage_Determination_KS20260044_5_18_26.pdf

    1.7 MBAdded in Solicitation version 1Posted
    Download
  • Atch_3_Price_Schedule.xlsx

    27 KBAdded in Solicitation version 1Posted
    Download
  • Atch_4_Experience_Questionnaire.xls

    32 KBAdded in Solicitation version 1Posted
    Download
  • Atch_1_SOW.pdf

    2.3 MBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Z--Nicodemus National Historic Site Refinish Township

    Notice e5bf4081e6954e4a9a85a99de10bef17 on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--Nicodemus National Historic Site Refinish Township Hall Flooring

    Notice b6a37ff610a745ca8faf215eae16a0b1 on SAM.gov

Other notices for this solicitation

  1. SolicitationRelated noticeJun 5, 2026

    Nicodemus National Historic Site Refinish Township

    Notice 74e91779026744f3a2a5b1b4588b2366 on SAM.gov

  2. SolicitationRelated noticeJun 10, 2026

    Z--Nicodemus National Historic Site Refinish Township

    Notice 840388eef9c94f57a4575cead0b55d65 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This Sources Sought Notice is for planning purposes only and shall not be considered as an invitation for bid, request for quotation, request for proposal, or as an obligation on the part of the Government to acquire any products or services. Your response to this Sources Sought Notice will be treated as information only. No entitlement to payment of direct or indirect costs or charges by the Government will arise because of contractor submission of responses to this announcement or the Government use of such information. This request does not constitute a solicitation for proposals or the authority to enter negotiations to award a contract. No funds have been authorized, appropriated, or received for this effort. The information provided may be used by the Department of Veterans Affairs in developing its acquisition approach, statement of work/statement of objectives and performance specifications. Interested parties are responsible for adequately marking proprietary or competition sensitive information contained in their response. The Government does not intend to award a contract based on this Sources Sought Notice or to otherwise pay for the information submitted in response to this Sources Sought Notice. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service-Disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), HubZone and other Small Businesses interested and capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following: (a) Company Name (b) Address (c) Point of Contact (d) Phone, Fax, and Email (e) UEI number (f) Cage Code (g) Tax ID Number (h) Please indicate the size status and representations of your business, such as but not limited to: Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran Owned Small Business (VOSB), Hubzone, Woman Owned Small Business (WOSB), Large Business, etc.)? (i) Is your company considered small under the NAICS code identified under this SSN/RFI? (j) Are you the manufacturer, distributor, or an equivalent solution to the items being referenced above? (k) If you are a large business, do you have any designated distributors? If so, please provide their company name, telephone, point of Contact and size status (if available). (l) If you re a small business and you are an authorized distributor/reseller for the items identified above or an equivalent solution, do you alter; assemble; modify; the items requested in any way? If you do, state how and what is altered; assembled; modified? (m) If you intend to subcontract any work on this contract, what portion of the total cost will be self-performed/will be performed by your organization? Please provide estimated detailed percentage breakdowns related to subcontracted work. (n) Does your company have an FSS contract with GSA or the NAC or are you a contract holder with NASA SEWP or any other federal contract? If so, please provide the contract number. (o) If you are an FSS GSA/NAC or NASA SEWP contract holder or other federal contract holder, are the items/solution you are providing information for available on your schedule/contract? (p) Please provide general pricing of your products/solution for market research purposes (q) Does your company have an FSS contract with GSA or the NAC or are you a contract holder with NASA SEWP or any other federal contract? If so, please provide the contract number. (r) Please provide general pricing of your products/solution for market research purposes (s) Must provide a capability statement that clearly addresses the organization s qualifications and ability to perform as a contractor for the work described below. Requirement: The VA Heartland Network 15 Contracting Office located at 3450 South 4th Street, Leavenworth, KS, 66048-5055 is seeking a potential qualified contractor to provide Floor Repair Restraint Rooms, St. Louis Jefferson Barracks VA Medical Center, 1 Jefferson Barracks Dr., St. Louis, MO 63125. Please see the Performance Work Statement for more specific details. The North American Industry Classification System Code (NAICS Code) is 238330 (Flooring Contractors), size standard $19.,. Based on this information, please indicate whether your company would be a Large or Small Business and have a socio-economic designation as a Small Business, VOSB or SDVOSB. Important Information: The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this source sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to an acquisition approach. The Government will in no way be bound to this information if any solicitation is issued. Currently a total set-aside for Service-Disabled Veteran Owned Small Business firms is anticipated based on the Veterans Administration requirement with Public Law 109-461, Section 8127 Veterans Benefit Act. However, if response by Service-Disabled Veteran Owned Small Business firms proves inadequate, an alternate set-aside or full and open may be used. Responses to this notice shall be submitted via email to Lisa A Buchanan at lisa.buchanan1@va.gov. Telephone responses will not be accepted. Responses must be received no later than Tuesday, November 17, 2026 at 3:00PM. If a solicitation is issued it shall be announced at a later date, and all interested parties must respond to that solicitation announcement separately from the responses to this sources sought. Responses to these sources sought notice are not a request to be added to a prospective bidders list or to receive a copy of the solicitation. PERFORMANCE WORK STATEMENT St. Louis VA Medical Center Jefferson Barracks GENERAL SCOPE: Background: The existing padded flooring in the Building 51 In-Patient Mental Health Ward Restraint RoomsSatisfies Guide §3 Element 1 requirement for "Background" as a distinct SOW component and Golden Rule 7.1 (assume the reader has no prior knowledge of what's being acquired). Add: MHEOCC inspections has deteriorated through normal wear and use, resulting in surface damage that poses patient safety and infection-control risks consistent with findings under MHEOCC inspections. [cite specific inspection, safety report, or design-guide deficiency, if applicable]. This flooring is subject to the VA Behavioral Health Design Guide, Facility Guidelines Institute (FGI), and Office of Mental Health (OMH) standards governing safety, durability, and hygiene in high-risk patient care environments. The purpose of this Service Contract is to obtain qualified vendor services to repair damaged flooring surface in Building 51 In-Patient Mental Health Ward Restraint Rooms. The purpose of this Service Contract is to obtain qualified vendor services to repair damaged flooring surface in building 51 In-patient Mental Health Ward Restraint Rooms. The padded flooring in the Restraint rooms has become worn or damaged, creating potential safety and infection control issues for patients and staff. The STLVAMC Facility Engineering team will remove damaged flooring and prepare the surface for the vendor to overlay with new padded, welded-seam flooring that meets safety, durability, and hygiene requirements for high-risk patient care environments. Flooring will be compliant with VA Behavioral Health Design Guide Standards, FGI (Facility Guidelines Institute) and OMH (Office of Mental Health) approved. Please see below for clarification of the scope and specifications. 2.0 Scope of Services/Specifications: The Contractor shall provide all labor, tools, equipment and materials needed to perform flooring overlay with welded seam resilient sheet flooring. Specifications below: Flooring must meet the specifications for behavioral health environments Provide continuous sheet vinyl with foam backing and heat-welded seams. Seamless, padded PVC or urethane surface with heat welded seams, such as, Gerflor Taraflex Sport M performance. Flooring will have 7mm maximum thickness (vinyl plus padding) 9MM padding Color will be Light Cherry or close match as selected by end users. 6350 No integral cove base (Facility Engineering team will install base with pick proof caulk) Tamper and pick resistance seams. Ensure transition points to other floor surfaces are tight ,and adhered properly and break under the door when closed. Infection control complaint, compatible with hospital cleaning protocols Flooring must be level and securely bonded to floor being overlaid All work must comply with relevant building codes, and VA regulations Building 51 In-Patient Mental Health Restraint Rooms needing flooring: Bldg 51 West Room 1W153: approximately 160 square foot Bldg 51 North 3 Room 1A122: approximately 120 square foot Bldg 51 North 2 Room 1A130: approximately 255 square foot Bldg 51 North 1 Room 1A155: approximately 90 square foot The Contractor's work shall be deemed acceptable only when it meets all of the following measurable criteriaConverts a vague "quality check" into measurable, inspectable standards per Guide §8.2 8.3 (performance requirements must be defined in measurable terms, tied to a quality assurance standard) and Checklist item "Have you described how you will measure the contractor's quality/performance?" . The COR shall inspect and document conformance against this table prior to final acceptance of each phase: Inspection Item Acceptable Standard Test/Inspection Method Rejection Criteria Seam integrity Fully heat-welded, continuous bead with no visible gaps or voids Visual inspection + manual pull test at 3 random points per seam Any gap, bubble, or separation visible or detectable under pull test Surface bonding/adhesion Flooring fully and uniformly bonded to substrate, no lifting, bubbling, or voids Visual inspection + tap test (hollow-sound check) across 100% of installed area Any area of delamination, bubbling, or hollow response under tap test Flatness/level Surface variance not to exceed manufacturer's published tolerance (not to exceed 1/8 inch over 10 feet, or per manufacturer spec, whichever is stricter) Straightedge/level check at minimum 3 points per room Variance exceeding stated tolerance at any tested point Transition points Tight, secure, and flush with adjoining floor surfaces; no trip hazard Visual and tactile inspection Any visible gap, height differential exceeding 1/16 inch, or movement under foot pressure Color/material match Matches specified Light Cherry 6350; material matches approved submittal Visual comparison to approved sample/submittal Visible color mismatch or use of unapproved substitute material Infection control compliance Surface is non-porous, seamless, and compatible with hospital-grade cleaning agents per ICRA protocol Visual inspection; manufacturer compliance documentation review Any visible seam porosity or failure to provide compliance documentation The Contractor shall correct, at no additional cost to the Government, any item failing to meet the above standards within five (5) business days of written notice from the COR. Final acceptance of each phase shall not occur until all items in this table are confirmed conforming and documented in writing by the COR. COR shall verify quality of completed work before final acceptance via periodic walk-through, flooring integrity check, seam integrity check as well as craftsmanship check. 3.0 SPECIAL REQUIREMENTS: All work shall be conducted according to manufacturer guidelines and industry best practices for behavioral health facilities Work shall be coordinated by VA Facility Engineering team members and performed with minimal disruption to staff/patients. Vendor/Contractor personnel shall comply with all VA safety, infection control (ICRA) and confidentiality protocols, as well as any special behavioral health requirements. Vendor/Contractor staff shall be escorted by FES personnel/COR Contractor shall remove existing overlay flooring in 1W153 and 1A155 Government-furnished services/property: FES/IHC shall remove overlay flooring in all rooms.1A122 and 1A130. Floor prep and cove-base shall be furnished/completed and installed by FES IHC Substrate Acceptance Prior to InstallationCloses the liability gap identified in the audit, without this clause, responsibility for flooring failure due to poor substrate prep is undefined. Satisfies Checklist item "Are the responsibilities of both VA and the contractor detailed adequately?" and Golden Rule 7.11 Before beginning overlay installation in any room, the Contractor shall inspect the FES/IHC-prepared subfloor for conformance with manufacturer installation requirements, including but not limited to surface cleanliness, moisture content, flatness, and cove-base installation quality. The Contractor shall document this inspection in writing (photographs and a brief inspection note are sufficient) and submit it to the COR prior to commencing work. If the Contractor identifies any non-conforming subfloor condition, the Contractor shall notify the COR in writing before beginning installation and shall not proceed with overlay work in the affected area until the condition is corrected and re-inspected. The Government shall be responsible for correcting subfloor deficiencies identified at this stage. If the Contractor proceeds with installation without providing written notice of a non-conforming condition, the Contractor assumes responsibility for any resulting flooring failure attributable to that condition, and corrective work shall be performed at no additional cost to the Government. 4.0 Period of Performance: Period of Performance is based on the phased construction schedule of the Facility Engineering In-Construction Teams renovation of each ward. These are estimated phasing dates that the vendor would need to be in to overlay the flooring in the restraint rooms. Estimated dates for Vendor floor overlay (subject to adjustment per paragraph 4.1 belowAddresses the audit's flagged risk that the contractor's schedule depends entirely on a third-party construction timeline with no defined notice period, duration estimate, or adjustment mechanism. Aligns with Guide §1.6.6 ("will the contractor and VA be able to negotiate a reasonable price, implies a fair mechanism for schedule-driven cost impacts) and Checklist item "Are completion dates for key tasks identified? Do time frames specify calendar days or work days?" (Note: the "[X] business days" placeholder should be filled in based on your facility engineering team's estimate; recommend basing it on square footage and manufacturer-stated cure/dry times.) ): Phase 1: North 3 room 1A122 December 15, 2026 Phase 2: North 1 room 1A155 February 2, 2027 Phase 3: North 2 room 1A130 March 29, 2027 Phase 4: West room 1W153 May 31, 2027 4.1 Notice, Mobilization, and Schedule Adjustment The COR shall provide the Contractor written notice of facility readiness for each phase no fewer than fourteen (10) (14) calendar days prior to the estimated start date above. The Contractor shall mobilize and begin overlay work within five (5) business days of the facility-ready notice. Each phase of overlay work is estimated to require no more than 3 [X] business days to complete per room, based on square footage listed in Section 2.0, excluding delays caused by Government-furnished prep work or facility access restrictions. The dates above are estimates tied to the Facility Engineering In-Construction Team's renovation schedule and are subject to change based on that schedule. If a phase start date shifts by more than fifteen (15) calendar days from the estimate above, the COR shall notify the Contractor in writing as soon as practicable. Schedule shifts of this nature shall not constitute a change requiring equitable adjustment unless they result in demonstrable additional cost to the Contractor (e.g., remobilization, material storage, or crew standby costs), in which case the Contractor may submit a request for equitable adjustment in accordance with the Changes clause of the contract. Estimated dates for Vendor floor overlay: Phase 1: North 3 room 1A122 December 15, 2026 Phase 2: North 1 room 1A155 February 2, 2027 Phase 3: North 2 room 1A130 March 29, 2027 Phase 4: West room 1W153 May 31, 2027 5.0 Deliverables The Contractor shall submit the following deliverables to the COR within five (5) business days of completionConverts non-mandatory "will provide" language to mandatory "shall," per Golden Rule 7.9, and ties each deliverable to a specific due date, per Checklist item "Have you identified what interim and final reports/deliverables are required?" of each phase, unless otherwise noted: Deliverable Due Date Written completion notice for the phase Within 2 business days of completing overlay work in that room Manufacturer warranty documentation Within 5 business days of phase completion Material certifications (confirming compliance with Section 2.0 specifications) Within 5 business days of phase completion Pre-installation substrate inspection documentation (per Section 3.1) Prior to commencing installation for that phase Final walkthrough sign-off, countersigned by COR At final acceptance of each phase, per Section 2.1 Final payment for each phase is contingent upon COR receipt and acceptance of all deliverables listed above. 5.0 Deliverables at end of each phase: Contractor will provide any manufacturer warranty documentation Contractor will provide material certifications Contractor will provide completion notice to COR Delivery Location: More detailed delivery/service information will be provided upon contract award. Jefferson Barracks VA Medical Center Bldg 57 Warehouse 1 Jefferson Barracks Drive St. Louis, MO 63125 7.0 COR/ POC at Location All questions concerning the scope and requirements of the VA Medical Center, shall be directed to the COR (see below): COR: Alternate COR: Jefferson Barracks Jefferson Barracks Todd Morgan Jeremy Hauck todd.morgan3@va.gov Jeremy.hauck@va.gov Tel: 314-728-2825 Tel: 314-630-9852 The In-House Construction Supervisor will be the contractors contact at Jefferson Barracks. The POC will assist and direct the contractor when scheduling walk throughs and all questions concerning coordination of training and commissioning of door systems.
-Market Research11/17/2026
MT BOZEMAN FTC CARPET REPLACEMENT (CONFERENCE ROOM) Amendment 0001
-Solicitation11/13/2026
EO 14398 - this requirement is for construction services for MT-BOWDOIN NWR-HQ OFFICE FLOORING REPLACEMENT
-AwardedOpen
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes only solicitation. Offers are being requested and separate written solicitation will not be issued. Solicitation number 12445127B0004 is issued as an Invitation For Bid (IFB) for Ashe Nursery Floor Repair/Replacement at Wiggins, MS National Forest Service. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238330 The small business size standard is $19 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a bid which will be considered by the agency. Submit offer by email to Cynthia.granderson@usda.gov with the notice ID in the subject line so that it is delivered into this inbox by the due date and time. Emails should contain attachments in Microsoft Word, Excel, or Adobe PDF format. Be aware that large attachments may increase the time required to deliver an email. It is the offerors responsibility to confirm receipt of the offer from Contract Specialist, Cynthia Granderson. ***************Amendment 0001 is attached********************* ***************Amendment 00002 and the Questions and Answers have been added.******************
-Combined Synopsis11/23/2026
Questions and Answers (84) Solicitation 36C24526Q0637 Set-aside status. The Amendment #3 notice on SAM.gov shows the Original Set Aside field as blank. The SF 1449 (Block 10) and VAAR 852.219-73 in the solicitation reflect a total set-aside for certified SDVOSBs. Please confirm whether this acquisition remains a 100% SDVOSB set-aside after Amendment #3. Correct this BPA/RFQ remains a 100% SDVOSB set-aside Evaluation basis. For the LPTA evaluation, will the Government compare total price for the base year only, or the total of the base year plus all four option years? Will option-year pricing be evaluated? total of the base year plus all four option years Quantities by site. Are the Section B.10 quantities the combined total for Baltimore VAMC, Loch Raven CBOC, and Perry Point VAMC? Please provide the breakdown by site, building, floor and flooring type, and confirm whether each quantity is an annual estimate for each contract year. This is an annual estimate for all sites. Line item reconciliation. Several lines appear not to align, and we would like to price them correctly: Tarkett Sheet Vinyl material is listed at 3,000 SY (27,000 SF), while Installation of Sheet Vinyl is listed at 9,000 SF. Which quantity is correct? SF should be SY. The SY is correct Is the 2,000 SY Tarkett Adapt (Woodlot Holly Oak) material line the material for the 2,000 SY Installation of Carpet Tile line? The carpet tile should be a separate line item. General Demolition, Floor Leveling and Smoothing and Furniture Lift (occupied spaces) are each listed at 30,778 SY. Does this quantity cover the combined area of the LVT and sheet vinyl installations? What is the Government's expectation for demolition and leveling on the Epoxy Flooring (15,000 SF) and Carpet Tile areas? Yes--This combines both areas. The expectation for epoxy flooring installation will not differ from LVT. The recommended application/method is to be specified by the contractor as the SME (Subject matter expert). Materials and selections. Please confirm that the contractor furnishes all materials listed in B.10. Colors and styles are shown as TBD. When will selections be provided, and should offerors price a stated base or average cost? Will substitutions of equivalent products be considered? There are no substitutions Existing floor condition. Has asbestos or lead testing been completed on the existing flooring and adhesives at all three sites? If material is found, who is responsible for abatement and for the related schedule impact? Are moisture and alkalinity test results available? Asbestos and lead testing is completed at all sites. VA ensures the proper personnel are in place for abatement. BPA terms, schedule and labor Order limits. Section B.9 leaves the per-order limit and the ceiling amount blank. Please provide both, any minimum guarantee, the expected number and typical size of orders per year, and the typical lead time between an order and the start of work. The Government estimates, but does not guarantee, that individual BPA Orders placed against this Agreement may reach $1,500,000.00/per Order. This Order Limit may be increased by mutual agreement of the parties as necessary, in whole or part. The authorized Ceiling Limit of the Agreement is set at $6,000,000.00 over the period covered by the Agreement; this ceiling is also not a guarantee. The Ceiling Limit may also be raised in association with order Limit increases or other conditions which, by mutual agreement of the parties, maybe considered necessary. Authorization for individual Task Orders above the stated Task Order and/or Ceiling Limits must be coordinated through the Contracting Officer before larger valued orders can be issued and prior to commencement of work. All unauthorized work, regardless of amount, will be processed through the ratification process. Period of performance. Section B.10 shows a base period of 09-01-2026 through 08-31-2027, and B.2 shows the BPA dates as TBD. Please confirm the revised base and option period dates, given the November 18 quote date. The Installation of Sheet Vinyl line shows a POP end date of 08-16-2027 while other lines show 08-31-2027. Please confirm which date applies. Time frame of contract award Base Year December 1, 2026 to November 30, 2027 plus 4 option renewal years Wage determination. The attached wage determination is dated 7-22-2026 and is titled Baltimore. Does it apply to all three sites, including Perry Point (Cecil County)? Please confirm whether it is a Service Contract Labor Standards or a Davis-Bacon determination. Wage Determination for Baltimore and Cecil County are attached Service Contract Labor Standards Working in occupied facilities. Please describe the requirements for working hours, after-hours and weekend work, infection control (ICRA) and phasing, badging and escorts, material staging and storage areas, and loading and elevator access at each site. Who moves furniture and equipment that is not covered by the Furniture Lift line? The work hours are reflected in the RFQ. The VA observes all national holidays. After work hours are on a case by case and determined by the needs of the service. CLINs x007 "Epoxy Flooring; Color TBD" (B.10): is there a required epoxy system type (e.g., self-leveling, broadcast/slurry, mortar, or flake), minimum thickness, and performance criteria? This will be determined prior to the project of any installations-as epoxy will not be a regular material used. For epoxy areas, who is responsible for concrete moisture/RH and pH testing (ASTM F2170 / F1869)? If readings exceed the system's limits, is moisture mitigation priced under CLIN x009 or handled by task-order modification? handled by task-order modification VAAR 852.219-75 (pp. 55-56) has no box checked. Which limitation on subcontracting applies: services (50%) or special trade construction (75%)? Please confirm that the cost of materials is excluded. Also, will 852.219-73(e) be measured by base/option period or per order? Services (50%) 852.219-73(e) will be measured by base/option period. 14. Does a Buy American requirement (FAR 52.225-1 or 52.225-9) apply to materials? The SF1449 says 52.212-5 is attached, but its text isn't in the posted RFQ. 52.225-1 or 52.225-9 is not listed on the RFQ 52.212-5 is not checked on the SF1449 therefore text would not be posted 15. E.3 (p.61) says award will be LPTA, but E.8 (p.65) says best value with technical, past performance, and price. Which governs? Also, what are the per-order limit and BPA ceiling in B.9, which are left blank (p.8)? Refer to question #7 Order Limits 16. Carpet tile. Please provide the manufacturer, collection and product name, style number, color name and number, tile dimensions, fiber and construction, backing, installation pattern, and approved adhesive. Please confirm whether carpet material is contractor-furnished and identify the applicable material supply line. Carpet tile Spec: Tarkett Carpet Tile Hidden Arbor and Sweater Knit 24x24 color TBD 17. LVT. Please provide the complete specification for the listed Tarkett Contour Series 6 by 48 inch LVT, including exact collection and product number, color name and number, overall thickness, wear-layer thickness, backing, finish, installation method, and approved adhesive. Please clarify how the separately listed Tarkett Adapt, Woodlot Holly Oak relates to this scope. This will be determined prior to installation. 18. Sheet vinyl. Please provide the manufacturer, collection and product name, product number, color name and number, homogeneous or heterogeneous construction, thickness, backing, roll width, finish, and approved adhesive. Please include the compatible weld rod, heat-welding requirements, flash-cove height, cove former, cap, and corner details. Please provide product data sheets and identify any different product or color selections by facility or area. Sheet vinyl spec: Tarkett IQ Optima Sheet Goods 19. Please provide the required wall-base and transition specifications, including manufacturer, product, material, dimensions, profile, and color or finish. Please identify the required transitions between new flooring, existing finishes, and different flooring types. Contractor will determine optimal wall transitions based on the project requirement, as the SME (subject matter expert). 21. During the walkthroughs, we understood that all furniture moving would be performed in-house by the VA. Please confirm that the VA will clear furniture, contents, and equipment before work begins and return them after the required curing period, including any necessary disconnects and reconnects. Please clarify whether Item 0012, Furniture Lift, remains applicable. 22. Please confirm that LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation and required curing, rather than requiring piecemeal installation around furniture. LVT and sheet-vinyl work areas will be fully cleared and remain clear through installation 23. Please confirm whether the VA will provide dumpsters and pay disposal charges at each facility. Please identify the designated disposal locations and confirm whether the contractor is responsible for transporting demolition debris to onsite containers or for offsite hauling and disposal as well. The VA has dumpsters for disposal at each site. 24. Please confirm whether temporary dust partitions, negative-air equipment, and associated monitoring will be provided by the VA or contractor. Please provide the required barrier-system specifications and applicable infection-control requirements, including responsibility for setup, maintenance, relocation, removal, and inspection. Contractor is responsible for providing all ICRA/PICRA materials. To include materials required for wall barriers when required (Level 3 or 4). Contractors are expected to provide materials and construct the wall barriers required. Negative air pressure machine will be provided by the VA if needed. 25. Please identify the VA representative responsible for coordinating room availability, occupant relocation, access, and infection-control approvals. Please confirm whether each released area will remain continuously available through demolition, preparation, installation, and required curing. Please identify any daily reopening requirements and who authorizes reopening. The COR or Interior Designer will provide all necessary coordination for all projects. Contractor is not responsible for the opening of any room. 26. Please reconcile the listed 7:00 a.m. and 7:30 a.m. start times and confirm normal working hours. Please identify any locations or activities that must be performed during evenings, nights, weekends, or holidays. Any work after hours will be coordinated prior to any installations. This will be determined by the needs of the applicable service. 27. Reference: B.11 Scope, p. 26; B.5(c), p. 6. The SOW requires a project manager or project designer and an installation foreman onsite. For each task order, please identify the required supervisory positions, minimum qualifications, approval submittals, and hours of physical presence. Must a superintendent or project manager be a direct employee of the prime, and must that person remain onsite whenever subcontractors work? Each task order will require a designer or project manager to monitor progress and ensure standards are in place. They will be a minimum of COR Level 1 certified. They are required to be onsite at time of the installation. There is no physical amount of time for this requirement, as each project varies. A qualified installation foreman may of course also be present but the VA will require a designer/COR level 1 employee to monitor project. No-- Where projects possibly run concurrently, each project will have it s own designer/project manager. 28. Reference: B.11 Safety and Security Precautions and Personnel Qualifications, p. 28; B.6(a), p. 6. Please identify whether each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative beyond the onsite personnel identified on page 26. Specify prime-employment requirements, certifications, experience, full-time coverage, and whether one qualified person may combine these roles with superintendent or foreman duties. Each task order will require it s own safety personnel, each task order requires a separate Site Safety and Health Officer, Quality Control Manager, or other designated safety/QC representative based on the needs of the project. Each project may have it s own requirements (i.e patient care areas etc.) 29. Identify the applicable safety/QC specifications, any EM 385-1-1 requirements and edition, required plans and daily reports, and whether staffing varies with task-order size, location, work shift, or hazard level. Contractors are expected to comply with OSHA standards. No-the Interior Design staff does not vary based on task orders. 30. Reference: B.11 Objective and Scope, pp. 25-26. Before pricing and issuance of each task order, who will prepare and approve the Infection Control Risk Assessment (ICRA), any Preconstruction Risk Assessment (PCRA), and the infection-control permit: VA Infection Prevention, the COR, the contractor, or another party? Please provide the applicable forms, assessment matrix, approving officials, and review time. Confirm that the required class, work-area limits, patient risk group, and controls will be identified in the task-order solicitation before its price and schedule are agreed, including orders at Baltimore, Loch Raven, and Perry Point Interior Design staff will prepare the ICRA & PCRA. ID will coordinate with Infection control for approval of the ICRA & PCRA prior to the start of any project. All ICRA/PCRA requirements are expected to be performed by the contractor. Contractor will be expected to provide necessary materials and the construction of any wall barriers required by ICRA/PCRA. 31. Reference: Site-visit discussion reported by J&G; B.11 Scope, p. 26; Unpacking/Uncrating, p. 27. Our understanding from the site visit is that the Government will remove all furniture before the flooring contractor begins each task order. Please confirm this applies to every order at all three campuses and that the flooring contractor is not required to lift, move, disassemble, store, protect in storage, or reinstall furniture. Clarify responsibility for workstations, beds, file cabinets, appliances, medical equipment, contents, and associated IT/electrical/plumbing disconnections and reconnections. Interior Design will remove all furniture prior to any installation. However, there may be an instant where some furniture may need to be moved/prior. Contractor will not be responsible for the removal of any medical equipment. Equipment or medical items will be removed by VA personnel/Biomed. 32. Confirm that the Government will deliver cleared work areas and keep them clear through installation and required curing and identify the procedure if an area is not ready as scheduled. ID will ensure areas are cleared and remain clear through installation. 33. Reference: B.10, CLINs 0008 and 0012 and corresponding option CLINs, pp. 10-23; E.3, pp. 61-62.CLIN 0012 includes 30,778 SY of Furniture Lift in occupied spaces, repeated in CLINs 1012, 2012,3012, and 4012. This appears inconsistent with the site-visit direction that the Government will remove furniture. Will these CLINs be deleted from the schedule and evaluated price? If retained, define the exact exceptional scope and when it may be ordered, and issue uniform instructions on whether bidders must quote a rate, enter zero, or use another designation. Please confirm that pricing these lines does not place furniture moving in the flooring installation rates or authorize it without an applicable order. ID will ensure furniture is removed from the space prior to installation. However, if there is an instance where furniture must be removed by the contractor-it will be priced accordingly. 34. Reference: B.11 Scope, p. 26; Debris, p. 27; B.10, CLIN 0009 and option equivalents. The SOW assigns removal and disposal to the contractor but directs debris to VA-provided dumpsters and a scrap cage. For each campus, confirm whether the Government provides containers, hauling, and final disposal at no charge for all nonhazardous carpet, carpet tile, pad, LVT/VCT, sheet flooring, epoxy debris, cove base, adhesive/mastic scrapings, underlayment, and floor-preparation waste. Identify prohibited materials, volume or weight limits, and any offsite disposal the contractor must price. Please state whether disposal labor is paid through the demolition CLIN or installation rates, so it is included once, and define payment for required contractor hauling and tipping fees. The VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard. 35. Reference: B.11 Debris, p. 27; Safety and Security Precautions, p. 28. Please identify the approved debris routes, loading points, dumpster/scrap-cage locations, and cardboard recycling locations at each campus. Specify covered or sealed carts, bagging, elevator restrictions, daily removal, cleanup, and container exchange requirements. The VA provides disposal by means of dumpsters and scrap cage. There are disposal area at all sites. Perry Point has a metal scrap yard. 36. Are carpet take-back, flooring recycling, minimum diversion percentages, waste plans, weight tickets, or disposal receipts required? No, they are not required 37. Identify responsibility for overflow or un37available VA containers and any required contractor roll-off permits or containment. Where hazardous or contaminated waste is expressly included in an order, provide separate segregation, manifest, transporter, disposal-facility, and generator-signature responsibilities; confirm such waste may not enter the ordinary VA dumpsters. There are no hazardous materials areas specified for flooring installations. 38. Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field Reference: B.6(a), p. 6; B.11 Scope, p. 26; Equipment and Work Areas, p. 28. For each campus and task order, please identify required contractor site facilities, including a field office or trailer, superintendent/QC workspace, meeting area, storage container, portable toilets, handwashing facilities, and temporary lighting or ventilation. No. The VA will not provide storage containers, portable toilets, and temporary lighting or ventilation. Handwashing facilities are located in the restrooms in all facilities, all sites, all campuses. No temporary facilities will be provided. 39. Reference: B.11 Scope, p. 26; Equipment and Tools and Work Areas, p. 28; Installation, p. 29. The SOW requires contractor storage, directs installation from shipments and warehouse stock, and requires removal of tools when the contractor leaves. Please identify available secure, conditioned storage and acclimation areas at each campus, including space for flooring, adhesives, and hazardous products. May approved tools, containment equipment, and materials remain secured onsite overnight or between phases? There will be no storage provided for contractors. 40. If daily removal is required, confirm the limits and available loading access. Identify responsibility for material receipt, inventory, room tagging, double handling, damaged Government stock, and maintaining manufacturer-required temperature and humidity during storage, acclimation, installation, and cure. Storage for materials will not be provided-other than the immediate area within the project area. This will be included in the scope of the project. 41. Reference: B.11, pp. 25-30; Baltimore floor plans and campus visitor maps; Amendment #3 site-visit notice. The furnished maps identify visitor services and campus locations rather than dimensioned flooring work limits. Before each task-order quote, will the Government provide marked plans identifying buildings, rooms, areas, existing and new flooring, demolition limits, and phasing? Yes prior to the start of any project, the VA/COR will provide building location, room information and floor plans with applicable dimensions to reference. 42. Confirm field measurement access before pricing. Identify contractor entrances, loading docks, freight elevators and reservations, floor-load limits, haul distances, escort requirements, and delivery/parking arrangements at all three campuses. Yes measurements will be provided to the contractor prior to the start of each project. 43. Clarify the Loch Raven buildings covered by the BPA, including the Alameda clinic versus the broader Loch Raven campus, and any access restrictions caused by ongoing construction. All buildings located on the Loch Raven campus are included in the BPA. Ongoing construction will be assessed for access, determined by the current activities. 44. Reference: B.11 Scope, p. 26; B.10, pp. 9-24. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and 120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Correct the figure should reflect 800,000 SY instead of SF. This a rough estimate, of the exact amount of flooring that needs changed it will change over time. 45. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping supply-only quantities, and confirm the quantities controlling price evaluation and ordering. Reference: B.11 Scope, p. 26; B.10, pp. 9-24. The 3.5 total is an educated estimate. As we will now know exactly how much flooring we will utilize each year. 46. The SOW cites 800,000 SF of unimproved flooring, 66% replacement totaling 480,600 SF, and120,150 SF per year over a base plus four options. These figures do not reconcile: 66% of 800,000 is 528,000 SF, and five years at 120,150 SF is 600,750 SF. Separately, the annual scheduled flooring product/system quantities total 310,000 SF if CLINs 0001, 0003, 0006, and 0007 are distinct. Please issue corrected annual and total estimated quantities by product and campus, identify any overlapping or supply-only quantities and confirm the quantities controlling price evaluation and ordering. The total 3.5 is over the base plus 4 years. It is an estimate of 700k for each year. As we do not know exactly how much we will use each year funds or materials. 47. Reference: B.10, CLINs 0003 and 0013 and corresponding option CLINs, pp. 9-23. Sheet-vinyl material is listed at 3,000 SF, equivalent to 27,000 SF, while sheet-vinyl installation is listed at 9,000 SF in each year. Please confirm whether material quantity should be 1,000 SY, and the installation quantity should be 27,000 SF. Correct-the material quantity should be 1,000 SY, installation quantity should be 27,000 SF 48. Reference: B.10, CLIN 0009 and option equivalents, pp. 10-23; B.11 Scope, p. 26. CLIN 0009 includes 30,778 SY, equivalent to 277,002 SF, for General Demolition, Floor Leveling and Smoothing. Please identify the flooring types, number of existing layers, adhesive removal method, and substrate conditions included in this rate. Is it payable only where demolition is ordered,separately from installation, including Government-furnished material installations? Each flooring type may be different. Most areas are being replaced with carpet/tiles The spaces can include and are not limited to cove-base removal, bonded epoxy removal, mechanical grinding, and underlayment removal are included or separately priced. Underlayment are line items and priced within the task order. 49. Reference: B.10, CLINs 0001-0015 and option equivalents, pp. 9-24; B.11 Scope, p. 26. Please provide a CLIN inclusion matrix defining material-only, labor-only, and furnish-and-install items. In particular, identify the material paired with carpet installation 0008; confirm the relationship of LVT 0006 to installation 0011 and sheet vinyl 0003 to installation 0013; and define whether epoxy 0007 is a complete installed system. Identify where freight, adhesive, fasteners, demolition/disposal, skim coat, protection, transitions, supervision, and final cleaning belong. The SOW says pricing includes demolition and preparation, while CLIN 0009 prices them separately; please establish a consistent method that avoids either duplication or unpaid scope. Each task order will price materials required prior to the installation. This will be determined by the scope each project. 50. Reference: B.6, pp. 6-7; B.9, p. 8; B.10, pp. 9-24; B.11 Ordering Procedures, p. 27. Orders may vary from small to large, but the schedule has no separate mobilization, supervision, ICRA, temporary-facility, testing, or hazardous-material line items. Each project has its own needs and is specific to requirements and will be priced accordingly i.e ICRA requirements. The VA will not provide any temporary facility or storage. 51. Please identify any minimum task order size or charge and the expected order-size range and frequency. No--there is no minimum task order size. Reference: B.10, pp. 9-24; B.11 Ordering Procedures and Performance Monitoring, pp. 27-29.Please define the measurement and payment basis for each unit. Are flooring quantities net installed area, gross room area, or purchased material including cutting waste, pattern match, attic stock, and full-carton/roll rounding? 52. It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals. 53. Reference: B.10, CLINs 0001, 0003, 0006, 0008 and 0011, pp. 9-11; B.11 Scope, p. 26. Please provide complete specifications and current product identifiers for Tarkett Adapt/Woodlot Holly Oak, sheet vinyl, and Contour 6-by-48-inch LVT. Confirm the product category paired with carpet installation and whether VCT, although named in installation CLIN 0011, is Governmentfurnished or requires another supply item. Specify thickness, wear layer/backing, dimensions, performance and fire/smoke criteria, slip resistance, chemical resistance, approved adhesives, colors,and required installer qualifications. Are named products mandatory or are approved equals permitted? All Tarkett materials and specs have been provided. There are no substitutions for Tarkett materials. 54. Reference: B.10, CLIN 0007 and option equivalents, pp. 10-22; B.11 Scope, p. 26. For the 15,000 SF annual epoxy item, please identify the required system, manufacturer or performance basis, total thickness, primer, body coats, aggregate, topcoat, finish, and slip/chemicalresistance criteria. The epoxy will be used seldom-therefore it will be specified/determined upon each task order. When used, it will include removal, repairs and all necessary actions to install. 55. Reference: B.10, CLINs 0002, 0004, 0005 and option equivalents, pp. 9-23. Please confirm that one CO for each adhesive means one complete four-gallon pail, and define one EA of weld rod by diameter and length per spool. Verify the annual quantities of 18 C-EX pails, 195 Roll Smart pails, and 15 weld-rod units against the corrected product quantities and manufacturer coverage, including which adhesive serves each flooring product and where LVT adhesive is priced. Are these quantities fixed evaluation estimates, actual consumable quantities, or allowances? It is understood and agreed that the BPA holder shall provide Fixed-Price proposals when requested by the Contracting Officer (CO). The contractor's proposal shall be priced using labor rates and labor categories here in provided. The CO will issue Fixed Priced Orders upon completion of negotiations of contractor proposals. 56. Identify whether residual adhesive/rod remains Government property and how additional manufacturer-required consumption is authorized and paid. Any unused materials will be government property. Any unusable material may be disposed of. 57. transitions without a separate CLIN. For 1,600 FT of heat welding and 50 FT of Flash Cove and Corners, define seam requirements, cove height, cove former, cap strip, and inside/outside corner details. Should corners be measured individually rather than by FT, and are weld rod and flash-cove accessories furnished under these rates or other CLINs? Measurements and methods are to be determined by the contractor for efficiency of materials and labor. 58. Reference: B.11 Scope, p. 26; B.10, CLIN 0009 and option equivalents. Please define the quantitative limits of minor preparation/skim coat included in the rates, including maximum depth, average thickness, coverage percentage, flatness tolerance, and required adhesiveresidue removal. The VA cannot determine such rare instances pre-maturely. 59. Distinguish routine patching from self-leveling underlayment, deep fills, failed substrate removal, structural repairs, crack repair, joint treatment, and replacement of deteriorated wood or gypsum underlayment. Measurements and methods are to be determined by the contractor for efficiency of materials and labor. 60. Will each task order identify known repairs before pricing? Yes, each task order will identify known repairs before pricing 61. Establish separate measurable items or another approved pricing mechanism for concealed deterioration or preparation exceeding the defined limits after demolition. This will be determined before installation and will be included in pricing. 62. Reference: B.11 Objective and Scope, pp. 25-26; Installation, p. 29. Who performs and pays for substrate moisture, relative-humidity, pH, adhesion, and other manufacturer-required testing on each task order, and what standards, frequency, and acceptance limits apply? If spaces are identified with moisture issues, the VA will identify these instances prior if needed and make determining factors to rectify prior to installation. 63. Reference: B.11 Scope, p. 26; Installation, p. 29; C.1(b), p. 31. Please identify required product data, room layouts, samples, mockups, installer credentials, shop drawings, and approval periods for each task order. For flooring supplied from Government warehouse stock, identify who verifies condition, quantity, compatibility, batch/shade, and warranty eligibility Specify required contractor workmanship and manufacturer warranties, their duration and commencement, and responsibility for defects in Government-furnished products or preexisting substrate conditions. Identify whether attic stock, maintenance instructions, product/lot records, manufacturer inspections, or warranty registrations are required and the CLIN covering these deliverables. Manufacture warranties will apply to all installations. 64. Reference: B.11, pp. 25-29; furnished campus maps and Baltimore floor plans. Before each task order is priced, will the Government define the number and size of phases, room vacancy windows, sequencing, and maximum area that may remain out of service? Yes, it will be defined 65. Please identify any daily requirement to reopen rooms or corridors, remove/rebuild containment, install temporary walking surfaces, or protect uncured flooring. Confirm responsibility for patient/staff relocation,clinical shutdowns, alternate egress, fire-alarm/HVAC coordination, permits, and after-hours escorts. Re-opening of rooms is the responsibility of VA personnel and the subject matter experts i.e the COR, Infection control, safety etc. 66. Establish the process for Government-directed resequencing and additional mobilizations when rooms cannot be released together or operations interrupt the approved installation/cure sequence. VA/COR will determine. 67. Reference: B.7, p. 7; B.11 Contractor Responsibilities, p. 27; Installation and Overtime, pp. 29-30. The SOW gives a 7:30 a.m. start on page 27 and a 7:00 a.m. installation start on page 29, with occasional evening/weekend work. Please confirm the normal shift, billable/productive hours, delivery windows, and the portion of work bidders must assume occurs after hours. Regular Hours are defined in the RFQ. After hours will be rare and determined based on the service needs. Quoted prior to installation. 68. How are premium shifts, overtime, weekend/holiday work, and repeated short shifts priced when the schedule has no premiumrate items? Clarify the daily/seventh-day overtime wording on page 30 and the required written approval authority, including reconciliation of service-chief approval with CO authorization for additional price or holiday work. COR will coordinate work overtime with service chief prior to installation. 69. Clarify how a task order issued near year-end is completed and which rates apply when performance spans an option boundary or a Government-directed delay Issued by CO Firm Fixed Price 70. Reference: B.9 Authorized Limits, p. 8; B.11, pp. 25-27. The BPA order limit and overall ceiling are blank, and the SOW anticipates emergent failures. Please provide the intended per-order limit, BPA ceiling, anticipated annual spending/order count, typical order size, and any minimum purchase commitment. What maximum number of simultaneous task orders, sites, and shifts must the contractor support? Define routine and emergency response times, estimating turnaround, start/completion requirements, and whether emergency standby or priority service must be included in standard rates. Clarify whether the listed annual quantities are evaluation estimates only and whether no minimum work volume is guaranteed. Estimates only. The VA cannot determine such rare occurrences pre-maturely. 71. Reference: C.2, pp. 37-38; D.1, p. 58; attached Wage Determination 2015-4265, Revision 33, pp. 1-7.The RFQ incorporates Service Contract Labor Standards and attaches WD 2015-4265, Revision 33, dated May 13, 2026. Please confirm the applicable labor-standard treatment for flooring demolition, preparation, replacement, and installation, including any construction wage determination required for particular orders. Identify the governing determination and revision for each campus; the attached locality list does not identify Cecil County for Perry Point. Clarify required classifications for resilient flooring, carpet, epoxy/coating, demolition/preparation, and hazardous-material work; the conformance procedure for unlisted work; applicable fringe benefits; and required payroll reporting.Please issue all governing determinations before final pricing. Please refer to the Wage Determination for Baltimore and Cecil County 72. Bidders must quote the base and four option years. Please clarify whether each year has independently proposed fixed unit rates and how incorporated wage/fringe adjustment provisions will be applied without duplicating escalation already priced. Identify the effective wage-determination revision for each period, required supporting documentation, notice deadlines, and treatment of orders spanning periods. Are any material-price, freight, tariff, or product-discontinuation adjustments permitted during a period, or must those risks be covered entirely in the quoted annual rates? Firm Fixed pricing/ those risks must be covered entirely in the quoted annual rates 73. Define how approved substitute flooring systems are priced if the listed product becomes unavailable during the BPA. No substitutions 74. Reference: C.7-C.8, pp. 40-41; B.9, p. 8. C.8 leaves the general-liability and automobile-liability amounts blank and requires general-liability coverage without an asbestos exclusion before award. Cannot be determined as this will be a case by case occurrence. 75. Please provide all required limits and endorsements and explain whether the asbestos provision applies when testing/abatement is performed by a separate Government contractor. Yes, asbestos provision applies when testing/abatement is performed by a separate Government contractor. 80. Identify any required pollution/professional coverage and whether approved specialty-subcontractor coverage satisfies any portion. Please also confirm whether bid, payment, performance bonds, or other payment protection will be required at BPA award or by individual task order, the applicable order thresholds, and how associated premiums are to be priced. Contractor is expected to maintain all applicable insurance coverages. 81. Confirm whether compliance is measured separately for each task order or over the base and each option period. Compliance is required on all task orders. Does the latest solicitation remain a Service-Disabled Veteran-Owned Small Business set-aside, or has it been revised to unrestricted/full-and-open competition? The public notices and third-party listings appear inconsistent. Correct it is a Service-Disabled Veteran-Owned Small Business set-aside, Were the October 20 21 site visits mandatory for quotation eligibility, or may a contractor that did not attend still quote based on the published documents? One member of the desired contracting bidder must have attended the walk-thru May a prime contractor use qualified flooring subcontractors for portions of the work, provided it quotes and manages all three VA locations and meets all applicable limitations on subcontracting? Contractors must meet all requirements for all three sites.
-Special Notice11/18/2026

Additional Details

Solicitation Number

140P6326Q0020

Archive Date

Aug 14, 2026

Office Address

Rapid City, SD, 57701